Back to bathroom remodel contractors
Structural Integrity
- Based in
- San Anselmo
- On San Francisco permits
- Nov 2000 to Jul 2026
- Last 24 months
- 2 permits filed
16 permits since 2000: 9 completed, 2 in progress, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 2 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 2892 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2023 | Never finaled issued Apr 2023, no final | 3526 Anza St | remodel e bathroom, same number of fixtures, new tile, window, toilet, vanity, fan, etcDetails
remodel e bathroom, same number of fixtures, new tile, window, toilet, vanity, fan, etc | $15,000 |
| Mar 3, 2009 | Completed final sign-off Oct 2024 | 2200 Pacific Av | bathroom remodel: (n) shower tile, toilet, floor tile, vanity and lights, no relocation of walls, bathroom 5'x10'; no window & no door work on this permitDetails
bathroom remodel: (n) shower tile, toilet, floor tile, vanity and lights, no relocation of walls, bathroom 5'x10'; no window & no door work on this permit | $15,000 |
| Dec 26, 2008 | Completed final sign-off Mar 2009 | 238 Flood Av | kitchen remodel, new cabinets, counter, lights, remove of aprox 16" wall w/new 4x12x5' header. tile @ bathroom & remodel 1 bathroom.Details
kitchen remodel, new cabinets, counter, lights, remove of aprox 16" wall w/new 4x12x5' header. tile @ bathroom & remodel 1 bathroom. | $40,000 |
| Mar 16, 2006 | Expired or cancelled expired May 2007 | 735 Montgomery St | interior remodel-rev to 200601111939.move interior walls,remove wall in front of existing wall,add space to women's bathroom,remove office&storage room,increase of occupancy load from 273to275.remove suspended ceiling,chg lighting,remove doors from door schedule,remove details no longer relevantDetails
interior remodel-rev to 200601111939.move interior walls,remove wall in front of existing wall,add space to women's bathroom,remove office&storage room,increase of occupancy load from 273to275.remove suspended ceiling,chg lighting,remove doors from door schedule,remove details no longer relevant | |
| Jan 30, 2006 | Expired or cancelled expired Oct 2008 | 2018 Fell St | replace (e) kitchen cabinets & counters with new in (e) locations. remove & replace 12 single glazed window @ front of house with new double glazed. remove & replace (e) bathroom tile, tub, sink & vanity in (e) locations. add toilet in wash room on all 3 floors.Details
replace (e) kitchen cabinets & counters with new in (e) locations. remove & replace 12 single glazed window @ front of house with new double glazed. remove & replace (e) bathroom tile, tub, sink & vanity in (e) locations. add toilet in wash room on all 3 floors. | $26,000 |