Stay Covered Builders Inc
- Based in
- San Mateo
- On San Francisco permits
- Nov 2014 to Dec 2021
- Last 24 months
- 0 permits filed
33 permits since 2000: 20 completed, 5 never finaled, 8 expired or cancelled.
Of the 5 never-finaled permits, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 25 days from filing to permit and 497 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2019 | Completed final sign-off Mar 2021 | 627 29th St | 2nd floor: remodel bath & master bath, covert hall alcove into bedroom. replace windows & glass doors, remove (e) 2 heating furnaces & related duct work. install (n) hydronic heat boiler & radiators. repair in-kind existing exterior stair guardrail in rear, new woodscreen @ 3rd floorDetails
2nd floor: remodel bath & master bath, covert hall alcove into bedroom. replace windows & glass doors, remove (e) 2 heating furnaces & related duct work. install (n) hydronic heat boiler & radiators. repair in-kind existing exterior stair guardrail in rear, new woodscreen @ 3rd floor | $60,000 |
| Jan 29, 2018 | Completed final sign-off Sep 2019 | 571 Ivy St | repair (e) wood stairs in-kind, less than 50% repair replacement. and water proofing underneath.Details
repair (e) wood stairs in-kind, less than 50% repair replacement. and water proofing underneath. | $500 |