Back to kitchen remodel contractors
T J Constr Inc***Ck Id,Tie Liu Only*****
- Based in
- Millbrae
- On San Francisco permits
- Sep 2008 to Nov 2020
- Last 24 months
- 0 permits filed
119 permits since 2000: 100 completed, 8 never finaled, 11 expired or cancelled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
38 kitchen remodel permits: 32 completed, 2 never finaled, 4 expired or cancelled. Typically 2 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2020 | Completed final sign-off Jan 2023 | 1454 20th Av | to comply with nov 202054696 to legalize & remodel 2 full bathroom on 2/f and 3 full bathrooms or 3/f. remodel kitchen on 2/f with all new plmbing & lighting fixtures,cabnits, countertops and finishesDetails
to comply with nov 202054696 to legalize & remodel 2 full bathroom on 2/f and 3 full bathrooms or 3/f. remodel kitchen on 2/f with all new plmbing & lighting fixtures,cabnits, countertops and finishes | $83,000 |
| Aug 15, 2019 | Never finaled issued Aug 2019, no final | 226 Sagamore St | replace kitchen cabinets. no structural work. 2nd fl.Details
replace kitchen cabinets. no structural work. 2nd fl. | $5,000 |
| May 16, 2019 | Completed final sign-off May 2021 | 109 Porter St | interior remodel - obtain the permot to relocate (e) kitchen and (e) bedroom, add a (n) full bathroom @ 2nd flDetails
interior remodel - obtain the permot to relocate (e) kitchen and (e) bedroom, add a (n) full bathroom @ 2nd fl | $15,000 |
| Jul 17, 2018 | Completed final sign-off Jun 2019 | 322 Moscow St | interior alteration ; remodel (e)basement to add (n) bedrooom & bathroom, remodel 1st fl. to add (1) bedroom & (1) bath, remodel (e) kitchen, repair (e) stair at rear as per plan. total excavation less than 50 cubic feetDetails
interior alteration ; remodel (e)basement to add (n) bedrooom & bathroom, remodel 1st fl. to add (1) bedroom & (1) bath, remodel (e) kitchen, repair (e) stair at rear as per plan. total excavation less than 50 cubic feet | $100,000 |
| May 30, 2018 | Completed final sign-off Jun 2019 | 322 Moscow St | replace kitchen cabinets. no structural work at extg building.Details
replace kitchen cabinets. no structural work at extg building. | $5,000 |
| May 27, 2015 | Completed final sign-off Jul 2017 | 238 Urbano Dr | 1st fl: add 1 living room, 1 family room, 3 full bath, and 3 bedrooms. 2nd fl: add 1 bath, remodel kitchen, and relocate internal staircase.interior remodel within building envelope per plan.Details
1st fl: add 1 living room, 1 family room, 3 full bath, and 3 bedrooms. 2nd fl: add 1 bath, remodel kitchen, and relocate internal staircase.interior remodel within building envelope per plan. | $130,000 |
| Jun 30, 2014 | Completed final sign-off Feb 2015 | 1673 Sacramento St | convert (e) 3 bedrooms to master suite, convert (e) laundry room to study area. add a full bath and remodel (e) kitchen bath at top level as per plan.Details
convert (e) 3 bedrooms to master suite, convert (e) laundry room to study area. add a full bath and remodel (e) kitchen bath at top level as per plan. | $20,000 |
| Dec 30, 2013 | Completed final sign-off Jan 2014 | 1066 Jamestown Av | comply with nov #201342751 dated 12/19/13 to demolish kitchen stove and sink at ground floor and basement level. legalize a bath at basement level.Details
comply with nov #201342751 dated 12/19/13 to demolish kitchen stove and sink at ground floor and basement level. legalize a bath at basement level. | $10,000 |
| Oct 29, 2013 | Completed final sign-off Feb 2015 | 4027 Lincoln Wy | remodeling kitchen and 2 bathroomsDetails
remodeling kitchen and 2 bathrooms | $10,000 |
| Sep 23, 2013 | Completed final sign-off Apr 2014 | 538 Natoma St | remodeling bathrooms and kitchen, paintDetails
remodeling bathrooms and kitchen, paint | $8,000 |
| Mar 22, 2013 | Completed final sign-off Oct 2013 | 726 23rd Av | remodel existing kitchen; remodel existing bathroom @ 3rd flr, add master bathroom @ 3rd flrDetails
remodel existing kitchen; remodel existing bathroom @ 3rd flr, add master bathroom @ 3rd flr | $15,000 |
| Feb 13, 2013 | Completed final sign-off Nov 2013 | 3565 Geary Bl | remodel (e) kitchen: install 3 compartment sink, prep sink, mop sink & floor sink. create rated corridor for 2nd means of egress (e) bar counter, ktichen cooking equipment, hood, ceiling, light fixtures and mech system to be remain. maximum occupant load 86.Details
remodel (e) kitchen: install 3 compartment sink, prep sink, mop sink & floor sink. create rated corridor for 2nd means of egress (e) bar counter, ktichen cooking equipment, hood, ceiling, light fixtures and mech system to be remain. maximum occupant load 86. | $20,000 |
| Oct 9, 2012 | Completed final sign-off Mar 2013 | 1151 Stockton St | comply with nov#201254601 dated: 8/9/12: repair & replace fire damage stainless steel lining, hood, walk-in-freezer & kitchen equipment as per plan.Details
comply with nov#201254601 dated: 8/9/12: repair & replace fire damage stainless steel lining, hood, walk-in-freezer & kitchen equipment as per plan. | $60,000 |
| Sep 5, 2012 | Completed final sign-off Mar 2013 | 236 Urbano Dr | remodeling kitchen, no structural work. no wall alterationsDetails
remodeling kitchen, no structural work. no wall alterations | $15,000 |
| Sep 5, 2012 | Completed final sign-off Nov 2012 | 156 20th Av | remodeling kitchen, no structural work. no wall alterationsDetails
remodeling kitchen, no structural work. no wall alterations | $10,000 |
| Jul 12, 2012 | Completed final sign-off Sep 2012 | 504 Russia Av | remodel kitchen & bathroom-replace tile & counter in kitchen & replace bathroom tile, not architectural or structuralDetails
remodel kitchen & bathroom-replace tile & counter in kitchen & replace bathroom tile, not architectural or structural | $10,000 |
| Jul 3, 2012 | Completed final sign-off Aug 2012 | 220 Vienna St | correction of n.o.v. #201289999 dated 5/29/12: revert back to the last use - remove kitchen cabinet & remove gas stove installed without permits. change of illegal use form 2 units & revert back to 1 unit.Details
correction of n.o.v. #201289999 dated 5/29/12: revert back to the last use - remove kitchen cabinet & remove gas stove installed without permits. change of illegal use form 2 units & revert back to 1 unit. | $2,000 |
| Dec 15, 2011 | Completed final sign-off Jun 2013 | 1401 Thomas Av | to comply complaint #201173274- change windows (4) at rear and replace kitchen cabinets and tile, paint. no electrical.Details
to comply complaint #201173274- change windows (4) at rear and replace kitchen cabinets and tile, paint. no electrical. | $4,500 |
| Dec 12, 2011 | Completed final sign-off Mar 2013 | 801 Kearny St | revision for tenant improvements under permit #201108263430. pg &e meter locations. install new kitchen equipment, new refrigeration, new counters for accessiblity.Details
revision for tenant improvements under permit #201108263430. pg &e meter locations. install new kitchen equipment, new refrigeration, new counters for accessiblity. | $20,000 |
| Oct 19, 2011 | Expired or cancelled expired Sep 2013 | 166 Byxbee St | remodel 2/f: kitchen & 2 bathrooms, 3 bedrooms and dining room. dining room h.e. lights per cec150(k)Details
remodel 2/f: kitchen & 2 bathrooms, 3 bedrooms and dining room. dining room h.e. lights per cec150(k) | $20,000 |
| Sep 12, 2011 | Completed final sign-off Feb 2012 | 727 Goettingen St | repair fire damaged - sheetrock,floor, window, kitchen,bathroom. non-structural work.Details
repair fire damaged - sheetrock,floor, window, kitchen,bathroom. non-structural work. | $15,000 |
| Aug 26, 2011 | Completed final sign-off Mar 2013 | 801 Kearny St | revision approved #201010283973 remodel commercial space to dining rm. install bar counter & stairway @ 2nd. flr. (restaurant) relocate kitchen to basement from ground flr. as pe plan (fire extinguising system, fier sprinkler syste, mep permit under separate permit.Details
revision approved #201010283973 remodel commercial space to dining rm. install bar counter & stairway @ 2nd. flr. (restaurant) relocate kitchen to basement from ground flr. as pe plan (fire extinguising system, fier sprinkler syste, mep permit under separate permit. | $5,000 |
| Jul 18, 2011 | Completed final sign-off Sep 2011 | 1326 Powell St | comply w/nov# 201150548-t.i to (e) restaurant correction action-repair damaged floor & re-tile. replace/clean and/or install new quarry tile at kitchen area. repair kitchen equipment as required. update (e) restrooms for ada handicap restroomsDetails
comply w/nov# 201150548-t.i to (e) restaurant correction action-repair damaged floor & re-tile. replace/clean and/or install new quarry tile at kitchen area. repair kitchen equipment as required. update (e) restrooms for ada handicap restrooms | $6,000 |
| Jul 7, 2011 | Completed final sign-off Jun 2012 | 271 Marina Bl | remodel e kitchen at 2nd floor level. remodel e bath at 3rd floor level and closetsDetails
remodel e kitchen at 2nd floor level. remodel e bath at 3rd floor level and closets | $25,000 |
| May 27, 2011 | Completed final sign-off Feb 2012 | 230 Urbano Dr | remodel 1st floor, add 2 new bedrooms, convert e family room to bedroom, add 3 new full baths, new family room, play and storage rooms. remodel 2nd fl kitchen, add 2 new baths, relocate interior stairsDetails
remodel 1st floor, add 2 new bedrooms, convert e family room to bedroom, add 3 new full baths, new family room, play and storage rooms. remodel 2nd fl kitchen, add 2 new baths, relocate interior stairs | $100,000 |
| Apr 13, 2011 | Completed final sign-off Jul 2011 | 667 Paris St | remodeling kitchen & bathroom @ 2nd. flr.Details
remodeling kitchen & bathroom @ 2nd. flr. | $15,000 |
| Feb 17, 2011 | Completed final sign-off Jul 2011 | 50 South Hill Bl | legalize (e) 1 bedroom, 1 family room, 1 storage at 1st foor (garage). replace (e) windows with vinyl frame windows at rear yards. install 2 new vinyl windows at rear yard. kitchen remodelDetails
legalize (e) 1 bedroom, 1 family room, 1 storage at 1st foor (garage). replace (e) windows with vinyl frame windows at rear yards. install 2 new vinyl windows at rear yard. kitchen remodel | $20,000 |
| Feb 8, 2011 | Completed final sign-off Mar 2011 | 77 Santa Cruz Av | remodeling kitchen and bathroom.Details
remodeling kitchen and bathroom. | $20,000 |
| Nov 30, 2010 | Expired or cancelled expired Feb 2013 | 170 Graystone Tr | #8- replace kitchen cabinets only.Details
#8- replace kitchen cabinets only. | $4,200 |
| Oct 28, 2010 | Completed final sign-off Mar 2013 | 801 Kearny St | (n) full service restaurant remodeling: install (n) handicap toiletss bar counter. service counter, kitchen equipment. two type-1 hoods & adding additional square footage to (e) bldg. as per plan. mep under separate permit.Details
(n) full service restaurant remodeling: install (n) handicap toiletss bar counter. service counter, kitchen equipment. two type-1 hoods & adding additional square footage to (e) bldg. as per plan. mep under separate permit. | $300,000 |
| Oct 25, 2010 | Never finaled issued Oct 2010, no final | 1749 Polk St | unit #2: replace kitchen cabinet and couner top, one bathroom remodel (no structural) no new lightingDetails
unit #2: replace kitchen cabinet and couner top, one bathroom remodel (no structural) no new lighting | $6,500 |
| Mar 19, 2010 | Completed final sign-off Feb 2011 | 2025 Keith St | relocate kitchen at ground floor, relocate full bathroom to hallway are ground floor. construct 1/2 bathroom @ 2nd floor. replace (12) windows all around to vinyl windows.Details
relocate kitchen at ground floor, relocate full bathroom to hallway are ground floor. construct 1/2 bathroom @ 2nd floor. replace (12) windows all around to vinyl windows. | $30,000 |
| Feb 2, 2010 | Completed final sign-off Jul 2010 | 1167 Harrison St | revision to pa# 2009-1026-9847-install kitchen equipment-hood, char broiler, stove, burner & fryer. fire extinguishing system under seperate permitDetails
revision to pa# 2009-1026-9847-install kitchen equipment-hood, char broiler, stove, burner & fryer. fire extinguishing system under seperate permit | $20,000 |
| Aug 4, 2009 | Completed final sign-off Sep 2012 | 5642 Mission St | blk 7098 lots 8 & 9 were merged to become lot 021,old lot #8 now has a storage shed&garage will demo in a sep permit.the (e)bldg on blk 7098 old lot #9 will altered&add on to become a larger building.on 1/fl worship areas,kitchen,multi purpose rm bathrm,bedrm.2/fl to have living bedrm.Details
blk 7098 lots 8 & 9 were merged to become lot 021,old lot #8 now has a storage shed&garage will demo in a sep permit.the (e)bldg on blk 7098 old lot #9 will altered&add on to become a larger building.on 1/fl worship areas,kitchen,multi purpose rm bathrm,bedrm.2/fl to have living bedrm. | $880,000 |
| Apr 27, 2009 | Completed final sign-off Jul 2009 | 170 Nueva Av | remodeling kitchen and install new lighting & dinning room.Details
remodeling kitchen and install new lighting & dinning room. | $18,000 |
| Feb 25, 2009 | Expired or cancelled expired Oct 2011 | 2078 21st Av | revision of approved application # 2008/1105/5927. re-design existing kitchen at 2nd. flr. as per plan. no mechanical work.Details
revision of approved application # 2008/1105/5927. re-design existing kitchen at 2nd. flr. as per plan. no mechanical work. | $3,000 |
| Feb 17, 2009 | Completed final sign-off May 2009 | 1396 28th Av | remodeling 2 bathrooms and kitchen. dining room, living room, 2 bedrooms.Details
remodeling 2 bathrooms and kitchen. dining room, living room, 2 bedrooms. | $28,500 |
| Nov 5, 2008 | Expired or cancelled expired Mar 2011 | 2078 21st Av | relocate interior stairs from 1st fl to 2nd fl. remodel (e) kitchen, dining room, bathroom at 2nd floor. enclosed (e) light court (lightwell) at 2nd fl. new skylights at 2nd floor. install bedroom, family room, storage and bathroom at 1st floorDetails
relocate interior stairs from 1st fl to 2nd fl. remodel (e) kitchen, dining room, bathroom at 2nd floor. enclosed (e) light court (lightwell) at 2nd fl. new skylights at 2nd floor. install bedroom, family room, storage and bathroom at 1st floor | $100,000 |