Back to bathroom remodel contractors
Sturdy Home Builders
- Based in
- San Francisco
- On San Francisco permits
- Apr 2001 to May 2024
- Last 24 months
- 0 permits filed
35 permits since 2000: 28 completed, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 12 completed, 5 expired or cancelled. Typically 2 days from filing to permit and 91 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 13, 2024 | Completed final sign-off May 2025 | 1619 35th Av | gr fl appx 696 sf for family room, bedroom, patio door.e bath remodel, new front door,relocate laundry, water heater.2nd fl remove wall between dining rm, kitchen, remove wall between lvg rm/kitchen.remodel kitchen/bath.new pwdr room, demo fireplace.new windows. close skylt, enlrg skylt,new skylt.Details
gr fl appx 696 sf for family room, bedroom, patio door.e bath remodel, new front door,relocate laundry, water heater.2nd fl remove wall between dining rm, kitchen, remove wall between lvg rm/kitchen.remodel kitchen/bath.new pwdr room, demo fireplace.new windows. close skylt, enlrg skylt,new skylt. | $20,000 |
| Aug 23, 2017 | Completed final sign-off Nov 2017 | 2671 44th Av | remodel kitchen on 2nd floor. add media room, 2 bedrooms, exercise room and a full bath on 1st floorDetails
remodel kitchen on 2nd floor. add media room, 2 bedrooms, exercise room and a full bath on 1st floor | $50,000 |
| Jul 11, 2017 | Completed final sign-off Nov 2017 | 2671 44th Av | convert one bathroom to 2 full baths on 2/f, replace 11 windows, replace furnace and water heater. replace front wood windows in-kind with wood windows same size opening and locations.Details
convert one bathroom to 2 full baths on 2/f, replace 11 windows, replace furnace and water heater. replace front wood windows in-kind with wood windows same size opening and locations. | $26,000 |
| Apr 12, 2016 | Completed final sign-off Dec 2016 | 2543 31st Av | add two bedrooms, two full bathrooms & a mud room on 1st floor. construct a rear deck off 2nd floor .Details
add two bedrooms, two full bathrooms & a mud room on 1st floor. construct a rear deck off 2nd floor . | $60,000 |
| Jan 7, 2016 | Completed final sign-off Mar 2016 | 305 Guttenberg St | remodel existing bathrooms (2); remodel existing kitchen (1), replace in-kind.Details
remodel existing bathrooms (2); remodel existing kitchen (1), replace in-kind. | $18,000 |
| Oct 5, 2015 | Completed final sign-off Feb 2016 | 2311 32nd Av | remodel kitchen, add a new full bath and add new recessed lights window at 1st floor at storage room.Details
remodel kitchen, add a new full bath and add new recessed lights window at 1st floor at storage room. | $15,000 |
| Dec 3, 2013 | Completed final sign-off Jun 2014 | 2790 38th Av | revision to app#201311141933. modified bathroom and closet location changed windows size. eliminate foundation work.Details
revision to app#201311141933. modified bathroom and closet location changed windows size. eliminate foundation work. | |
| Nov 14, 2013 | Expired or cancelled expired Jul 2015 | 2790 38th Av | remodel 2nd floor kitchen and bahtroom. add family room and bathroom on 1st floor. relocate washer and dyrer. new furnace and water heater.Details
remodel 2nd floor kitchen and bahtroom. add family room and bathroom on 1st floor. relocate washer and dyrer. new furnace and water heater. | $45,000 |
| Dec 4, 2012 | Expired or cancelled cancelled Oct 2014 | 2395 26th Av | tenant improvement (commercial unit #1) -new interior partition walls for 4 new offices, 1 conference room & breakroom. upgrade (e) bathroom to ada complyDetails
tenant improvement (commercial unit #1) -new interior partition walls for 4 new offices, 1 conference room & breakroom. upgrade (e) bathroom to ada comply | $40,000 |
| Jul 21, 2011 | Completed final sign-off Sep 2011 | 1376 16th Av | remodeling of (1) kitchen and (2) bathrooms. add 5 recessed light fixtures in kitchen. no wall removal, no structural work. 50% high efficacy (wattage) cec 150(k)Details
remodeling of (1) kitchen and (2) bathrooms. add 5 recessed light fixtures in kitchen. no wall removal, no structural work. 50% high efficacy (wattage) cec 150(k) | $11,000 |
| Mar 30, 2011 | Completed final sign-off Jun 2011 | 2115 39th Av | 2nd floor- kitchen work: replace old countertop and tile works. need electrical and plumbing. a minimum of 50% of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy. permanently installed lights in bathroom shall be high efficacy unlessDetails
2nd floor- kitchen work: replace old countertop and tile works. need electrical and plumbing. a minimum of 50% of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy. permanently installed lights in bathroom shall be high efficacy unless | $7,500 |
| Sep 15, 2009 | Completed final sign-off Dec 2009 | 2792 36th Av | addition of (n) bedroom, (n) bath room, (n) living room and (n) storage room in existing ground floor. no exterior changes. ground floor alteration, no structural work.Details
addition of (n) bedroom, (n) bath room, (n) living room and (n) storage room in existing ground floor. no exterior changes. ground floor alteration, no structural work. | $25,000 |
| Aug 8, 2006 | Completed final sign-off Jan 2007 | 1710 35th Av | add 1 family room and 1 full bath on existing ground floor per plan and also remodel existing kitchen an bathroom on 2nd floor per planDetails
add 1 family room and 1 full bath on existing ground floor per plan and also remodel existing kitchen an bathroom on 2nd floor per plan | $26,000 |
| Nov 22, 2005 | Completed final sign-off Jan 2006 | 1820 Mason St | remodel bathroom, add 1 toilet, replace shower stall and sink at 2nd floor, new drywall in bath and tile, no new lightDetails
remodel bathroom, add 1 toilet, replace shower stall and sink at 2nd floor, new drywall in bath and tile, no new light | $5,000 |
| Oct 4, 2004 | Expired or cancelled expired Mar 2007 | 150 Sweeny St | 2nd flr- remodeling of a kitchen and a bathroomDetails
2nd flr- remodeling of a kitchen and a bathroom | $16,000 |
| Jun 29, 2004 | Expired or cancelled expired Dec 2005 | 2031 Thomas Av | kitchen, bathroom remodel.Details
kitchen, bathroom remodel. | $12,000 |
| Apr 2, 2001 | Expired or cancelled expired Apr 2002 | 133 Steiner St | kitchen and bathroomn remodel, fixtures, tile work, new drywall in kitchen/bath area new door and wiDetails
kitchen and bathroomn remodel, fixtures, tile work, new drywall in kitchen/bath area new door and wi | $15,000 |