Sun Sun Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jun 2021
- Last 24 months
- 0 permits filed
59 permits since 2000: 55 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 75 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 11, 2016 | Completed final sign-off Oct 2017 | 370 Valdez Av | remodel of kitchen, new master bath, new stair and bath 1 remodel. seal one exterior side door. new electrical on 2nd floor. replace extg windows with in kind at front and side facades. no change to floor area , front facade or grade.Details
remodel of kitchen, new master bath, new stair and bath 1 remodel. seal one exterior side door. new electrical on 2nd floor. replace extg windows with in kind at front and side facades. no change to floor area , front facade or grade. | $80,000 |
| Jan 15, 2010 | Completed final sign-off Mar 2010 | 1895 Jackson St | #203 - to comply w/ nov #200928406 to replace (e) fire escape window to a door fire escape, add fire escape stair to new escape door.Details
#203 - to comply w/ nov #200928406 to replace (e) fire escape window to a door fire escape, add fire escape stair to new escape door. | $2,500 |
| May 18, 2006 | Completed final sign-off Jun 2006 | 2000 Grove St | repair rear stair less than 50%. if greater than 50% bldg inspector may require city planning approval and plans. repair in kindDetails
repair rear stair less than 50%. if greater than 50% bldg inspector may require city planning approval and plans. repair in kind | $3,500 |
| Jan 13, 2006 | Never finaled issued Jan 2006, no final | 523 Madrid St | repair stairs. -stairs need to be repaired because 6ut of 14 steps are damage. very much. less than 50% of stairs.Details
repair stairs. -stairs need to be repaired because 6ut of 14 steps are damage. very much. less than 50% of stairs. | $1,500 |
| Feb 20, 2003 | Completed final sign-off May 2003 | 1763 Greenwich St | repair the stairs in back of the bldg./house.repair lightwell.to comply w/ nov#200336825(see attachDetails
repair the stairs in back of the bldg./house.repair lightwell.to comply w/ nov#200336825(see attach | $4,000 |
| Aug 23, 2000 | Completed final sign-off Jul 2001 | 1583 Mckinnon Av | comply with n o v 200007357, repair stair guardrails and handrails not a replacement of stairsDetails
comply with n o v 200007357, repair stair guardrails and handrails not a replacement of stairs | $9,000 |