Permit GraphShortlistSan Francisco building permits since 2000

Speedy Construction/See Note:

Contractor license
783415
State license record
Based in
San Francisco
On San Francisco permits
Oct 2001 to May 2010
Last 24 months
0 permits filed

70 permits since 2000: 46 completed, 10 never finaled, 14 expired or cancelled.

Of the 10 never-finaled permits, 10 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllDeck 4Stairs 7Kitchen remodel 10Bathroom remodel 16

7 stairs permits: 4 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 84 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jun 12, 2009Completed
final sign-off Jul 2009
254 Caselli Avrepair & replace front stairs.
Details
Permit
200906120354
Status
complete
Filed
Jun 12, 2009
Permit issued
Jun 15, 2009
Final sign-off
Jul 23, 2009
Declared cost
$15,000
Address
254 Caselli Av

repair & replace front stairs.

Open the permit page

$15,000
Oct 3, 2008Completed
final sign-off Mar 2009
263 Missouri Stinstall skylight within envelope of bldg over kitchen, remove wall between kitchen and living, raise headroom over interior stairway. add posts and footings.
Details
Permit
200810033416
Status
complete
Filed
Oct 3, 2008
Permit issued
Oct 10, 2008
Final sign-off
Mar 18, 2009
Declared cost
$7,000
Address
263 Missouri St

install skylight within envelope of bldg over kitchen, remove wall between kitchen and living, raise headroom over interior stairway. add posts and footings.

Open the permit page

$7,000
Sep 17, 2008Completed
final sign-off Nov 2008
34 Fairfield Wystair and wall repair. revision to app#200806104058. existing stair.
Details
Permit
200809171841
Status
complete
Filed
Sep 17, 2008
Permit issued
Sep 17, 2008
Final sign-off
Nov 19, 2008
Address
34 Fairfield Wy

stair and wall repair. revision to app#200806104058. existing stair.

Open the permit page

Jul 25, 2007Expired or cancelled
withdrawn Sep 2009
2232 18th Avlegalize addition in the rear building and new deck and stair. site permit only
Details
Permit
200707257686
Status
withdrawn
Filed
Jul 25, 2007
Declared cost
$18,000
Address
2232 18th Av

legalize addition in the rear building and new deck and stair. site permit only

Open the permit page

$18,000
Mar 14, 2006Expired or cancelled
expired Feb 2007
2002 Bush Streplace (e) fireplaces (2) and flues in same locations, replace (e) walls & ceilings throughout unit, insulation, sheetrock, revising skylight in bathroom, rev. to basement stairs, utility room and closets layout. revise window size and layout 2nd floor
Details
Permit
200603146673
Status
expired
Filed
Mar 14, 2006
Permit issued
Mar 14, 2006
Declared cost
$4,000
Address
2002 Bush St

replace (e) fireplaces (2) and flues in same locations, replace (e) walls & ceilings throughout unit, insulation, sheetrock, revising skylight in bathroom, rev. to basement stairs, utility room and closets layout. revise window size and layout 2nd floor

Open the permit page

$4,000
Nov 30, 2005Completed
final sign-off Mar 2006
2002 Bush Stlower slab, replace brick foundation, frame opening for future stairs to basement, retaining walls & adding shear walls throughout the building. (permit for remodeling of upper 2 floors was issued before pa# 2005/11/07/7599.
Details
Permit
200511309218
Status
complete
Filed
Nov 30, 2005
Permit issued
Nov 30, 2005
Final sign-off
Mar 15, 2006
Declared cost
$30,000
Address
2002 Bush St

lower slab, replace brick foundation, frame opening for future stairs to basement, retaining walls & adding shear walls throughout the building. (permit for remodeling of upper 2 floors was issued before pa# 2005/11/07/7599.

Open the permit page

$30,000
Apr 26, 2004Never finaled
issued Apr 2004, no final
75 Fair Oaks Strepairing rear stairs/less than 50% of structure
Details
Permit
200404262259
Status
issued
Filed
Apr 26, 2004
Permit issued
Apr 26, 2004
Declared cost
$3,800
Address
75 Fair Oaks St

repairing rear stairs/less than 50% of structure

Open the permit page

$3,800