Back to bathroom remodel contractors
Steve Dudum Construction
- Based in
- Montara
- On San Francisco permits
- Apr 2000 to Feb 2013
- Last 24 months
- 0 permits filed
19 permits since 2000: 17 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 10 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 155 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 18, 2013 | Completed final sign-off Aug 2013 | 129 Carl St | revision to appl #2013.01.10.7642 - 3rd floor #129 - remodel kitchen and bath, new window at kitchen at rear, new gas fireplace insertDetails
revision to appl #2013.01.10.7642 - 3rd floor #129 - remodel kitchen and bath, new window at kitchen at rear, new gas fireplace insert | $2,000 |
| Jan 10, 2013 | Completed final sign-off Aug 2013 | 127 Carl St | work to be done in 129 carl st. demo and replace in kind (e) kitchen and bathroom. no structural work and removal of partition wall.Details
work to be done in 129 carl st. demo and replace in kind (e) kitchen and bathroom. no structural work and removal of partition wall. | $19,000 |
| Mar 14, 2011 | Completed final sign-off Sep 2011 | 548 Shotwell St | new full bathroom (shower, sink & toilet) with lighting on the 1st floor.Details
new full bathroom (shower, sink & toilet) with lighting on the 1st floor. | $4,500 |
| Jun 9, 2009 | Completed final sign-off Sep 2009 | 321 Mangels Av | add 1 full bathroom on 1st floor, relocate washer & dryer.Details
add 1 full bathroom on 1st floor, relocate washer & dryer. | $10,000 |
| Apr 10, 2009 | Completed final sign-off Sep 2009 | 150 Alton Av | remodel 2 bathrooms & kitchen in kind. no structural change involved.Details
remodel 2 bathrooms & kitchen in kind. no structural change involved. | $34,000 |
| Nov 29, 2006 | Completed final sign-off May 2007 | 321 Mangels Av | remodel (e) 1 kitchen & 1 bathroom. no structural work. no new light fixtures.Details
remodel (e) 1 kitchen & 1 bathroom. no structural work. no new light fixtures. | $13,500 |
| Jun 7, 2005 | Completed final sign-off Mar 2006 | 1831 Fulton St | build out of back 1/3 rd of garage to worksitop and dance/yoga studio with added bath.Details
build out of back 1/3 rd of garage to worksitop and dance/yoga studio with added bath. | $25,000 |
| Feb 2, 2004 | Expired or cancelled expired Jul 2011 | 22 Clayton St | replace bathroom & water closet in kind, add toilet to (e) bathroom in place of closetDetails
replace bathroom & water closet in kind, add toilet to (e) bathroom in place of closet | $9,000 |
| Nov 8, 2002 | Completed final sign-off Mar 2003 | 1326 31st Av | remodeling of existing kitchen & two bathrooms. demolition of existing non bearing walls, removal ofDetails
remodeling of existing kitchen & two bathrooms. demolition of existing non bearing walls, removal of | $35,000 |
| Jun 5, 2002 | Completed final sign-off Jul 2002 | 481 Yale St | bathroom replacement in kind. at 3rd floorDetails
bathroom replacement in kind. at 3rd floor | $7,500 |
| Apr 6, 2000 | Completed final sign-off Aug 2000 | 1978 18th Av | bathroom remodelingDetails
bathroom remodeling | $6,400 |