Back to kitchen remodel contractors
Surtec Construction Co Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2009 to Dec 2025
- Last 24 months
- 2 permits filed
36 permits since 2000: 35 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 15 completed, 1 never finaled. Typically 0 days from filing to permit and 149 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 9, 2025 | Completed final sign-off Jun 2026 | 1630 Oakdale Av | 2nd and 3rd floor: replace kitchen cabinet, countertop, hardwares accessory, bathroom bathtop, vanity hardwares accessory, tub replace with walk in shower, flooring, vinyl floor and interior painting.Details
2nd and 3rd floor: replace kitchen cabinet, countertop, hardwares accessory, bathroom bathtop, vanity hardwares accessory, tub replace with walk in shower, flooring, vinyl floor and interior painting. | $138,000 |
| Jan 18, 2023 | Completed final sign-off Aug 2023 | 691 Panorama Dr | remodel kitchen: replace kitchen cabinets, stove, dishwasher, upgrade electrical outlets for kitchen, recessed lights, new flooring, and fixtures. approx room size 10 x 12 ~ 120 sqft.Details
remodel kitchen: replace kitchen cabinets, stove, dishwasher, upgrade electrical outlets for kitchen, recessed lights, new flooring, and fixtures. approx room size 10 x 12 ~ 120 sqft. | $25,000 |
| May 5, 2021 | Completed final sign-off Feb 2022 | 1751 Hyde St | remodel bathroom, shower pan, install tile, appliances. remodel kitchen, cabinets, counter top hood, vents appliances. install new insulation for exterior wall. no work to front facade per this review.7 windows only rear and side same size.no walls movingDetails
remodel bathroom, shower pan, install tile, appliances. remodel kitchen, cabinets, counter top hood, vents appliances. install new insulation for exterior wall. no work to front facade per this review.7 windows only rear and side same size.no walls moving | $80,000 |
| Jul 27, 2020 | Completed final sign-off Sep 2020 | 300 Precita Av | replace kitchen tiles, vinyl & painting inside the bldg, no walls will be move. work is @ 1st floor.Details
replace kitchen tiles, vinyl & painting inside the bldg, no walls will be move. work is @ 1st floor. | $3,000 |
| Feb 20, 2020 | Completed final sign-off May 2022 | 1086 Alabama St | renovate 2nd level including extg kitchen and bath, new 1/2 bath. renovate 1st level including new bedroom, bath and laundry. renovate front east facade.Details
renovate 2nd level including extg kitchen and bath, new 1/2 bath. renovate 1st level including new bedroom, bath and laundry. renovate front east facade. | $215,000 |
| May 22, 2017 | Completed final sign-off Sep 2017 | 455 30th Av | at 3rd fl repair e fire damaged kitchen and dining rm area. relocel e bath, replace furnace, replace e rea and side window. alteration at 3rd floor; remove walls.Details
at 3rd fl repair e fire damaged kitchen and dining rm area. relocel e bath, replace furnace, replace e rea and side window. alteration at 3rd floor; remove walls. | $30,000 |
| Oct 27, 2016 | Never finaled issued Oct 2017, no final | 2826 Gough St | rear structure - add family room, den, kitchen & living room on 1/f, add interior stair case to create interior connection between 1/f & 2/f (unit #c), re-configure interior layout on 2/f.Details
rear structure - add family room, den, kitchen & living room on 1/f, add interior stair case to create interior connection between 1/f & 2/f (unit #c), re-configure interior layout on 2/f. | $60,000 |
| Aug 25, 2016 | Completed final sign-off Jan 2017 | 2437 Ortega St | alter (e) floor layout including demolitoin & construction at 2nd floor. remodel (e) kitchen, dining, bath & construct new half toilet.Details
alter (e) floor layout including demolitoin & construction at 2nd floor. remodel (e) kitchen, dining, bath & construct new half toilet. | $15,000 |
| Mar 23, 2016 | Completed final sign-off Oct 2016 | 1817 44th Av | remodel kitchen & bathroom, no walls removed, moved added or infilled, all existing layouts to remain unchangedDetails
remodel kitchen & bathroom, no walls removed, moved added or infilled, all existing layouts to remain unchanged | $20,000 |
| Nov 10, 2015 | Completed final sign-off Feb 2016 | 2383 27th Av | 2/f- remodel (e) kitchen and bathroom, new outlet and light fixtures, upgrade (e) electric panel.Details
2/f- remodel (e) kitchen and bathroom, new outlet and light fixtures, upgrade (e) electric panel. | $20,000 |
| Apr 30, 2013 | Completed final sign-off Nov 2013 | 2240 Larkin St | replace dry wall, repl the new wire, remodel the kitchen, bathrm, relocation sub-panel, no structural work all work in unit #102Details
replace dry wall, repl the new wire, remodel the kitchen, bathrm, relocation sub-panel, no structural work all work in unit #102 | $25,500 |
| Feb 7, 2013 | Completed final sign-off Nov 2013 | 1558 Van Dyke Av | remodel kitchen, replace cabinet & countertop, circuit breakers, outlet, switches, sink & furnace.Details
remodel kitchen, replace cabinet & countertop, circuit breakers, outlet, switches, sink & furnace. | $12,000 |
| Aug 12, 2011 | Completed final sign-off Sep 2011 | 1391 08th Av | to comply with complaint # 201149008 dated 7/6/2011. kitchen cabinet and countertop replacement due to wear and tear.Details
to comply with complaint # 201149008 dated 7/6/2011. kitchen cabinet and countertop replacement due to wear and tear. | $2,500 |
| Jul 5, 2011 | Completed final sign-off Aug 2011 | 5337 California St | remodel a kitchen, replace cabinets, counter and flooringDetails
remodel a kitchen, replace cabinets, counter and flooring | $8,000 |
| Feb 22, 2011 | Completed final sign-off Jul 2011 | 2250 31st Av | add a master bathroom, modify (e) kitchen, add a exercise room. legalize (e) bedroom, bathroom & family room on 1st floor.Details
add a master bathroom, modify (e) kitchen, add a exercise room. legalize (e) bedroom, bathroom & family room on 1st floor. | $38,000 |
| Feb 15, 2011 | Completed final sign-off Apr 2011 | 3657 Mission St | remodel kitchen, change cabinets and counter top, tile floorDetails
remodel kitchen, change cabinets and counter top, tile floor | $2,000 |