Back to kitchen remodel contractors
Sturdy Home Builders
- Based in
- San Francisco
- On San Francisco permits
- Apr 2001 to May 2024
- Last 24 months
- 0 permits filed
35 permits since 2000: 28 completed, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 11 completed, 1 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 97 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 13, 2024 | Completed final sign-off May 2025 | 1619 35th Av | gr fl appx 696 sf for family room, bedroom, patio door.e bath remodel, new front door,relocate laundry, water heater.2nd fl remove wall between dining rm, kitchen, remove wall between lvg rm/kitchen.remodel kitchen/bath.new pwdr room, demo fireplace.new windows. close skylt, enlrg skylt,new skylt.Details
gr fl appx 696 sf for family room, bedroom, patio door.e bath remodel, new front door,relocate laundry, water heater.2nd fl remove wall between dining rm, kitchen, remove wall between lvg rm/kitchen.remodel kitchen/bath.new pwdr room, demo fireplace.new windows. close skylt, enlrg skylt,new skylt. | $20,000 |
| Aug 23, 2017 | Completed final sign-off Nov 2017 | 2671 44th Av | remodel kitchen on 2nd floor. add media room, 2 bedrooms, exercise room and a full bath on 1st floorDetails
remodel kitchen on 2nd floor. add media room, 2 bedrooms, exercise room and a full bath on 1st floor | $50,000 |
| Jan 7, 2016 | Completed final sign-off Mar 2016 | 305 Guttenberg St | remodel existing bathrooms (2); remodel existing kitchen (1), replace in-kind.Details
remodel existing bathrooms (2); remodel existing kitchen (1), replace in-kind. | $18,000 |
| Oct 5, 2015 | Completed final sign-off Feb 2016 | 2311 32nd Av | remodel kitchen, add a new full bath and add new recessed lights window at 1st floor at storage room.Details
remodel kitchen, add a new full bath and add new recessed lights window at 1st floor at storage room. | $15,000 |
| Nov 14, 2013 | Expired or cancelled expired Jul 2015 | 2790 38th Av | remodel 2nd floor kitchen and bahtroom. add family room and bathroom on 1st floor. relocate washer and dyrer. new furnace and water heater.Details
remodel 2nd floor kitchen and bahtroom. add family room and bathroom on 1st floor. relocate washer and dyrer. new furnace and water heater. | $45,000 |
| Jul 21, 2011 | Completed final sign-off Sep 2011 | 1376 16th Av | remodeling of (1) kitchen and (2) bathrooms. add 5 recessed light fixtures in kitchen. no wall removal, no structural work. 50% high efficacy (wattage) cec 150(k)Details
remodeling of (1) kitchen and (2) bathrooms. add 5 recessed light fixtures in kitchen. no wall removal, no structural work. 50% high efficacy (wattage) cec 150(k) | $11,000 |
| Mar 30, 2011 | Completed final sign-off Jun 2011 | 2115 39th Av | 2nd floor- kitchen work: replace old countertop and tile works. need electrical and plumbing. a minimum of 50% of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy. permanently installed lights in bathroom shall be high efficacy unlessDetails
2nd floor- kitchen work: replace old countertop and tile works. need electrical and plumbing. a minimum of 50% of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy. permanently installed lights in bathroom shall be high efficacy unless | $7,500 |
| Aug 4, 2010 | Completed final sign-off Oct 2010 | 1626 47th Av | kitchen remodel-replace countertop, cabinets, sink, flooring & lights. min. 50% of kitchen lighting wattage shall be of high efficacy lights per cec 150(k)Details
kitchen remodel-replace countertop, cabinets, sink, flooring & lights. min. 50% of kitchen lighting wattage shall be of high efficacy lights per cec 150(k) | $16,974 |
| Sep 11, 2006 | Never finaled issued Sep 2006, no final | 1538 Baker St | remodel 3rd floor kitchenm, bathrm, and two bedrm, relace rm windows, same size in kind remodel 2nd floor kitchen unders 200608210030.Details
remodel 3rd floor kitchenm, bathrm, and two bedrm, relace rm windows, same size in kind remodel 2nd floor kitchen unders 200608210030. | $12,000 |
| Aug 21, 2006 | Completed final sign-off Jan 2007 | 1540 Baker St | remodel kitchen.Details
remodel kitchen. | $8,300 |
| Aug 8, 2006 | Completed final sign-off Jan 2007 | 1710 35th Av | add 1 family room and 1 full bath on existing ground floor per plan and also remodel existing kitchen an bathroom on 2nd floor per planDetails
add 1 family room and 1 full bath on existing ground floor per plan and also remodel existing kitchen an bathroom on 2nd floor per plan | $26,000 |
| Oct 4, 2004 | Expired or cancelled expired Mar 2007 | 150 Sweeny St | 2nd flr- remodeling of a kitchen and a bathroomDetails
2nd flr- remodeling of a kitchen and a bathroom | $16,000 |
| Jun 29, 2004 | Expired or cancelled expired Dec 2005 | 2031 Thomas Av | kitchen, bathroom remodel.Details
kitchen, bathroom remodel. | $12,000 |
| Oct 9, 2003 | Completed final sign-off Jan 2004 | 1923 Pacheco St | remodel kitchen, replace cabinets/tilesDetails
remodel kitchen, replace cabinets/tiles | $5,000 |
| May 23, 2003 | Completed final sign-off Aug 2003 | 2792 36th Av | remodeling of kitchen. no wall removal on add.Details
remodeling of kitchen. no wall removal on add. | $2,300 |
| Apr 2, 2001 | Expired or cancelled expired Apr 2002 | 133 Steiner St | kitchen and bathroomn remodel, fixtures, tile work, new drywall in kitchen/bath area new door and wiDetails
kitchen and bathroomn remodel, fixtures, tile work, new drywall in kitchen/bath area new door and wi | $15,000 |