Back to kitchen remodel contractors
South Hill Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2009 to May 2025
- Last 24 months
- 1 permit filed
23 permits since 2000: 16 completed, 2 in progress, 5 never finaled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 7 days from filing to permit and 150 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 24, 2015 | Completed final sign-off Jun 2016 | 3333 Scott St | renovate existing ground floor unit to relocate kitchen and expand restroom; maher n/aDetails
renovate existing ground floor unit to relocate kitchen and expand restroom; maher n/a | $65,000 |
| May 19, 2015 | Completed final sign-off Sep 2015 | 142 Granville Wy | kitchen remodel: replace counter, cabinet, sink, floor finish. gypsum board, electricla outlet and lights to led (hf) lightsDetails
kitchen remodel: replace counter, cabinet, sink, floor finish. gypsum board, electricla outlet and lights to led (hf) lights | $10,000 |
| Oct 30, 2014 | Completed final sign-off Feb 2015 | 52 Heather Av | kitchen remodel: remove cabinet, drywall, flooring and replace with new. bathroom remodel: remove old tub, toilet, flooring, drywall and replace with new whoer, toilet, floorings and lights. flip location of new shower with vanity location.Details
kitchen remodel: remove cabinet, drywall, flooring and replace with new. bathroom remodel: remove old tub, toilet, flooring, drywall and replace with new whoer, toilet, floorings and lights. flip location of new shower with vanity location. | $15,000 |
| Mar 31, 2011 | Completed final sign-off May 2011 | 1785 09th Av | install one new electrical subpanel. replace 18 windows (max u value=o.4) not visable from the street (2nd and 3rd floors). kitchen: remove and install new cabinets and tiles. bathroom: remove and install new sink, faucets, toilet and tiles.Details
install one new electrical subpanel. replace 18 windows (max u value=o.4) not visable from the street (2nd and 3rd floors). kitchen: remove and install new cabinets and tiles. bathroom: remove and install new sink, faucets, toilet and tiles. | $25,000 |
| Oct 19, 2009 | Completed final sign-off Jul 2011 | 1293 Pacific Av | remodel 3rd floor kitchen, open up 1 interior wall. replace some lights, voluntary structural upgrade.replace 10 windows not visible frm the street.Details
remodel 3rd floor kitchen, open up 1 interior wall. replace some lights, voluntary structural upgrade.replace 10 windows not visible frm the street. | $20,000 |
| Oct 19, 2009 | Completed final sign-off Jun 2010 | 1291 Pacific Av | remodel 2nd floor kitchen, open up 1 interior wall. replace some lights, voluntary structural upgrade.replace 10 windows not visible from the street.Details
remodel 2nd floor kitchen, open up 1 interior wall. replace some lights, voluntary structural upgrade.replace 10 windows not visible from the street. | $20,000 |
| Sep 11, 2009 | Completed final sign-off Feb 2010 | 2408 Taraval St | comply with nov# 200993120 - legalize rooms down & remove kitchen, all located on garage level.Details
comply with nov# 200993120 - legalize rooms down & remove kitchen, all located on garage level. | $10,000 |