Back to bathroom remodel contractors
Structoris Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2005 to Aug 2026
- Last 24 months
- 6 permits filed
42 permits since 2000: 28 completed, 8 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 7 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 222 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 11, 2026 | In progress filed May 2026, not yet issued | 1478 48th Av | 1) convert garage storage into a new bedroom with bathroom and office. 2) resize front entry door 3) updated all electrical outlets, switches and wiring in house.Details
1) convert garage storage into a new bedroom with bathroom and office. 2) resize front entry door 3) updated all electrical outlets, switches and wiring in house. | $180,000 |
| Oct 8, 2024 | Completed final sign-off Jan 2025 | 5160 Diamond Heights Bl | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $19,647 |
| Jan 17, 2024 | Completed final sign-off Nov 2024 | 41 Mars St | remodel existing bathroom: replace tile vanity/ faucet shower valve trim relocate shower control/head. no change in location and fixturesDetails
remodel existing bathroom: replace tile vanity/ faucet shower valve trim relocate shower control/head. no change in location and fixtures | $33,000 |
| Aug 18, 2021 | Completed final sign-off May 2022 | 675 39th Av | convert garage area to living area with 2 bedrooms, 1 bath and laundry remodel (e) 2nd fl. kitchen, bathroom and powder room , replace some windows no work is visible from public wayDetails
convert garage area to living area with 2 bedrooms, 1 bath and laundry remodel (e) 2nd fl. kitchen, bathroom and powder room , replace some windows no work is visible from public way | $150,000 |
| Jun 19, 2020 | Expired or cancelled expired May 2024 | 3555 23rd St | remodel gr fl bath. replace shower pan, toilet, lavatory. install new glass around shower. new fan/light. update e electrical. new insulation/drywall, tile on floor and around shower. remodel e bath.Details
remodel gr fl bath. replace shower pan, toilet, lavatory. install new glass around shower. new fan/light. update e electrical. new insulation/drywall, tile on floor and around shower. remodel e bath. | $27,000 |
| Dec 16, 2019 | Never finaled issued Dec 2019, no final | 406 Lansdale Av | remodel bathroom. remodel room 1 & 2 outside of bathroom. : replace ceiling sheetrock, install recessed lights.Details
remodel bathroom. remodel room 1 & 2 outside of bathroom. : replace ceiling sheetrock, install recessed lights. | $23,000 |
| Dec 19, 2018 | Never finaled issued Dec 2018, no final | 406 Lansdale Av | remodel upstairs master and hall bath (no change in layout). master: replace toilet, vanity, sink, bathtub. hall: replace shower pan, toilet. both: replace fan, lights, frame for vanity/med cabinet. r-13 insulation in wall, r-38 in ceiling. cement board for floor/wall. demo/tile by owner.Details
remodel upstairs master and hall bath (no change in layout). master: replace toilet, vanity, sink, bathtub. hall: replace shower pan, toilet. both: replace fan, lights, frame for vanity/med cabinet. r-13 insulation in wall, r-38 in ceiling. cement board for floor/wall. demo/tile by owner. | $35,000 |
| Dec 11, 2007 | Completed final sign-off Jun 2008 | 25 Lakewood Av | remodel bathroom extg. remove extg finishes, ie, tile, lath & plaster/retile, install drywall, replace bathtub, sink, toilet. install 4 recessed lights/1 flourscent sofit light /2 gfcei no structural changesDetails
remodel bathroom extg. remove extg finishes, ie, tile, lath & plaster/retile, install drywall, replace bathtub, sink, toilet. install 4 recessed lights/1 flourscent sofit light /2 gfcei no structural changes | $18,700 |
| Mar 2, 2007 | Completed final sign-off Feb 2008 | 2436 15th Av | basement remodel-bedroom, bathroom, home office addition. plumbing & electrical by seperate permit.Details
basement remodel-bedroom, bathroom, home office addition. plumbing & electrical by seperate permit. | $23,450 |
| Nov 28, 2005 | Completed final sign-off Feb 2006 | 226 Naples St | upper floor remodel; relocate (e) kitchen & (e) bathroom on upper floor. plumbing, electrical & partition walls to be relocated. door openings to be widen. (engineers drawings / cales) attached.Details
upper floor remodel; relocate (e) kitchen & (e) bathroom on upper floor. plumbing, electrical & partition walls to be relocated. door openings to be widen. (engineers drawings / cales) attached. | $33,000 |
| Jul 15, 2005 | Completed final sign-off Feb 2006 | 226 Naples St | replace drywall in (e)lower floor bedroom.build new lower floor bathroom with fiberglass shower.Details
replace drywall in (e)lower floor bedroom.build new lower floor bathroom with fiberglass shower. | $16,400 |