Back to kitchen remodel contractors
Sunset Builders Llc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to Oct 2026
- Last 24 months
- 10 permits filed
60 permits since 2000: 48 completed, 7 in progress, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 11 completed, 1 in progress. Typically 99 days from filing to permit and 250 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 14, 2025 | In progress issued Oct 2025 | 350 Lawton St | interior remodel: 1st flr restore original garage,relocate stair to 2nd flr. 2nd flr: remodel kitchen (n) wall opening to kitchen replace windows in-kind with vinyl. 3rd flr:remodel primary bathroom, and (e) bath, add (a) bath, replace windows with vinyl.Details
interior remodel: 1st flr restore original garage,relocate stair to 2nd flr. 2nd flr: remodel kitchen (n) wall opening to kitchen replace windows in-kind with vinyl. 3rd flr:remodel primary bathroom, and (e) bath, add (a) bath, replace windows with vinyl. | $300,000 |
| Feb 12, 2025 | Completed final sign-off Dec 2025 | 3545 Judah St | work only in unit 3545 judah at 2nd fl. new window at rear building wall, remove wall between kitchen and dining room, kitchen remodelDetails
work only in unit 3545 judah at 2nd fl. new window at rear building wall, remove wall between kitchen and dining room, kitchen remodel | $20,000 |
| May 15, 2024 | Completed final sign-off Nov 2024 | 635 Bay St | kitchen remodel-appliances to stay. plumbing to remain. bathroom remodel. change tub to shower in current location.Details
kitchen remodel-appliances to stay. plumbing to remain. bathroom remodel. change tub to shower in current location. | $25,000 |
| Dec 21, 2023 | Completed final sign-off Sep 2025 | 243 12th Av | remodel kitchen & 3.5 baths, new windows & doors, move laundry to 3/f, modify (e) closets, replace heaters on 3/f w/new mini split hvac, new r.30 insulation at roof, upgrade electrical panel to 200 amps.Details
remodel kitchen & 3.5 baths, new windows & doors, move laundry to 3/f, modify (e) closets, replace heaters on 3/f w/new mini split hvac, new r.30 insulation at roof, upgrade electrical panel to 200 amps. | $250,000 |
| Sep 19, 2023 | Completed final sign-off Apr 2024 | 2583 28th Av | interior remodel: 1st flr- add a bedroom, a family room, a media room, and a bathroom; 2nd flr- remodel existing kitchen, bathroom, add a powder room.Details
interior remodel: 1st flr- add a bedroom, a family room, a media room, and a bathroom; 2nd flr- remodel existing kitchen, bathroom, add a powder room. | $120,000 |
| Jul 5, 2023 | Completed final sign-off Jul 2023 | 838 Anza St | replace existing kitchen cabinets, relocate electrical subpanel and new kitchen sink in existing location. (unit#302) general kitchen remodel.Details
replace existing kitchen cabinets, relocate electrical subpanel and new kitchen sink in existing location. (unit#302) general kitchen remodel. | $10,000 |
| Jun 8, 2023 | Completed final sign-off Dec 2023 | 1566 43rd Av | kitchen and 1 bathroom (1 shower) remodel in kind. one kitchen window replace in kind (not facing street).Details
kitchen and 1 bathroom (1 shower) remodel in kind. one kitchen window replace in kind (not facing street). | $14,500 |
| Mar 25, 2021 | Completed final sign-off Mar 2026 | 118 Robinhood Dr | remodel kitchen. add 1436 sq.ft. 2nd floor to single story house including 3 bedrooms, 2 baths & 1 laundry room. add stairs between floor 1 & 2.Details
remodel kitchen. add 1436 sq.ft. 2nd floor to single story house including 3 bedrooms, 2 baths & 1 laundry room. add stairs between floor 1 & 2. | $275,000 |
| Feb 3, 2021 | Completed final sign-off Nov 2023 | 20 Eastwood Dr | remodel kitchen & bathroom, add new bath at upper/main level. add new stairs to (e) lower level. new office & bedroom at lower level with new space at family room infill under (e) bay. 42 sq ft added w/ 470 sq ft increase to conditioned space.Details
remodel kitchen & bathroom, add new bath at upper/main level. add new stairs to (e) lower level. new office & bedroom at lower level with new space at family room infill under (e) bay. 42 sq ft added w/ 470 sq ft increase to conditioned space. | $450,000 |
| Oct 10, 2020 | Completed final sign-off Aug 2021 | 2428 14th Av | interior remodel of 2nd level: remodel existing kitchen and bathroom, addition of new bathroom, laundry room & reconstruction of existing stairway in-kind. remove bay window, alight wall, new windows, stucco patch & paint.Details
interior remodel of 2nd level: remodel existing kitchen and bathroom, addition of new bathroom, laundry room & reconstruction of existing stairway in-kind. remove bay window, alight wall, new windows, stucco patch & paint. | $95,000 |
| Dec 11, 2017 | Completed final sign-off May 2021 | 920 Wawona St | (n) horizontal addition @ rearyard. basement: convert garage/storage space into habitable space: (1) bedrm, livingrm, (1) bath, laundry. 1st fl: kitchen & bath remodel. add (1) bed & (1) bath @ 1st fl. replace front entry stairs.Details
(n) horizontal addition @ rearyard. basement: convert garage/storage space into habitable space: (1) bedrm, livingrm, (1) bath, laundry. 1st fl: kitchen & bath remodel. add (1) bed & (1) bath @ 1st fl. replace front entry stairs. | $150,000 |
| Jul 24, 2013 | Completed final sign-off Mar 2023 | 1595 Dolores St | remodel 2 units, 2 kitchens, 4 baths, merge 2 offices to one, separate 2 garages internally, reconfigure windows, replace siding w/v-groove redwood, new addition over garage @ 2nd & 3rd levels, new balcony o/garage-new roof deck, new skylts, replace furnaces & water heaters, rebuild entry stairDetails
remodel 2 units, 2 kitchens, 4 baths, merge 2 offices to one, separate 2 garages internally, reconfigure windows, replace siding w/v-groove redwood, new addition over garage @ 2nd & 3rd levels, new balcony o/garage-new roof deck, new skylts, replace furnaces & water heaters, rebuild entry stair | $250,000 |