Sperow Construction/Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to Feb 2020
- Last 24 months
- 0 permits filed
11 permits since 2000: 8 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 116 days from filing to permit and 360 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 16, 2005 | Completed final sign-off Jun 2005 | 165 Wool St | replace all dry rotted lumber on deck in back yard (existing deck) less than 50 percent of the strutDetails
replace all dry rotted lumber on deck in back yard (existing deck) less than 50 percent of the strut | $3,000 |
| Sep 15, 2004 | Completed final sign-off Mar 2007 | 146 Valley St | build enclosed deck open to kitchen area east side of bldng., add new window in dining roomDetails
build enclosed deck open to kitchen area east side of bldng., add new window in dining room | $70,000 |