Back to bathroom remodel contractors
T J Constr Inc***Ck Id,Tie Liu Only*****
- Based in
- Millbrae
- On San Francisco permits
- Sep 2008 to Nov 2020
- Last 24 months
- 0 permits filed
119 permits since 2000: 100 completed, 8 never finaled, 11 expired or cancelled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
39 bathroom remodel permits: 35 completed, 2 never finaled, 2 expired or cancelled. Typically 3 days from filing to permit and 244 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 12, 2020 | Completed final sign-off Jan 2023 | 1454 20th Av | infill ground fl 183 sf under 2nd fl to be habitable spaces. remodel gound fl to have bedroom, family room, home office, 2 full bathrooms, laundry closet. install gas furnace and water heater in garage.Details
infill ground fl 183 sf under 2nd fl to be habitable spaces. remodel gound fl to have bedroom, family room, home office, 2 full bathrooms, laundry closet. install gas furnace and water heater in garage. | $48,000 |
| Nov 10, 2020 | Completed final sign-off Jan 2023 | 1454 20th Av | to comply with nov 202054696 to legalize & remodel 2 full bathroom on 2/f and 3 full bathrooms or 3/f. remodel kitchen on 2/f with all new plmbing & lighting fixtures,cabnits, countertops and finishesDetails
to comply with nov 202054696 to legalize & remodel 2 full bathroom on 2/f and 3 full bathrooms or 3/f. remodel kitchen on 2/f with all new plmbing & lighting fixtures,cabnits, countertops and finishes | $83,000 |
| May 16, 2019 | Completed final sign-off May 2021 | 109 Porter St | interior remodel - obtain the permot to relocate (e) kitchen and (e) bedroom, add a (n) full bathroom @ 2nd flDetails
interior remodel - obtain the permot to relocate (e) kitchen and (e) bedroom, add a (n) full bathroom @ 2nd fl | $15,000 |
| Dec 26, 2018 | Completed final sign-off May 2021 | 109 Porter St | interior remodel - add 1 master suite. privat office/family room, bath and mud room at ground flr. relocate (e) interior stairs at 2nd flr. new opening window at rear at g/fDetails
interior remodel - add 1 master suite. privat office/family room, bath and mud room at ground flr. relocate (e) interior stairs at 2nd flr. new opening window at rear at g/f | $35,000 |
| Aug 29, 2018 | Completed final sign-off May 2021 | 109 Porter St | demo non bearing wall. relocate bath at 2nd floor.Details
demo non bearing wall. relocate bath at 2nd floor. | $1,000 |
| Jul 17, 2018 | Completed final sign-off Jun 2019 | 322 Moscow St | interior alteration ; remodel (e)basement to add (n) bedrooom & bathroom, remodel 1st fl. to add (1) bedroom & (1) bath, remodel (e) kitchen, repair (e) stair at rear as per plan. total excavation less than 50 cubic feetDetails
interior alteration ; remodel (e)basement to add (n) bedrooom & bathroom, remodel 1st fl. to add (1) bedroom & (1) bath, remodel (e) kitchen, repair (e) stair at rear as per plan. total excavation less than 50 cubic feet | $100,000 |
| May 27, 2015 | Completed final sign-off Jul 2017 | 238 Urbano Dr | 1st fl: add 1 living room, 1 family room, 3 full bath, and 3 bedrooms. 2nd fl: add 1 bath, remodel kitchen, and relocate internal staircase.interior remodel within building envelope per plan.Details
1st fl: add 1 living room, 1 family room, 3 full bath, and 3 bedrooms. 2nd fl: add 1 bath, remodel kitchen, and relocate internal staircase.interior remodel within building envelope per plan. | $130,000 |
| Mar 17, 2015 | Completed final sign-off Dec 2017 | 851 Girard St | g/f-construct 2 (n)bedrooms and 2 bathrooms, family room and storage room on grd flr. no work on 2/f; 2 (n) windows added facing rear yard.Details
g/f-construct 2 (n)bedrooms and 2 bathrooms, family room and storage room on grd flr. no work on 2/f; 2 (n) windows added facing rear yard. | $10,000 |
| Jun 30, 2014 | Completed final sign-off Feb 2015 | 1673 Sacramento St | convert (e) 3 bedrooms to master suite, convert (e) laundry room to study area. add a full bath and remodel (e) kitchen bath at top level as per plan.Details
convert (e) 3 bedrooms to master suite, convert (e) laundry room to study area. add a full bath and remodel (e) kitchen bath at top level as per plan. | $20,000 |
| Dec 30, 2013 | Completed final sign-off Jan 2014 | 1066 Jamestown Av | comply with nov #201342751 dated 12/19/13 to demolish kitchen stove and sink at ground floor and basement level. legalize a bath at basement level.Details
comply with nov #201342751 dated 12/19/13 to demolish kitchen stove and sink at ground floor and basement level. legalize a bath at basement level. | $10,000 |
| Oct 29, 2013 | Completed final sign-off Feb 2015 | 4027 Lincoln Wy | remodeling kitchen and 2 bathroomsDetails
remodeling kitchen and 2 bathrooms | $10,000 |
| Oct 9, 2013 | Completed final sign-off Jun 2014 | 1669 Sacramento St | comply with nov 201321831, 201325701, 201322691, 201321402. construct two full and one half-bath; two study rooms, one office, one family room, two storage rooms, exercise room, foyer and laundry room on ground floor for unit #1669. replace window (in kind) at rear.Details
comply with nov 201321831, 201325701, 201322691, 201321402. construct two full and one half-bath; two study rooms, one office, one family room, two storage rooms, exercise room, foyer and laundry room on ground floor for unit #1669. replace window (in kind) at rear. | $40,000 |
| Sep 23, 2013 | Completed final sign-off Apr 2014 | 538 Natoma St | remodeling bathrooms and kitchen, paintDetails
remodeling bathrooms and kitchen, paint | $8,000 |
| Apr 22, 2013 | Completed final sign-off Nov 2013 | 1326 11th Av | comply w/nov #201385673 to demolish illegal addition area. build in 10' x 10' - 8' ht max. shed at rear yard. replace damaged bathtub & tiles at ground floor bathroom.Details
comply w/nov #201385673 to demolish illegal addition area. build in 10' x 10' - 8' ht max. shed at rear yard. replace damaged bathtub & tiles at ground floor bathroom. | $4,000 |
| Mar 22, 2013 | Completed final sign-off Oct 2013 | 726 23rd Av | remodel existing kitchen; remodel existing bathroom @ 3rd flr, add master bathroom @ 3rd flrDetails
remodel existing kitchen; remodel existing bathroom @ 3rd flr, add master bathroom @ 3rd flr | $15,000 |
| Feb 19, 2013 | Completed final sign-off Jul 2013 | 722 Jackson St | #5- replace bathroom wall tile and paint.Details
#5- replace bathroom wall tile and paint. | $3,000 |
| Jan 3, 2013 | Completed final sign-off Feb 2013 | 111 Country Club Dr | remodeling 2nd floor bathroomDetails
remodeling 2nd floor bathroom | $12,000 |
| Jul 12, 2012 | Completed final sign-off Sep 2012 | 504 Russia Av | remodel kitchen & bathroom-replace tile & counter in kitchen & replace bathroom tile, not architectural or structuralDetails
remodel kitchen & bathroom-replace tile & counter in kitchen & replace bathroom tile, not architectural or structural | $10,000 |
| Oct 19, 2011 | Expired or cancelled expired Sep 2013 | 166 Byxbee St | remodel 2/f: kitchen & 2 bathrooms, 3 bedrooms and dining room. dining room h.e. lights per cec150(k)Details
remodel 2/f: kitchen & 2 bathrooms, 3 bedrooms and dining room. dining room h.e. lights per cec150(k) | $20,000 |
| Sep 12, 2011 | Completed final sign-off Nov 2012 | 921 Sunnydale Av | bathroom - first floor level - remodeling same location.Details
bathroom - first floor level - remodeling same location. | $3,500 |
| Sep 12, 2011 | Completed final sign-off Feb 2012 | 727 Goettingen St | repair fire damaged - sheetrock,floor, window, kitchen,bathroom. non-structural work.Details
repair fire damaged - sheetrock,floor, window, kitchen,bathroom. non-structural work. | $15,000 |
| Jul 7, 2011 | Completed final sign-off Jun 2012 | 271 Marina Bl | remodel e kitchen at 2nd floor level. remodel e bath at 3rd floor level and closetsDetails
remodel e kitchen at 2nd floor level. remodel e bath at 3rd floor level and closets | $25,000 |
| May 27, 2011 | Completed final sign-off Feb 2012 | 230 Urbano Dr | remodel 1st floor, add 2 new bedrooms, convert e family room to bedroom, add 3 new full baths, new family room, play and storage rooms. remodel 2nd fl kitchen, add 2 new baths, relocate interior stairsDetails
remodel 1st floor, add 2 new bedrooms, convert e family room to bedroom, add 3 new full baths, new family room, play and storage rooms. remodel 2nd fl kitchen, add 2 new baths, relocate interior stairs | $100,000 |
| Apr 13, 2011 | Completed final sign-off Jul 2011 | 667 Paris St | remodeling kitchen & bathroom @ 2nd. flr.Details
remodeling kitchen & bathroom @ 2nd. flr. | $15,000 |
| Mar 11, 2011 | Completed final sign-off Feb 2012 | 1839 20th Av | add family room, office & full bath @ ground floor. rebuilt interior stair. enclose lower space for office.Details
add family room, office & full bath @ ground floor. rebuilt interior stair. enclose lower space for office. | $45,000 |
| Mar 4, 2011 | Completed final sign-off Nov 2011 | 2507 28th Av | 1st floor remodel. add 2 new bedrooms,1 new storage room and 1 new bathroom at ground floor.Details
1st floor remodel. add 2 new bedrooms,1 new storage room and 1 new bathroom at ground floor. | $30,000 |
| Feb 8, 2011 | Completed final sign-off Mar 2011 | 77 Santa Cruz Av | remodeling kitchen and bathroom.Details
remodeling kitchen and bathroom. | $20,000 |
| Oct 25, 2010 | Never finaled issued Oct 2010, no final | 1749 Polk St | unit #2: replace kitchen cabinet and couner top, one bathroom remodel (no structural) no new lightingDetails
unit #2: replace kitchen cabinet and couner top, one bathroom remodel (no structural) no new lighting | $6,500 |
| Mar 19, 2010 | Completed final sign-off Feb 2011 | 2025 Keith St | relocate kitchen at ground floor, relocate full bathroom to hallway are ground floor. construct 1/2 bathroom @ 2nd floor. replace (12) windows all around to vinyl windows.Details
relocate kitchen at ground floor, relocate full bathroom to hallway are ground floor. construct 1/2 bathroom @ 2nd floor. replace (12) windows all around to vinyl windows. | $30,000 |
| Nov 10, 2009 | Completed final sign-off Aug 2010 | 56 Topeka Av | comply w/ nov#200863842, dated 07/07/2008 legalizing ground floor; room #1 change to bedroom, room #2 to (n) storage, room #3 to (n) family room & add a full bath, half bath. install drywall @ garage ceiling & walls as per plan.Details
comply w/ nov#200863842, dated 07/07/2008 legalizing ground floor; room #1 change to bedroom, room #2 to (n) storage, room #3 to (n) family room & add a full bath, half bath. install drywall @ garage ceiling & walls as per plan. | $25,000 |
| Oct 16, 2009 | Completed final sign-off Feb 2010 | 146 Farragut Av | add two bedrooms, one storage room, 2-bathrooms and laundry on first floor. adding a new bathroom on 2nd. floor. replace stairway at rear.Details
add two bedrooms, one storage room, 2-bathrooms and laundry on first floor. adding a new bathroom on 2nd. floor. replace stairway at rear. | $38,000 |
| Sep 18, 2009 | Completed final sign-off Jul 2010 | 37 Del Monte St | legalize first floor bedroom, bathroom & laundry per plan.Details
legalize first floor bedroom, bathroom & laundry per plan. | $18,000 |
| Jun 16, 2009 | Completed final sign-off Mar 2010 | 733 Santiago St | 1st floor (garage)-demo (e) non-bearing walls at bathroom, bedroom & laundry. construct non bearing walls for new bathroom, family room, bedroom & storage.Details
1st floor (garage)-demo (e) non-bearing walls at bathroom, bedroom & laundry. construct non bearing walls for new bathroom, family room, bedroom & storage. | $45,000 |
| May 8, 2009 | Never finaled issued May 2009, no final | 531 Girard St | replace bathroom tile 100 sq ft.Details
replace bathroom tile 100 sq ft. | $2,000 |
| Feb 17, 2009 | Completed final sign-off May 2009 | 1396 28th Av | remodeling 2 bathrooms and kitchen. dining room, living room, 2 bedrooms.Details
remodeling 2 bathrooms and kitchen. dining room, living room, 2 bedrooms. | $28,500 |
| Jan 14, 2009 | Completed final sign-off Feb 2009 | 1442 46th Av | 1 bathroom remodel. new toilet. new bathtub. new sheetrock. new tiles. new plumbing. new electrical.Details
1 bathroom remodel. new toilet. new bathtub. new sheetrock. new tiles. new plumbing. new electrical. | $11,700 |
| Nov 7, 2008 | Completed final sign-off May 2009 | 531 38th Av | construction three bedrm, (including one in-fill), laundry rm & two full bath rm, all work at ground floor.Details
construction three bedrm, (including one in-fill), laundry rm & two full bath rm, all work at ground floor. | $72,000 |
| Nov 5, 2008 | Expired or cancelled expired Mar 2011 | 2078 21st Av | relocate interior stairs from 1st fl to 2nd fl. remodel (e) kitchen, dining room, bathroom at 2nd floor. enclosed (e) light court (lightwell) at 2nd fl. new skylights at 2nd floor. install bedroom, family room, storage and bathroom at 1st floorDetails
relocate interior stairs from 1st fl to 2nd fl. remodel (e) kitchen, dining room, bathroom at 2nd floor. enclosed (e) light court (lightwell) at 2nd fl. new skylights at 2nd floor. install bedroom, family room, storage and bathroom at 1st floor | $100,000 |
| Sep 19, 2008 | Completed final sign-off Jan 2009 | 431 Balboa St | barrier removal, 2 new hc. bathrooms,remove some non load bearing walls. no exterior work.Details
barrier removal, 2 new hc. bathrooms,remove some non load bearing walls. no exterior work. | $20,000 |