Back to bathroom remodel contractors
Stay Covered Builders Inc
- Based in
- San Mateo
- On San Francisco permits
- Nov 2014 to Dec 2021
- Last 24 months
- 0 permits filed
33 permits since 2000: 20 completed, 5 never finaled, 8 expired or cancelled.
Of the 5 never-finaled permits, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 9 completed, 1 never finaled, 2 expired or cancelled. Typically 8 days from filing to permit and 399 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 2, 2021 | Completed final sign-off Apr 2022 | 224 Day St | revision to permit #202109017602. 1)work being performed is on 2nd floor bathrooms. 2)walls removed and beam installed to creatre hallway. 3) relocate extg master bath & master closet. 4)added skylights close to property line. 5)removed ceiling of 1st floor living for plmg for bathroomsDetails
revision to permit #202109017602. 1)work being performed is on 2nd floor bathrooms. 2)walls removed and beam installed to creatre hallway. 3) relocate extg master bath & master closet. 4)added skylights close to property line. 5)removed ceiling of 1st floor living for plmg for bathrooms | $80,000 |
| Sep 1, 2021 | Completed final sign-off Apr 2022 | 224 Day St | interior 2/f renovation including 2 bathrooms, in-kind, replacing interior doors, repairing hardwood floors where ndeeded, new drywall & paint.Details
interior 2/f renovation including 2 bathrooms, in-kind, replacing interior doors, repairing hardwood floors where ndeeded, new drywall & paint. | $60,000 |
| Mar 13, 2020 | Completed final sign-off Jun 2021 | 4426 19th St | interior renovation with structural improvements. int. painting, drywall, removing non-bearing and bearing walls. moving posts and beam on second floor. kitchen and 4 bath remodel.Details
interior renovation with structural improvements. int. painting, drywall, removing non-bearing and bearing walls. moving posts and beam on second floor. kitchen and 4 bath remodel. | $150,000 |
| Dec 12, 2019 | Completed final sign-off Mar 2021 | 627 29th St | 2nd floor: remodel bath & master bath, covert hall alcove into bedroom. replace windows & glass doors, remove (e) 2 heating furnaces & related duct work. install (n) hydronic heat boiler & radiators. repair in-kind existing exterior stair guardrail in rear, new woodscreen @ 3rd floorDetails
2nd floor: remodel bath & master bath, covert hall alcove into bedroom. replace windows & glass doors, remove (e) 2 heating furnaces & related duct work. install (n) hydronic heat boiler & radiators. repair in-kind existing exterior stair guardrail in rear, new woodscreen @ 3rd floor | $60,000 |
| Nov 7, 2019 | Never finaled issued Feb 2020, no final | 627 29th St | convert 1st fl into adu per ordinance #95-17. remodel bath @ 1st floor, add laundry room @ 1st floor.Details
convert 1st fl into adu per ordinance #95-17. remodel bath @ 1st floor, add laundry room @ 1st floor. | $20,000 |
| Dec 21, 2017 | Completed final sign-off Feb 2019 | 535 Dolores St | interior renovations, kitchen and 2 & 1/2 baths, 2 bedrooms, new windows, sidingDetails
interior renovations, kitchen and 2 & 1/2 baths, 2 bedrooms, new windows, siding | $150,000 |
| Jun 30, 2017 | Completed final sign-off Jun 2018 | 571 Ivy St | conversion of extg one unit bldg to 2 units. inerior renovation within the bldg envelope to include 2 new kitchens, renovate 3 bathrooms and add 2 new bathrooms, conversion of unconditioned basement into conditioned living space. minor exterior upgrades to include new window and door openings.Details
conversion of extg one unit bldg to 2 units. inerior renovation within the bldg envelope to include 2 new kitchens, renovate 3 bathrooms and add 2 new bathrooms, conversion of unconditioned basement into conditioned living space. minor exterior upgrades to include new window and door openings. | $175,000 |
| May 18, 2017 | Completed final sign-off Jun 2018 | 571 Ivy St | bathroom remodel (1st floor powder room), soft demolition of finishes, new toilet/sink, drywall repair (remodel work at the same location & area - no partition will be removed)Details
bathroom remodel (1st floor powder room), soft demolition of finishes, new toilet/sink, drywall repair (remodel work at the same location & area - no partition will be removed) | $1,000 |
| Dec 22, 2016 | Expired or cancelled expired Jan 2020 | 63 Sunview Dr | within (e) building envelope: soft demolition of floor finishes, bath and kitchen. foundation strengthening. walls and floor framing structural strengthening. sistered (e) stud & joist and replace of deteriorated framing members and plywood sheathing as required.Details
within (e) building envelope: soft demolition of floor finishes, bath and kitchen. foundation strengthening. walls and floor framing structural strengthening. sistered (e) stud & joist and replace of deteriorated framing members and plywood sheathing as required. | $60,000 |
| Nov 29, 2016 | Completed final sign-off Mar 2019 | 1613 Church St | remodel basement, 1st floor and second floor within bldg envelope. remodel kitchen and bathrooms and replace windows at rear(all floor) all structural work if required under seperate permit.basement add insulation.Details
remodel basement, 1st floor and second floor within bldg envelope. remodel kitchen and bathrooms and replace windows at rear(all floor) all structural work if required under seperate permit.basement add insulation. | $20,000 |
| Nov 3, 2016 | Expired or cancelled suspend Aug 2017 | 4068 Folsom St | voluntary foundation strengthening within building envelope per plan. soft demolition of non-bearing walls, floos, finishes, baths and kitchens.Details
voluntary foundation strengthening within building envelope per plan. soft demolition of non-bearing walls, floos, finishes, baths and kitchens. | $100,000 |
| May 31, 2016 | Completed final sign-off Mar 2019 | 1613 Church St | remove cabinets, interior doors, trim , old carpet, closet shelves, bath vanities, broken lights, stoves, all towel bars and coat hooks. no remodelling under this permitDetails
remove cabinets, interior doors, trim , old carpet, closet shelves, bath vanities, broken lights, stoves, all towel bars and coat hooks. no remodelling under this permit | $7,000 |