Back to bathroom remodel contractors
Straight Builders Inc
- Based in
- Santa Rosa
- On San Francisco permits
- Feb 2007 to Oct 2015
- Last 24 months
- 0 permits filed
27 permits since 2000: 24 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 14 completed. Typically 4 days from filing to permit and 300 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 7, 2015 | Completed final sign-off Dec 2016 | 1896 Pacific Av | unit 402: demolish and reconfigure kitchen, enlarge opening between dining and living room, reconfigure laundry room, remodel master bath, master bedroom, closet, remodel powder bathDetails
unit 402: demolish and reconfigure kitchen, enlarge opening between dining and living room, reconfigure laundry room, remodel master bath, master bedroom, closet, remodel powder bath | $190,000 |
| Aug 5, 2015 | Completed final sign-off Jan 2016 | 1896 Pacific Av | infill floor opening. demolish and reconfigure kitchen. enlarge opening betweeen dining and living room. reconfigure laundry(coat closet). remodel bath 2Details
infill floor opening. demolish and reconfigure kitchen. enlarge opening betweeen dining and living room. reconfigure laundry(coat closet). remodel bath 2 | $15,000 |
| Jun 8, 2015 | Completed final sign-off Jan 2016 | 1896 Pacific Av | unit 204: new kitchen cabinets & appliances. refinish hardwood floor & new counterrops. same layout as existing. remodel (e) bathroom.Details
unit 204: new kitchen cabinets & appliances. refinish hardwood floor & new counterrops. same layout as existing. remodel (e) bathroom. | $125,000 |
| Jun 24, 2014 | Completed final sign-off May 2016 | 4349 18th St | new beams/posts & concrete slab @ ground floor, renovations of 2nd, 3rd & 4th floors. new kitchens & bathrooms. new floor, wall & ceiling finishes, new windows & doors, electrical & hvac, new ext/interior paint, (e) stairs & deck ot remain - (n) balustrade.Details
new beams/posts & concrete slab @ ground floor, renovations of 2nd, 3rd & 4th floors. new kitchens & bathrooms. new floor, wall & ceiling finishes, new windows & doors, electrical & hvac, new ext/interior paint, (e) stairs & deck ot remain - (n) balustrade. | $245,000 |
| Feb 18, 2014 | Completed final sign-off Mar 2015 | 26 Ellert St | new master suite with new bedroom, bathroom and closet at gr floor.Details
new master suite with new bedroom, bathroom and closet at gr floor. | $25,000 |
| Feb 18, 2014 | Completed final sign-off Mar 2015 | 26 Ellert St | alternations @ 2nd and 3rd (both units): new kitchens & bathrooms, new walls & ceiling finishes, new electrical and mechanical. to comply with nov. dated 07.16.2013 comp. # 201058726.Details
alternations @ 2nd and 3rd (both units): new kitchens & bathrooms, new walls & ceiling finishes, new electrical and mechanical. to comply with nov. dated 07.16.2013 comp. # 201058726. | $100,000 |
| Dec 30, 2013 | Completed final sign-off Dec 2014 | 378 Funston Av | new ground floor master bedroom, bathroom, and media room.Details
new ground floor master bedroom, bathroom, and media room. | $20,000 |
| Dec 19, 2013 | Completed final sign-off Dec 2014 | 378 Funston Av | renovation of 2nd, 3rd and 4th floors:kitchen, bathrooms, flooring electrical, plmg and painting... various windows in like kind.Details
renovation of 2nd, 3rd and 4th floors:kitchen, bathrooms, flooring electrical, plmg and painting... various windows in like kind. | $225,000 |
| Oct 15, 2013 | Completed final sign-off Jun 2014 | 378 Funston Av | demo permit for (2) kitchens & (4) bathrooms; this is for non -structural demolition only.Details
demo permit for (2) kitchens & (4) bathrooms; this is for non -structural demolition only. | $4,500 |
| Apr 3, 2012 | Completed final sign-off Sep 2012 | 1200 California St | bathroom renovation (master), closet cabinetry, bedroom cabinetry & bedroom electrical (master)Details
bathroom renovation (master), closet cabinetry, bedroom cabinetry & bedroom electrical (master) | $11,000 |
| Feb 15, 2012 | Completed final sign-off Sep 2012 | 1896 Pacific Av | remodel of one additional bathroomDetails
remodel of one additional bathroom | $3,000 |
| Aug 5, 2011 | Completed final sign-off Sep 2012 | 1896 Pacific Av | new kitchen cabinetry (in kind non structural) remodel one bathroom, paintingDetails
new kitchen cabinetry (in kind non structural) remodel one bathroom, painting | $55,000 |
| Jun 18, 2008 | Completed final sign-off Aug 2008 | 1896 Pacific Av | 7th floor unit #702: install toilet, vanity & lighting for a new powder bathroom, lighting to meet t-24, bath to have exhaust fan. high efficency or manual on auto off switch.Details
7th floor unit #702: install toilet, vanity & lighting for a new powder bathroom, lighting to meet t-24, bath to have exhaust fan. high efficency or manual on auto off switch. | $16,000 |
| Feb 22, 2007 | Completed final sign-off May 2007 | 1895 Pacific Av | remodel 1 bath includes: new tile, lighting fixtures, new plumbing fixtures. lighting to be in compliance with title 24 energy codesDetails
remodel 1 bath includes: new tile, lighting fixtures, new plumbing fixtures. lighting to be in compliance with title 24 energy codes | $9,500 |