Superb Builders Inc **See Notes**
- Based in
- San Francisco
- On San Francisco permits
- Aug 2015 to Jun 2021
- Last 24 months
- 0 permits filed
125 permits since 2000: 96 completed, 14 never finaled, 15 expired or cancelled.
Of the 14 never-finaled permits, 10 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 5 completed, 1 never finaled, 1 expired or cancelled. Typically 49 days from filing to permit and 492 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2020 | Never finaled issued Oct 2020, no final | 12 Roscoe St | remodel interior of e residence, covnert 676 sq ft of garage to habitable: 2 bdrms, 2 full bath, fam rm, laundry. add 199 sq ft dormers at roof, 3rd fl add 27 sq ft hab space: new mstr bdrm, bath, add 254 sq ft patio at rear. new stair frm gr fl to 2nd fl, 2nd fl to 3rd flDetails
remodel interior of e residence, covnert 676 sq ft of garage to habitable: 2 bdrms, 2 full bath, fam rm, laundry. add 199 sq ft dormers at roof, 3rd fl add 27 sq ft hab space: new mstr bdrm, bath, add 254 sq ft patio at rear. new stair frm gr fl to 2nd fl, 2nd fl to 3rd fl | $150,000 |
| Mar 18, 2019 | Expired or cancelled expired Jan 2023 | 275 Valdez Av | add new conditioned space @ ground floor w/2 bedrooms, bathroom, laundry and family room. remodel (e) kitchen and bathroom @ 2nd floor. replace/add windows. relocate interior stairs and do structural workDetails
add new conditioned space @ ground floor w/2 bedrooms, bathroom, laundry and family room. remodel (e) kitchen and bathroom @ 2nd floor. replace/add windows. relocate interior stairs and do structural work | $180,000 |
| Dec 20, 2018 | Completed final sign-off Nov 2019 | 2274 39th Av | interior remodel on 2nd fl- to remodel kitchen, bath, remove fireplace, add skylights, replace internal stair and frame in e roof opening. gr fl add master suite, great rm, laundry closet and entry foyerDetails
interior remodel on 2nd fl- to remodel kitchen, bath, remove fireplace, add skylights, replace internal stair and frame in e roof opening. gr fl add master suite, great rm, laundry closet and entry foyer | $150,000 |
| Jun 27, 2017 | Completed final sign-off Nov 2018 | 145 Richardson Av | kitchen remodel including removal/replacement of interior walls & reconfiguration of (e) stair layout from ground to 2nd floor; misc, new lighting & electrical; new kitchen cabinets & interior finishes; removal & infill of existing north exterior elevation window on ground floorDetails
kitchen remodel including removal/replacement of interior walls & reconfiguration of (e) stair layout from ground to 2nd floor; misc, new lighting & electrical; new kitchen cabinets & interior finishes; removal & infill of existing north exterior elevation window on ground floor | $48,000 |
| Aug 16, 2016 | Completed final sign-off Dec 2017 | 170 Bridgeview Dr | convert (e) unfinished space to living space. add family rm, entertainment rm, 3 bedrooms, 3 full baths. perform voluntary seismic strengthening. upgrade elec panel add furnance & water heater. rebuild (e) dryrot balconies & staircase at rear in kind;Details
convert (e) unfinished space to living space. add family rm, entertainment rm, 3 bedrooms, 3 full baths. perform voluntary seismic strengthening. upgrade elec panel add furnance & water heater. rebuild (e) dryrot balconies & staircase at rear in kind; | $150,000 |
| Nov 25, 2015 | Completed final sign-off Dec 2018 | 2312 Castro St | fix side fire damage from neighbor. strengthen walls for future building of 3rd level, ground floor - add powder room, relocate (e) interior staircase; 1st floor - relocate kitchen, remove (e) bathroom, re-arrange layout of living space, replace (e) backDetails
fix side fire damage from neighbor. strengthen walls for future building of 3rd level, ground floor - add powder room, relocate (e) interior staircase; 1st floor - relocate kitchen, remove (e) bathroom, re-arrange layout of living space, replace (e) back | $200,000 |
| Aug 6, 2015 | Completed final sign-off Sep 2017 | 172 Carl St | 1st floor, new habitable space with stair to lower unit at 2nd floor & 3rd floor remodel. kitchens and 2 bathrooms each floor, new stair to new roof deck. new elevator all floorsDetails
1st floor, new habitable space with stair to lower unit at 2nd floor & 3rd floor remodel. kitchens and 2 bathrooms each floor, new stair to new roof deck. new elevator all floors | $250,000 |