Back to bathroom remodel contractors
Superb Builders Inc **See Notes**
- Based in
- San Francisco
- On San Francisco permits
- Aug 2015 to Jun 2021
- Last 24 months
- 0 permits filed
125 permits since 2000: 96 completed, 14 never finaled, 15 expired or cancelled.
Of the 14 never-finaled permits, 10 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
70 bathroom remodel permits: 55 completed, 6 never finaled, 9 expired or cancelled. Typically 0 days from filing to permit and 132 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2021 | Expired or cancelled cancelled Jan 2026 | 618 18th Av | relocation and remodeling of kitchen, remodeling bathroom.Details
relocation and remodeling of kitchen, remodeling bathroom. | $90,000 |
| Jun 2, 2021 | Completed final sign-off Jan 2022 | 639 17th Av | one guest bathroom remodel in kind. plumbing as needed, new plumbing fixtures,new electrical as needed. same locations, no exterior changes, replacement shower pan new gfc1 outlet and led lights.Details
one guest bathroom remodel in kind. plumbing as needed, new plumbing fixtures,new electrical as needed. same locations, no exterior changes, replacement shower pan new gfc1 outlet and led lights. | $25,000 |
| Mar 1, 2021 | Completed final sign-off Sep 2021 | 7033 Geary Bl | cosmetic kitchen and bathroom remodel. kitchen: replace cabinetry and sink in kind in same location. keep (e) range, rangehood, and dishwasher. bathroom: replace toilet and vanity in kind in same location. convert (e) but to shower and retile shower walls in same location. replace lighting, switchesDetails
cosmetic kitchen and bathroom remodel. kitchen: replace cabinetry and sink in kind in same location. keep (e) range, rangehood, and dishwasher. bathroom: replace toilet and vanity in kind in same location. convert (e) but to shower and retile shower walls in same location. replace lighting, switches | $42,000 |
| Feb 8, 2021 | Completed final sign-off Oct 2021 | 446 20th Av | unit #3 and unit #6: project will be cosmetic renovation of an extg kitchen, bathroom, living room, 2 bedrooms and hallway. the scope of the project does not include any alterations affecting structural components, demising walls or acoustical seperations.Details
unit #3 and unit #6: project will be cosmetic renovation of an extg kitchen, bathroom, living room, 2 bedrooms and hallway. the scope of the project does not include any alterations affecting structural components, demising walls or acoustical seperations. | $74,000 |
| Oct 14, 2020 | Expired or cancelled expired Apr 2026 | 368 San Carlos St | remodel in kind bathroom (6x12.9), kitchen (11.8x12.9) and laundry room (10.1x5.4). full electrical and plumbing upgrade throughout the unitDetails
remodel in kind bathroom (6x12.9), kitchen (11.8x12.9) and laundry room (10.1x5.4). full electrical and plumbing upgrade throughout the unit | $25,000 |
| Oct 7, 2020 | Completed final sign-off May 2023 | 25 Hidalgo Tr | renovate home. relocate kitchen, dining rm, living rm to 1st flr, add half bath. 2nd flr - create bedrm, den, home office, add 2 (n) baths. renovate (e) bath. (n) sliding doors to side light court & rear. no work visible from public way.Details
renovate home. relocate kitchen, dining rm, living rm to 1st flr, add half bath. 2nd flr - create bedrm, den, home office, add 2 (n) baths. renovate (e) bath. (n) sliding doors to side light court & rear. no work visible from public way. | $185,000 |
| Oct 2, 2020 | Never finaled issued Nov 2020, no final | 1200 Gough St | unit 10e -interior kitchen and bathroom remodel, reconfiguration of interior partition walls; no exterior work, no structural work, no common wall work, no new or reconfiguration work of hvac systemDetails
unit 10e -interior kitchen and bathroom remodel, reconfiguration of interior partition walls; no exterior work, no structural work, no common wall work, no new or reconfiguration work of hvac system | $45,000 |
| Sep 2, 2020 | Completed final sign-off Dec 2020 | 145 Broderick St | apt 202: remodel 1 bathroom, in-kind. replce new plumbing fixturs, upgrade electrical as needed, no walls to be modified, no exterior work. new shower pan.Details
apt 202: remodel 1 bathroom, in-kind. replce new plumbing fixturs, upgrade electrical as needed, no walls to be modified, no exterior work. new shower pan. | $15,000 |
| Sep 2, 2020 | Completed final sign-off May 2021 | 727 Foerster St | remodel 1 bathroom & 1 kitchen, in-kind. upgrade electrical & plumbing as need. no exterior work. no walls to be changed.Details
remodel 1 bathroom & 1 kitchen, in-kind. upgrade electrical & plumbing as need. no exterior work. no walls to be changed. | $38,000 |
| Aug 20, 2020 | Completed final sign-off Mar 2021 | 1445 Eucalyptus Dr | remodel two bath in kind. master bathroom,2nd floor & guest bath on 1st floor,no walls to be changed, no exteriro work, upgrade electrical as needed, new plumbing, fixtures, 2 shower pans.Details
remodel two bath in kind. master bathroom,2nd floor & guest bath on 1st floor,no walls to be changed, no exteriro work, upgrade electrical as needed, new plumbing, fixtures, 2 shower pans. | $26,000 |
| Aug 14, 2020 | Completed final sign-off Oct 2020 | 2572 Alemany Bl | one kitchen and one bathroom remodel in kind,new plumbing fixtures,new shower pan,new electrical as needed,new recessed led lights,new sub panel 70 amps,new cabinets,new appliances,Details
one kitchen and one bathroom remodel in kind,new plumbing fixtures,new shower pan,new electrical as needed,new recessed led lights,new sub panel 70 amps,new cabinets,new appliances, | $37,000 |
| May 6, 2020 | Completed final sign-off Jun 2020 | 1012 Shotwell St | unit #b: remodel kitchen and bathroom like for like, smae locations. no walls to be changed, no exterior changes.Details
unit #b: remodel kitchen and bathroom like for like, smae locations. no walls to be changed, no exterior changes. | $40,000 |
| Mar 11, 2020 | Completed final sign-off May 2020 | 143 Ord St | kitchen and bathroom remodel, in kind. same location, no walls to be changed. plumbing and electrical as needDetails
kitchen and bathroom remodel, in kind. same location, no walls to be changed. plumbing and electrical as need | $32,000 |
| Mar 5, 2020 | Never finaled issued Oct 2020, no final | 12 Roscoe St | remodel interior of e residence, covnert 676 sq ft of garage to habitable: 2 bdrms, 2 full bath, fam rm, laundry. add 199 sq ft dormers at roof, 3rd fl add 27 sq ft hab space: new mstr bdrm, bath, add 254 sq ft patio at rear. new stair frm gr fl to 2nd fl, 2nd fl to 3rd flDetails
remodel interior of e residence, covnert 676 sq ft of garage to habitable: 2 bdrms, 2 full bath, fam rm, laundry. add 199 sq ft dormers at roof, 3rd fl add 27 sq ft hab space: new mstr bdrm, bath, add 254 sq ft patio at rear. new stair frm gr fl to 2nd fl, 2nd fl to 3rd fl | $150,000 |
| Feb 20, 2020 | Completed final sign-off Feb 2022 | 346 01st St | unit 305: 4th fl - kitchen 48 sqft & 2 bathroom remodel 35 sqft & 24 sqft.Details
unit 305: 4th fl - kitchen 48 sqft & 2 bathroom remodel 35 sqft & 24 sqft. | $46,000 |
| Feb 14, 2020 | Completed final sign-off Nov 2021 | 259 Avila St | revision to pa# 2015-0513-6187 tp provide plans for demo of interior plaster or drywall, floors, cabinets floors tiles, bathroom wall tile to expose framing. also demo electrical & plumbing as needed, for the work shown on the original plansDetails
revision to pa# 2015-0513-6187 tp provide plans for demo of interior plaster or drywall, floors, cabinets floors tiles, bathroom wall tile to expose framing. also demo electrical & plumbing as needed, for the work shown on the original plans | $9,000 |
| Feb 13, 2020 | Expired or cancelled withdrawn Mar 2023 | 259 Avila St | revision to pa# 201505136187; of 3rd story addition and the other 2 (e) floors, remodeling per plan, including 2 (e) bathrooms, laundry and kitchen. replace (e) concrete slab w/ new 12" #5 rebar max excavation 6" less than 50 cubic yards. new skylight on 3rd flr. **n/a maher**Details
revision to pa# 201505136187; of 3rd story addition and the other 2 (e) floors, remodeling per plan, including 2 (e) bathrooms, laundry and kitchen. replace (e) concrete slab w/ new 12" #5 rebar max excavation 6" less than 50 cubic yards. new skylight on 3rd flr. **n/a maher** | $200,000 |
| Jan 31, 2020 | Completed final sign-off Mar 2020 | 2066 Wawona St | bathroom remodel. change from bathtub to standing shower. no walls to be changed. like for like. new plumbing fixtures. upgrade electrical as needed.Details
bathroom remodel. change from bathtub to standing shower. no walls to be changed. like for like. new plumbing fixtures. upgrade electrical as needed. | $12,000 |
| Jan 22, 2020 | Expired or cancelled expired Jan 2025 | 366 San Carlos St | remodel of unit #366 on the 3rd fl. replace kitchen cabinets in kind. interior remodel of two unit building per plans. demo (e) bedroom wall to create new open living room and relocate 2nd bedroom to front. add second bathroom at (e) dining nook. no exterior work.Details
remodel of unit #366 on the 3rd fl. replace kitchen cabinets in kind. interior remodel of two unit building per plans. demo (e) bedroom wall to create new open living room and relocate 2nd bedroom to front. add second bathroom at (e) dining nook. no exterior work. | $10,000 |
| Dec 16, 2019 | Completed final sign-off Jan 2020 | 30 Esquina Dr | remodeling 1 bath 2nd fl like for like. no walls to be changed. upgrade eletrical and plumbingDetails
remodeling 1 bath 2nd fl like for like. no walls to be changed. upgrade eletrical and plumbing | $13,000 |
| Sep 27, 2019 | Completed final sign-off Jul 2020 | 79 Central Av | rev. to pa 2019 0711 5655 & 2019 0731 7442: remodel (e) kitchen at new layout and relocate non-structural walls. add a new guest bathroom and remodel (e) master bathroom. add electrical asneeed & new plumbing as needed. remove alls as needed and replce 2 rear facing windows and 1 rear ext. doors.Details
rev. to pa 2019 0711 5655 & 2019 0731 7442: remodel (e) kitchen at new layout and relocate non-structural walls. add a new guest bathroom and remodel (e) master bathroom. add electrical asneeed & new plumbing as needed. remove alls as needed and replce 2 rear facing windows and 1 rear ext. doors. | $69,000 |
| Sep 4, 2019 | Completed final sign-off Oct 2019 | 258 Red Rock Wy | remodel 2 bathroom in kind and replace kitchen counter top and flooring. no framing modification- no structural work.Details
remodel 2 bathroom in kind and replace kitchen counter top and flooring. no framing modification- no structural work. | $32,000 |
| Jul 11, 2019 | Completed final sign-off Jul 2020 | 79 Central Av | kitchen and bathroom remodeling like for like. same location all new plumbing fixtrues, tiles, tub, cabinets etc. comply with cec 150.0(k)3Details
kitchen and bathroom remodeling like for like. same location all new plumbing fixtrues, tiles, tub, cabinets etc. comply with cec 150.0(k)3 | $37,000 |
| Jun 17, 2019 | Completed final sign-off Dec 2020 | 486 Duncan St | 2 bathroom (5x8) remodeling, like for like same location no structural changes and no exterior work. new led recessed lights and plumbing fixtures.Details
2 bathroom (5x8) remodeling, like for like same location no structural changes and no exterior work. new led recessed lights and plumbing fixtures. | $32,000 |
| May 13, 2019 | Completed final sign-off Jul 2019 | 1870 Jackson St | master bathroom remodeling. replace old bathtub for a standing shower all in same location. new plumbing fixture, new tile, new hot mop and accesories.Details
master bathroom remodeling. replace old bathtub for a standing shower all in same location. new plumbing fixture, new tile, new hot mop and accesories. | $18,000 |
| Apr 12, 2019 | Completed final sign-off Jul 2019 | 291 28th Av | bathroom remodel, like for like. no walls relocated or changed. new plumbing fixtures, tiles & cabinets.Details
bathroom remodel, like for like. no walls relocated or changed. new plumbing fixtures, tiles & cabinets. | $13,000 |
| Mar 18, 2019 | Expired or cancelled expired Jan 2023 | 275 Valdez Av | add new conditioned space @ ground floor w/2 bedrooms, bathroom, laundry and family room. remodel (e) kitchen and bathroom @ 2nd floor. replace/add windows. relocate interior stairs and do structural workDetails
add new conditioned space @ ground floor w/2 bedrooms, bathroom, laundry and family room. remodel (e) kitchen and bathroom @ 2nd floor. replace/add windows. relocate interior stairs and do structural work | $180,000 |
| Mar 15, 2019 | Completed final sign-off Sep 2019 | 3075 26th St | remodeling kitchen & bathroom. like forlike. no walls to be changed ormodifiected. install new plumbing fixtures, cabinets, new shower pan & applaicnes. installa recessed led lights in living room.Details
remodeling kitchen & bathroom. like forlike. no walls to be changed ormodifiected. install new plumbing fixtures, cabinets, new shower pan & applaicnes. installa recessed led lights in living room. | $30,000 |
| Feb 28, 2019 | Never finaled issued Feb 2019, no final | 2412 Harrison St | two bathrooms remodel, like for like. no walls or locations to be change. same place like existing. re tile, shower pan, vanity and plumbing fixturesDetails
two bathrooms remodel, like for like. no walls or locations to be change. same place like existing. re tile, shower pan, vanity and plumbing fixtures | $26,000 |
| Dec 20, 2018 | Completed final sign-off Nov 2019 | 2274 39th Av | interior remodel on 2nd fl- to remodel kitchen, bath, remove fireplace, add skylights, replace internal stair and frame in e roof opening. gr fl add master suite, great rm, laundry closet and entry foyerDetails
interior remodel on 2nd fl- to remodel kitchen, bath, remove fireplace, add skylights, replace internal stair and frame in e roof opening. gr fl add master suite, great rm, laundry closet and entry foyer | $150,000 |
| Dec 3, 2018 | Completed final sign-off Feb 2019 | 727 46th Av | remodel two bathrooms like for like. same location. no walls to be removed or modified. install new plumbing fixtures. remodel kitchen in-kind and install (1) shower pan.Details
remodel two bathrooms like for like. same location. no walls to be removed or modified. install new plumbing fixtures. remodel kitchen in-kind and install (1) shower pan. | $45,000 |
| Nov 26, 2018 | Expired or cancelled expired Jan 2023 | 275 Valdez Av | (2) bathroom & (1) kitchen remodel, all work upstairs, no wall removal, like-for-like, same locationsDetails
(2) bathroom & (1) kitchen remodel, all work upstairs, no wall removal, like-for-like, same locations | $50,000 |
| Nov 15, 2018 | Completed final sign-off Jan 2019 | 1455 Union St | remodel one bathroom and one kitchen in unit #1. remodel one bathroom and one kitchen in unit #2. like for like. no structural changes or walls removal. new appliances and cabinets. two units same scope of work and add a subpanel in each unit #1 and #2.Details
remodel one bathroom and one kitchen in unit #1. remodel one bathroom and one kitchen in unit #2. like for like. no structural changes or walls removal. new appliances and cabinets. two units same scope of work and add a subpanel in each unit #1 and #2. | $50,000 |
| Nov 6, 2018 | Completed final sign-off Feb 2019 | 2 Malta Dr | 3 bathrooms, 1 kitchen rmeodel including hvac & ductwork. no walls, door or windows to be moficied. same location. just new bathroom & kitchen accesorries and appliances.Details
3 bathrooms, 1 kitchen rmeodel including hvac & ductwork. no walls, door or windows to be moficied. same location. just new bathroom & kitchen accesorries and appliances. | $55,000 |
| Oct 25, 2018 | Completed final sign-off Jan 2019 | 3336 25th St | kitchen and bathroom remodel. maher n/aDetails
kitchen and bathroom remodel. maher n/a | $15,000 |
| Oct 5, 2018 | Completed final sign-off May 2019 | 2647 23rd Av | remove wall between kitchen, dining & living rm. remodel bathroom, kitchen, replace old plaster surfaces. build out downstairs basement storage area and conver to bedrooms & bath. relocate and update mechanical & electrical. add rear deck.Details
remove wall between kitchen, dining & living rm. remodel bathroom, kitchen, replace old plaster surfaces. build out downstairs basement storage area and conver to bedrooms & bath. relocate and update mechanical & electrical. add rear deck. | $150,000 |
| Aug 27, 2018 | Completed final sign-off Mar 2019 | 1333 Jones St | unit 1501 - remodel 2 bathrooms & kitchen. like for like, no wall or change locations. replace all fixture like toilets, vanities, tile appliances, cabinets, counter & new led recessed lightsDetails
unit 1501 - remodel 2 bathrooms & kitchen. like for like, no wall or change locations. replace all fixture like toilets, vanities, tile appliances, cabinets, counter & new led recessed lights | $38,000 |
| Aug 10, 2018 | Completed final sign-off Feb 2019 | 33 Scotia Av | kitchen and bathroom remodel. like for like. new bathroom fixtures, faucet, toilet, vanity, tiles. new kitchen recessed lights, cabinets, appliances. all in the same location . no exterior changes or walls removed.Details
kitchen and bathroom remodel. like for like. new bathroom fixtures, faucet, toilet, vanity, tiles. new kitchen recessed lights, cabinets, appliances. all in the same location . no exterior changes or walls removed. | $30,000 |
| Jul 26, 2018 | Completed final sign-off Oct 2018 | 439 Oxford St | remodel (1) bathroom 1/f, new tub, toilet, vanity, tile, lights, gfci outlets; no walls/windows/door/other changes w/this permit; insulation & sheetrock, garage, hallway, north wall.Details
remodel (1) bathroom 1/f, new tub, toilet, vanity, tile, lights, gfci outlets; no walls/windows/door/other changes w/this permit; insulation & sheetrock, garage, hallway, north wall. | $10,000 |
| Jul 12, 2018 | Completed final sign-off Aug 2018 | 60 Robblee Av | bathroom remodel no changes on walls or exterior new tile, hot mop, fixtures, new paint, sheetrock no structural workDetails
bathroom remodel no changes on walls or exterior new tile, hot mop, fixtures, new paint, sheetrock no structural work | $10,000 |
| Jul 11, 2018 | Completed final sign-off Oct 2018 | 999 Wisconsin St | kitchen and 2 bathroom remodel. no walls moved no structuralDetails
kitchen and 2 bathroom remodel. no walls moved no structural | $25,000 |
| May 30, 2018 | Completed final sign-off May 2018 | 3756 Jackson St | administrative revision to 201710100750 to correct scope of work inappropriately written, scoop should have read - revision to 20161111628708, 201703030612 delete lightwell. remodel (e) home/office w/1 new bathm frenchdoors to rear * window replacement. add 1 new bath @2nd fl add 1 newlaundry closetDetails
administrative revision to 201710100750 to correct scope of work inappropriately written, scoop should have read - revision to 20161111628708, 201703030612 delete lightwell. remodel (e) home/office w/1 new bathm frenchdoors to rear * window replacement. add 1 new bath @2nd fl add 1 newlaundry closet | |
| Feb 14, 2018 | Completed final sign-off May 2018 | 8200 Oceanview Tr | demo and remodel one bathroom and kithcen. no walls or change of location. replace cabinets, fixtures, countertops, floors, 6" recessed lights and new paint. maher n/aDetails
demo and remodel one bathroom and kithcen. no walls or change of location. replace cabinets, fixtures, countertops, floors, 6" recessed lights and new paint. maher n/a | $35,000 |
| Jan 4, 2018 | Completed final sign-off May 2018 | 1449 Innes Av | kitchen & bath remodel, all lights shall be high efficacy, minimum (1) vacancy sensor in bathroom, like-for-like.Details
kitchen & bath remodel, all lights shall be high efficacy, minimum (1) vacancy sensor in bathroom, like-for-like. | $15,000 |
| Jan 4, 2018 | Completed final sign-off Jul 2019 | 266 Country Club Dr | (2) bathroom remodels, like-for-like, revision to pa#201711274836; all lights shall be high efficacy, minimum (1) vacancy sensor in bathroomDetails
(2) bathroom remodels, like-for-like, revision to pa#201711274836; all lights shall be high efficacy, minimum (1) vacancy sensor in bathroom | $8,000 |
| Nov 22, 2017 | Never finaled issued Nov 2017, no final | 3055 22nd Av | remodel kitchen, turn 1/2 bath upstairs into full bath with removal of closet.Details
remodel kitchen, turn 1/2 bath upstairs into full bath with removal of closet. | $35,000 |
| Nov 2, 2017 | Completed final sign-off Mar 2018 | 1731 43rd Av | bathroom expansion on (e) ground floor bath. maher n/a.Details
bathroom expansion on (e) ground floor bath. maher n/a. | $8,000 |
| Oct 27, 2017 | Completed final sign-off Jan 2018 | 2875 21st St | unit #5: bathroom remodel, same location. new fixture, new tile, new exhaust fan, new vanity. no change on walls.Details
unit #5: bathroom remodel, same location. new fixture, new tile, new exhaust fan, new vanity. no change on walls. | $10,000 |
| Oct 10, 2017 | Completed final sign-off May 2018 | 3756 Jackson St | revision to pa 2016-1116-2870 & 2017-0303-0621 - delete lightwell infill & lowering of bsmt; delete moment frame; delete uprgrade of elevator, delete bi-fold doors to rear yard. remodel 0f (e) home/office w/1 (n) bath, french doors to rear & window replacement. add 1 (n) bath @ 2nd fl. add 1 (n)Details
revision to pa 2016-1116-2870 & 2017-0303-0621 - delete lightwell infill & lowering of bsmt; delete moment frame; delete uprgrade of elevator, delete bi-fold doors to rear yard. remodel 0f (e) home/office w/1 (n) bath, french doors to rear & window replacement. add 1 (n) bath @ 2nd fl. add 1 (n) | |
| Aug 30, 2017 | Expired or cancelled cancelled Apr 2018 | 3756 Jackson St | 1/f: remodel bathroom. no change in walls and layouts and openings.Details
1/f: remodel bathroom. no change in walls and layouts and openings. | $12,000 |
| Jul 25, 2017 | Completed final sign-off Oct 2017 | 1731 43rd Av | kitchen remodel, bathroom remodel , rewire 2nd flr, w/100 amp subpanel.non structural no plumbing fixtures.cabinets & tile, all in same location no walls removal or no exterior changesDetails
kitchen remodel, bathroom remodel , rewire 2nd flr, w/100 amp subpanel.non structural no plumbing fixtures.cabinets & tile, all in same location no walls removal or no exterior changes | $32,000 |
| Jun 15, 2017 | Completed final sign-off Dec 2018 | 2312 Castro St | revision to pa #201512285973/s1 - revise structural work: change joist (size & space @ rear deck); add tie to strong frame @ master bath roof.Details
revision to pa #201512285973/s1 - revise structural work: change joist (size & space @ rear deck); add tie to strong frame @ master bath roof. | |
| Mar 30, 2017 | Completed final sign-off Aug 2017 | 350 Sanchez St | convert (e) third floor study into new bathroomDetails
convert (e) third floor study into new bathroom | $17,350 |
| Mar 30, 2017 | Completed final sign-off Oct 2017 | 354 Sanchez St | convert (e) closet into new split bathroom @ existing 1st flrDetails
convert (e) closet into new split bathroom @ existing 1st flr | $18,500 |
| Mar 30, 2017 | Completed final sign-off Oct 2017 | 352 Sanchez St | add new bathroom at renovated closet area at (e) 2nd flrDetails
add new bathroom at renovated closet area at (e) 2nd flr | $16,050 |
| Feb 2, 2017 | Completed final sign-off Mar 2017 | 772 08th Av | unit # 3: (2) bathroom remodeling, new tile, new exhaust fan, replace bath tub for standing shower, new toilet.Details
unit # 3: (2) bathroom remodeling, new tile, new exhaust fan, replace bath tub for standing shower, new toilet. | $25,000 |
| Feb 2, 2017 | Completed final sign-off Mar 2017 | 153 Jordan Av | guest bathroom remodeling, new shower wall tile, new vanity, new exhaust fan, new shower pan, (1) 6" recessed light. n/a maherDetails
guest bathroom remodeling, new shower wall tile, new vanity, new exhaust fan, new shower pan, (1) 6" recessed light. n/a maher | $12,000 |
| Jan 31, 2017 | Completed final sign-off Jun 2017 | 1049 Noe St | kitchen & bathroom remodel.Details
kitchen & bathroom remodel. | $30,000 |
| Jan 17, 2017 | Completed final sign-off Mar 2017 | 2570 27th Av | kitchen and bathroom remodeling, rewire the rest of the house and re-pipe water lines to copper and replace electrical panel to a braker one. all upogrades at same location.Details
kitchen and bathroom remodeling, rewire the rest of the house and re-pipe water lines to copper and replace electrical panel to a braker one. all upogrades at same location. | $28,000 |
| Nov 15, 2016 | Completed final sign-off Oct 2018 | 1820 Kirkham St | legalize (e) 1st floor including 2 bathrooms, 1 bedroom, 1 office , 1 family room, laundry. remodel upstairs 2nd floor - convert (e) closet into bathroom.Details
legalize (e) 1st floor including 2 bathrooms, 1 bedroom, 1 office , 1 family room, laundry. remodel upstairs 2nd floor - convert (e) closet into bathroom. | $35,000 |
| Sep 9, 2016 | Never finaled issued Sep 2016, no final | 29 Maynard St | revision to ref pa 201607051612: add w/d and laundry connection box on bathroom . add receptaclesDetails
revision to ref pa 201607051612: add w/d and laundry connection box on bathroom . add receptacles | $2,000 |
| Sep 9, 2016 | Completed final sign-off Mar 2017 | 153 Jordan Av | remodel 2 (e) bathrooms and kitchenDetails
remodel 2 (e) bathrooms and kitchen | $20,000 |
| Sep 9, 2016 | Never finaled issued Sep 2016, no final | 3022 Pine St | remodel (e) bathroom. replace (n) plumbing fixturs, casework and electrical.Details
remodel (e) bathroom. replace (n) plumbing fixturs, casework and electrical. | $8,000 |
| Aug 16, 2016 | Completed final sign-off Dec 2017 | 170 Bridgeview Dr | convert (e) unfinished space to living space. add family rm, entertainment rm, 3 bedrooms, 3 full baths. perform voluntary seismic strengthening. upgrade elec panel add furnance & water heater. rebuild (e) dryrot balconies & staircase at rear in kind;Details
convert (e) unfinished space to living space. add family rm, entertainment rm, 3 bedrooms, 3 full baths. perform voluntary seismic strengthening. upgrade elec panel add furnance & water heater. rebuild (e) dryrot balconies & staircase at rear in kind; | $150,000 |
| Apr 15, 2016 | Expired or cancelled expired Sep 2017 | 574 18th Av | new jack and jill bathroom addition in extg 2nd floor area & remodel (1) bathDetails
new jack and jill bathroom addition in extg 2nd floor area & remodel (1) bath | $1,500 |
| Mar 25, 2016 | Completed final sign-off Aug 2016 | 37 Norwich St | remodel kitchen & bath, fix plumbing and rewire. relocate gas line to new gas meter. all new lights are led's, provide exhaust to kitchen & bathroom.Details
remodel kitchen & bath, fix plumbing and rewire. relocate gas line to new gas meter. all new lights are led's, provide exhaust to kitchen & bathroom. | $35,000 |
| Mar 17, 2016 | Expired or cancelled withdrawn Aug 2016 | 170 Bridgeview Dr | (n)1737 sf. add 1 bdrm,3baths 1)convert(e)basemt at st level.664 sf (1 fam rm & 1 bath) 2) convert(e) 2nd lower basemtn582 sf into living space, 1(n)bedrm, 1(n) bathrm 3) convert(e)3rd level basemt into living space, 491 sf. (1 fam rm, 1 bath) 4) remove wall at 2nd floor.Details
(n)1737 sf. add 1 bdrm,3baths 1)convert(e)basemt at st level.664 sf (1 fam rm & 1 bath) 2) convert(e) 2nd lower basemtn582 sf into living space, 1(n)bedrm, 1(n) bathrm 3) convert(e)3rd level basemt into living space, 491 sf. (1 fam rm, 1 bath) 4) remove wall at 2nd floor. | $12,000 |
| Feb 29, 2016 | Completed final sign-off Aug 2016 | 170 Bridgeview Dr | replace fixtures at two bathrooms and kitchen. fixtures will remiain at same location. no structural changes at this remodeling. new carpet and doors at bedrooms and closets.Details
replace fixtures at two bathrooms and kitchen. fixtures will remiain at same location. no structural changes at this remodeling. new carpet and doors at bedrooms and closets. | $25,000 |
| Nov 25, 2015 | Completed final sign-off Dec 2018 | 2312 Castro St | fix side fire damage from neighbor. strengthen walls for future building of 3rd level, ground floor - add powder room, relocate (e) interior staircase; 1st floor - relocate kitchen, remove (e) bathroom, re-arrange layout of living space, replace (e) backDetails
fix side fire damage from neighbor. strengthen walls for future building of 3rd level, ground floor - add powder room, relocate (e) interior staircase; 1st floor - relocate kitchen, remove (e) bathroom, re-arrange layout of living space, replace (e) back | $200,000 |
| Aug 6, 2015 | Completed final sign-off Sep 2017 | 172 Carl St | 1st floor, new habitable space with stair to lower unit at 2nd floor & 3rd floor remodel. kitchens and 2 bathrooms each floor, new stair to new roof deck. new elevator all floorsDetails
1st floor, new habitable space with stair to lower unit at 2nd floor & 3rd floor remodel. kitchens and 2 bathrooms each floor, new stair to new roof deck. new elevator all floors | $250,000 |