Back to kitchen remodel contractors
Sperow Construction/Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to Feb 2020
- Last 24 months
- 0 permits filed
11 permits since 2000: 8 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 101 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 20, 2020 | Never finaled issued Feb 2020, no final | 148 Valley St | replacement of kitchen cabinets. new lighting at ceilingDetails
replacement of kitchen cabinets. new lighting at ceiling | $25,000 |
| May 1, 2012 | Completed final sign-off Jun 2012 | 2378 22nd Av | remodel kitchen - new cabients, dishwasher, silistone ocuntertop, stainless steel sink & garbage disposal. install new electric cirucits & outlets to code. remove necessary plaster board for electric outlets, plbg, replace with sheetrock, taping & paint, install fluorescent lighting.Details
remodel kitchen - new cabients, dishwasher, silistone ocuntertop, stainless steel sink & garbage disposal. install new electric cirucits & outlets to code. remove necessary plaster board for electric outlets, plbg, replace with sheetrock, taping & paint, install fluorescent lighting. | $25,200 |
| Nov 9, 2009 | Completed final sign-off Feb 2010 | 165 Wool St | kitchen remodel. replace 13 cabinets, formica counter, granite counter tops. sink, faucet, appliances, exhaust hod. upgrade electric outlets to gfi. install 300 sq ft. ceramic floor tile. paint kitchen.Details
kitchen remodel. replace 13 cabinets, formica counter, granite counter tops. sink, faucet, appliances, exhaust hod. upgrade electric outlets to gfi. install 300 sq ft. ceramic floor tile. paint kitchen. | $15,275 |
| May 16, 2008 | Completed final sign-off Aug 2008 | 309 Madison St | complete remodel of (e) 10'x16' kitchen, replace with new cabinets (15), sink, faucet, dishwasher, stove, microhood combo, install granite countertops, recessed ceiling lights, under cabinet lighting, hardwood flooring.Details
complete remodel of (e) 10'x16' kitchen, replace with new cabinets (15), sink, faucet, dishwasher, stove, microhood combo, install granite countertops, recessed ceiling lights, under cabinet lighting, hardwood flooring. | $27,500 |
| Aug 17, 2006 | Completed final sign-off Jan 2007 | 1304 Hyde St | replace + install new kitchen cabinets (5) formica counter top, stainless steel sink faucet + new water heater . provide straps, install new electric service for all 6 units (apts) all work to be done in 1310 hyde st. in service alley. no structural work.Details
replace + install new kitchen cabinets (5) formica counter top, stainless steel sink faucet + new water heater . provide straps, install new electric service for all 6 units (apts) all work to be done in 1310 hyde st. in service alley. no structural work. | $15,000 |
| Sep 15, 2004 | Completed final sign-off Mar 2007 | 146 Valley St | build enclosed deck open to kitchen area east side of bldng., add new window in dining roomDetails
build enclosed deck open to kitchen area east side of bldng., add new window in dining room | $70,000 |