Steve Dudum Construction
- Based in
- Montara
- On San Francisco permits
- Apr 2000 to Feb 2013
- Last 24 months
- 0 permits filed
19 permits since 2000: 17 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 2 days from filing to permit and 96 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 16, 2012 | Completed final sign-off Dec 2012 | 702 14th St | staircase replacement in kind at rear. replace all windows on north elevation. replace waterproofing, siding on north elevationDetails
staircase replacement in kind at rear. replace all windows on north elevation. replace waterproofing, siding on north elevation | $8,400 |
| May 10, 2010 | Completed final sign-off Jul 2010 | 1374 Portola Dr | dryrot repair fo front entry stairs <50% of work, dryrot scetio nof repair is approx 30 sq, to be repaired in kind.Details
dryrot repair fo front entry stairs <50% of work, dryrot scetio nof repair is approx 30 sq, to be repaired in kind. | $4,000 |