Structural Integrity
- Based in
- San Anselmo
- On San Francisco permits
- Nov 2000 to Jul 2026
- Last 24 months
- 2 permits filed
16 permits since 2000: 9 completed, 2 in progress, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 in progress. Typically 201 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 18, 2025 | In progress issued Jul 2026 | 28 Raleigh Av | existing 2 story rear addition (441 sq ft), interior stair and kitchen reconfiguration of an existing single family home. reconfiguration of existing rear-deck. replacement of existing knob and tube wiring.Details
existing 2 story rear addition (441 sq ft), interior stair and kitchen reconfiguration of an existing single family home. reconfiguration of existing rear-deck. replacement of existing knob and tube wiring. | $240,000 |