Sunset Builders Llc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to Oct 2026
- Last 24 months
- 10 permits filed
60 permits since 2000: 48 completed, 7 in progress, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
2 roof deck permits: 2 completed. Typically 782 days from filing to permit and 2278 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 22, 2016 | Completed final sign-off Mar 2023 | 1595 Dolores St | altered site to #2013-0724-2652(s). convert lower level office space to residential unit. remodel 2 (e) units. roof deck. sprinkler under separate permit. new curb cut @ relocationg garage. remove old curb cut.Details
altered site to #2013-0724-2652(s). convert lower level office space to residential unit. remodel 2 (e) units. roof deck. sprinkler under separate permit. new curb cut @ relocationg garage. remove old curb cut. | $5,000 |
| Jul 24, 2013 | Completed final sign-off Mar 2023 | 1595 Dolores St | remodel 2 units, 2 kitchens, 4 baths, merge 2 offices to one, separate 2 garages internally, reconfigure windows, replace siding w/v-groove redwood, new addition over garage @ 2nd & 3rd levels, new balcony o/garage-new roof deck, new skylts, replace furnaces & water heaters, rebuild entry stairDetails
remodel 2 units, 2 kitchens, 4 baths, merge 2 offices to one, separate 2 garages internally, reconfigure windows, replace siding w/v-groove redwood, new addition over garage @ 2nd & 3rd levels, new balcony o/garage-new roof deck, new skylts, replace furnaces & water heaters, rebuild entry stair | $250,000 |