Back to kitchen remodel contractors
Sun Sun Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jun 2021
- Last 24 months
- 0 permits filed
59 permits since 2000: 55 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
29 kitchen remodel permits: 28 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 90 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 15, 2021 | Completed final sign-off Jun 2022 | 1895 Jackson St | unit 406 - remodel 1 kitchen and 1 bathroom. non structuralDetails
unit 406 - remodel 1 kitchen and 1 bathroom. non structural | $38,000 |
| Jul 21, 2020 | Completed final sign-off May 2022 | 636 33rd Av | to comply w/ complaint #202044601. inkind kitchen remodel & bathroom remodel (no change to floor plan or walls).Details
to comply w/ complaint #202044601. inkind kitchen remodel & bathroom remodel (no change to floor plan or walls). | $32,000 |
| Dec 7, 2017 | Completed final sign-off Feb 2018 | 636 33rd Av | unit #5 only - remodel kitchen & bathroom. no structural work, no wall modification finishes & fixtures only.Details
unit #5 only - remodel kitchen & bathroom. no structural work, no wall modification finishes & fixtures only. | $21,000 |
| Jul 25, 2016 | Completed final sign-off Sep 2016 | 1945 Broadway | work in unit 101: remodel kitchen - replacing (e) cabinet and countertop.Details
work in unit 101: remodel kitchen - replacing (e) cabinet and countertop. | $14,000 |
| Feb 16, 2016 | Completed final sign-off Apr 2016 | 636 33rd Av | #6- remodel kitchen & bathroom in kind.Details
#6- remodel kitchen & bathroom in kind. | $28,000 |
| Jan 26, 2016 | Completed final sign-off Jul 2016 | 265 Thrift St | bathroom and kitchen remodel. in-kind.Details
bathroom and kitchen remodel. in-kind. | $22,000 |
| Jan 11, 2016 | Completed final sign-off Oct 2017 | 370 Valdez Av | remodel of kitchen, new master bath, new stair and bath 1 remodel. seal one exterior side door. new electrical on 2nd floor. replace extg windows with in kind at front and side facades. no change to floor area , front facade or grade.Details
remodel of kitchen, new master bath, new stair and bath 1 remodel. seal one exterior side door. new electrical on 2nd floor. replace extg windows with in kind at front and side facades. no change to floor area , front facade or grade. | $80,000 |
| Oct 15, 2015 | Completed final sign-off Dec 2015 | 636 33rd Av | unit 7: remodel kitchen & bathroom. no structural work. no wall modificatoin - finishes & fixtures only.Details
unit 7: remodel kitchen & bathroom. no structural work. no wall modificatoin - finishes & fixtures only. | $18,000 |
| Jun 25, 2015 | Completed final sign-off Aug 2015 | 2300 Pacific Av | work in #206:remodel kitchen, replace (e) cabinets and countertop with new. remodel bathroom. replace (e) vanity and fixture with new.Details
work in #206:remodel kitchen, replace (e) cabinets and countertop with new. remodel bathroom. replace (e) vanity and fixture with new. | $14,000 |
| Apr 21, 2015 | Completed final sign-off Jun 2015 | 2635 Fillmore St | unit #102: remodel kitchen , install new cabinets and counter. n/a maher ord. #155-13Details
unit #102: remodel kitchen , install new cabinets and counter. n/a maher ord. #155-13 | $12,000 |
| Jan 23, 2015 | Completed final sign-off Apr 2015 | 1895 Jackson St | work in unit #604: remodel kitchen to install new cabinets and granite countertop, no new wall and no existing wall relocation. repair existing sheetrock with 5/8" type x gyp board where damaged by the construction work. lighting in kitchen remodel shall comply with cec 150.0 (k)3.Details
work in unit #604: remodel kitchen to install new cabinets and granite countertop, no new wall and no existing wall relocation. repair existing sheetrock with 5/8" type x gyp board where damaged by the construction work. lighting in kitchen remodel shall comply with cec 150.0 (k)3. | $14,000 |
| Jun 12, 2014 | Completed final sign-off Sep 2014 | 2275 19th Av | unit 6: kitchen & bath remodel, upgrade electric to code, replace in-kind.Details
unit 6: kitchen & bath remodel, upgrade electric to code, replace in-kind. | $24,000 |
| May 13, 2014 | Completed final sign-off Jul 2014 | 2138 27th Av | remodel kitchen, no change to walls.Details
remodel kitchen, no change to walls. | $16,000 |
| Mar 26, 2014 | Completed final sign-off Dec 2014 | 345 Allison St | remove non-code compliant window per complaint #201456641 at basement. remove non-code compliant door at basement. change extg kitchen counter to bar sink.Details
remove non-code compliant window per complaint #201456641 at basement. remove non-code compliant door at basement. change extg kitchen counter to bar sink. | $1,000 |
| Jan 3, 2014 | Completed final sign-off Mar 2014 | 2300 Pacific Av | #307- remodel kitchen & bathroom, replace in kind.Details
#307- remodel kitchen & bathroom, replace in kind. | $15,000 |
| Dec 10, 2013 | Completed final sign-off Mar 2014 | 1895 Jackson St | unit #702: remodel kitchen, layout to remain same all walls to remainDetails
unit #702: remodel kitchen, layout to remain same all walls to remain | $15,000 |
| Sep 11, 2013 | Completed final sign-off Dec 2013 | 471 23rd Av | #6- remodel kitchen & bathroom: led lighting, kitchen hood & bathroom exhaust on top floor. exhaust 3' from property line & opening into building.Details
#6- remodel kitchen & bathroom: led lighting, kitchen hood & bathroom exhaust on top floor. exhaust 3' from property line & opening into building. | $18,600 |
| Jun 11, 2013 | Completed final sign-off Jul 2013 | 2300 Pacific Av | #308- remodel kitchen & bathroom, no lighting change.Details
#308- remodel kitchen & bathroom, no lighting change. | $10,000 |
| Feb 5, 2013 | Completed final sign-off Apr 2013 | 1945 Broadway | remodel kitchen and bathroom in unit #204; no change in wall layout and openings, permanent kitchen lighting shall have min 50% wattage being high efficacy, bathroom lighting shall be high efficacy or controlled by manual sensorsDetails
remodel kitchen and bathroom in unit #204; no change in wall layout and openings, permanent kitchen lighting shall have min 50% wattage being high efficacy, bathroom lighting shall be high efficacy or controlled by manual sensors | $15,000 |
| Sep 19, 2012 | Completed final sign-off Nov 2012 | 390 Wilde Av | remodel kitchen ,min 50% total rate wattage of permanently installed lights in kitchen to be high efficiency cec 150(k) 8,remodel 2 baths -high effeciency permanently install light in bathoom unless controlled manual on occupancy sensors cec 150 (k) 10, repair window dry rotDetails
remodel kitchen ,min 50% total rate wattage of permanently installed lights in kitchen to be high efficiency cec 150(k) 8,remodel 2 baths -high effeciency permanently install light in bathoom unless controlled manual on occupancy sensors cec 150 (k) 10, repair window dry rot | $9,500 |
| Jun 8, 2012 | Completed final sign-off Jul 2013 | 1895 Jackson St | remodel kitchen in unit #305, lighting will comply with cec 150(k)Details
remodel kitchen in unit #305, lighting will comply with cec 150(k) | $15,000 |
| Feb 14, 2012 | Completed final sign-off Mar 2012 | 266 Red Rock Wy | remodel kitchen and 3 bathrooms, min. 50% of kitchen lighting watts to be high efficacy, provide high efficacy lights or "manual" on occupancy sensor in bathrooms.Details
remodel kitchen and 3 bathrooms, min. 50% of kitchen lighting watts to be high efficacy, provide high efficacy lights or "manual" on occupancy sensor in bathrooms. | $30,000 |
| Oct 19, 2009 | Completed final sign-off Jan 2010 | 275 Crestlake Dr | remodel kitchen. replace existing cabinets with new cabinets. nnew lighting. no structural workDetails
remodel kitchen. replace existing cabinets with new cabinets. nnew lighting. no structural work | $6,000 |
| Feb 13, 2009 | Completed final sign-off May 2009 | 2001 California St | #107- remodel one kitchen. replace old cabinets with new ones, add new electrical outlets. non structural work.Details
#107- remodel one kitchen. replace old cabinets with new ones, add new electrical outlets. non structural work. | $8,000 |
| Jul 10, 2007 | Completed final sign-off Sep 2008 | 2414 Taraval St | relocate (e) kitchen and convert (e) kitchen to new study room use. relocate one full bath room and enlarge (e) bath room, add one (n) laundry room. replace existing interior sheetrock.Details
relocate (e) kitchen and convert (e) kitchen to new study room use. relocate one full bath room and enlarge (e) bath room, add one (n) laundry room. replace existing interior sheetrock. | $50,000 |
| Sep 19, 2006 | Completed final sign-off Mar 2008 | 1225 29th Av | internal remodel: g/f create 1/2 bath and storage room. 1/f: remodel (e) kitchen in kind. 2/f: remodel bedroom 2 and adjacent remodel 1 bathroom. no structural work.Details
internal remodel: g/f create 1/2 bath and storage room. 1/f: remodel (e) kitchen in kind. 2/f: remodel bedroom 2 and adjacent remodel 1 bathroom. no structural work. | $30,000 |
| Jul 29, 2005 | Completed final sign-off Jan 2006 | 1933 Fulton St | repair to building damaged by smoke. non structural repair. repair kitchen cabinet, broken (20)Details
repair to building damaged by smoke. non structural repair. repair kitchen cabinet, broken (20) | $45,000 |
| Dec 6, 2004 | Expired or cancelled expired Oct 2007 | 194 Raymond Av | remodel kitchen, 1 bathroom, cabinets,countertop flooring, change old fixtures.Details
remodel kitchen, 1 bathroom, cabinets,countertop flooring, change old fixtures. | $12,000 |
| Jun 10, 2004 | Completed final sign-off Dec 2004 | 40 Pueblo St | install new gypsum boards in apt, remodel kitchen & bathroom, move furnace frm garage to apt, replacDetails
install new gypsum boards in apt, remodel kitchen & bathroom, move furnace frm garage to apt, replac | $25,000 |