Back to kitchen remodel contractors
Straight Builders Inc
- Based in
- Santa Rosa
- On San Francisco permits
- Feb 2007 to Oct 2015
- Last 24 months
- 0 permits filed
27 permits since 2000: 24 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 11 completed, 1 never finaled. Typically 0 days from filing to permit and 254 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 7, 2015 | Completed final sign-off Dec 2016 | 1896 Pacific Av | unit 402: demolish and reconfigure kitchen, enlarge opening between dining and living room, reconfigure laundry room, remodel master bath, master bedroom, closet, remodel powder bathDetails
unit 402: demolish and reconfigure kitchen, enlarge opening between dining and living room, reconfigure laundry room, remodel master bath, master bedroom, closet, remodel powder bath | $190,000 |
| Aug 5, 2015 | Completed final sign-off Jan 2016 | 1896 Pacific Av | infill floor opening. demolish and reconfigure kitchen. enlarge opening betweeen dining and living room. reconfigure laundry(coat closet). remodel bath 2Details
infill floor opening. demolish and reconfigure kitchen. enlarge opening betweeen dining and living room. reconfigure laundry(coat closet). remodel bath 2 | $15,000 |
| Jun 8, 2015 | Completed final sign-off Jan 2016 | 1896 Pacific Av | unit 204: new kitchen cabinets & appliances. refinish hardwood floor & new counterrops. same layout as existing. remodel (e) bathroom.Details
unit 204: new kitchen cabinets & appliances. refinish hardwood floor & new counterrops. same layout as existing. remodel (e) bathroom. | $125,000 |
| Mar 23, 2015 | Completed final sign-off Aug 2015 | 1896 Pacific Av | new kitchen cabinets & appliances, refinish kitchen hardwood floor, new countertops, same layout as existing.Details
new kitchen cabinets & appliances, refinish kitchen hardwood floor, new countertops, same layout as existing. | $45,000 |
| Jun 24, 2014 | Completed final sign-off May 2016 | 4349 18th St | new beams/posts & concrete slab @ ground floor, renovations of 2nd, 3rd & 4th floors. new kitchens & bathrooms. new floor, wall & ceiling finishes, new windows & doors, electrical & hvac, new ext/interior paint, (e) stairs & deck ot remain - (n) balustrade.Details
new beams/posts & concrete slab @ ground floor, renovations of 2nd, 3rd & 4th floors. new kitchens & bathrooms. new floor, wall & ceiling finishes, new windows & doors, electrical & hvac, new ext/interior paint, (e) stairs & deck ot remain - (n) balustrade. | $245,000 |
| Feb 18, 2014 | Completed final sign-off Mar 2015 | 26 Ellert St | alternations @ 2nd and 3rd (both units): new kitchens & bathrooms, new walls & ceiling finishes, new electrical and mechanical. to comply with nov. dated 07.16.2013 comp. # 201058726.Details
alternations @ 2nd and 3rd (both units): new kitchens & bathrooms, new walls & ceiling finishes, new electrical and mechanical. to comply with nov. dated 07.16.2013 comp. # 201058726. | $100,000 |
| Dec 19, 2013 | Completed final sign-off Dec 2014 | 378 Funston Av | renovation of 2nd, 3rd and 4th floors:kitchen, bathrooms, flooring electrical, plmg and painting... various windows in like kind.Details
renovation of 2nd, 3rd and 4th floors:kitchen, bathrooms, flooring electrical, plmg and painting... various windows in like kind. | $225,000 |
| Oct 15, 2013 | Completed final sign-off Jun 2014 | 378 Funston Av | demo permit for (2) kitchens & (4) bathrooms; this is for non -structural demolition only.Details
demo permit for (2) kitchens & (4) bathrooms; this is for non -structural demolition only. | $4,500 |
| Sep 12, 2013 | Completed final sign-off Jan 2014 | 1896 Pacific Av | work in unit #304: new closet cabinetry, led cabinet lighting & painting at master bedroom, guest room and kitchen. no new wall and no existing wall relocation (not a kitchen remodel).Details
work in unit #304: new closet cabinetry, led cabinet lighting & painting at master bedroom, guest room and kitchen. no new wall and no existing wall relocation (not a kitchen remodel). | $9,000 |
| May 22, 2013 | Never finaled issued May 2013, no final | 2635 Buchanan St | kitchen remodel: remove & replace cabinets at east wall, led recessed lights, new countertops, tile splash, paint & remove part of dining/kitchen wallDetails
kitchen remodel: remove & replace cabinets at east wall, led recessed lights, new countertops, tile splash, paint & remove part of dining/kitchen wall | $40,000 |
| Aug 5, 2011 | Completed final sign-off Sep 2012 | 1896 Pacific Av | new kitchen cabinetry (in kind non structural) remodel one bathroom, paintingDetails
new kitchen cabinetry (in kind non structural) remodel one bathroom, painting | $55,000 |
| Nov 6, 2007 | Completed final sign-off Mar 2008 | 1896 Pacific Av | unit #504: non-structural kitchen remodel to include new cabinets, electrical & plumbingDetails
unit #504: non-structural kitchen remodel to include new cabinets, electrical & plumbing | $48,000 |