Back to bathroom remodel contractors
T & L Construction
- Based in
- San Bruno
- On San Francisco permits
- Nov 2004 to Jul 2025
- Last 24 months
- 1 permit filed
11 permits since 2000: 8 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 2 expired or cancelled. Typically 1 days from filing to permit and 111 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 24, 2025 | Completed final sign-off Sep 2025 | 2191 34th Av | to comply with nov# 2024-31086 and perform work previously approved by 2022-1227-9187: remodel 2nd floor kitchen/bathroom, replace damaged beam above living room, convert portion of ground floor garage area (260 sq ft) into a non-sleeping office and full bathroom.Details
to comply with nov# 2024-31086 and perform work previously approved by 2022-1227-9187: remodel 2nd floor kitchen/bathroom, replace damaged beam above living room, convert portion of ground floor garage area (260 sq ft) into a non-sleeping office and full bathroom. | $75,000 |
| Dec 27, 2022 | Expired or cancelled suspend Nov 2024 | 2191 34th Av | kitchen and bathroom remodel on 2nd flr; new bedroom & full bathroom on 1st flr, replace existing beam in living room area- either dry rot or inadequateDetails
kitchen and bathroom remodel on 2nd flr; new bedroom & full bathroom on 1st flr, replace existing beam in living room area- either dry rot or inadequate | $35,000 |
| Sep 12, 2022 | Completed final sign-off Mar 2023 | 225 Holyoke St | remodel e bathroom. remove e closet wall to add to bath sq footage. like for like to comply with 202294631Details
remodel e bathroom. remove e closet wall to add to bath sq footage. like for like to comply with 202294631 | $30,000 |
| Nov 16, 2009 | Expired or cancelled expired May 2011 | 1940 Sacramento St | remodel (e) bathrooms (2 total)Details
remodel (e) bathrooms (2 total) | $40,000 |
| May 15, 2008 | Completed final sign-off Sep 2008 | 2331 Jackson St | remodel ex. bathroom and master bedroom on the 3rd floor. raise ceiling for the ex. master suite, close out 5 windows, construct new french door and french balcony with guardrails.Details
remodel ex. bathroom and master bedroom on the 3rd floor. raise ceiling for the ex. master suite, close out 5 windows, construct new french door and french balcony with guardrails. | $35,000 |