Back to kitchen remodel contractors
Structoris Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2005 to Aug 2026
- Last 24 months
- 6 permits filed
42 permits since 2000: 28 completed, 8 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 238 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 17, 2022 | Completed final sign-off Oct 2022 | 2189 Market St | unit #4: remodel existing kitchen(1), same layout. change cabinets; tile backsplash; new countertop by other. relocate fridge; all other appliances to remain in same location. change flooring. paint.Details
unit #4: remodel existing kitchen(1), same layout. change cabinets; tile backsplash; new countertop by other. relocate fridge; all other appliances to remain in same location. change flooring. paint. | $38,000 |
| Aug 18, 2021 | Completed final sign-off May 2022 | 675 39th Av | convert garage area to living area with 2 bedrooms, 1 bath and laundry remodel (e) 2nd fl. kitchen, bathroom and powder room , replace some windows no work is visible from public wayDetails
convert garage area to living area with 2 bedrooms, 1 bath and laundry remodel (e) 2nd fl. kitchen, bathroom and powder room , replace some windows no work is visible from public way | $150,000 |
| May 25, 2021 | Completed final sign-off Jun 2022 | 1638 Quesada Av | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $11,000 |
| Oct 21, 2020 | Completed final sign-off Mar 2023 | 398 12th St | remodel (e) kitchen of (e) bar/restaurant to serve expanded menu of food. remove & repl with (n) grease producing appliances, new hood/exhaust, new roof fan. new walk-in fridge. new ul300 ansul fire protection system under sep permit.Details
remodel (e) kitchen of (e) bar/restaurant to serve expanded menu of food. remove & repl with (n) grease producing appliances, new hood/exhaust, new roof fan. new walk-in fridge. new ul300 ansul fire protection system under sep permit. | $25,000 |
| Nov 28, 2005 | Completed final sign-off Feb 2006 | 226 Naples St | upper floor remodel; relocate (e) kitchen & (e) bathroom on upper floor. plumbing, electrical & partition walls to be relocated. door openings to be widen. (engineers drawings / cales) attached.Details
upper floor remodel; relocate (e) kitchen & (e) bathroom on upper floor. plumbing, electrical & partition walls to be relocated. door openings to be widen. (engineers drawings / cales) attached. | $33,000 |