Back to bathroom remodel contractors
South Hill Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2009 to May 2025
- Last 24 months
- 1 permit filed
23 permits since 2000: 16 completed, 2 in progress, 5 never finaled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 7 completed, 1 never finaled. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 30, 2014 | Completed final sign-off Feb 2015 | 52 Heather Av | kitchen remodel: remove cabinet, drywall, flooring and replace with new. bathroom remodel: remove old tub, toilet, flooring, drywall and replace with new whoer, toilet, floorings and lights. flip location of new shower with vanity location.Details
kitchen remodel: remove cabinet, drywall, flooring and replace with new. bathroom remodel: remove old tub, toilet, flooring, drywall and replace with new whoer, toilet, floorings and lights. flip location of new shower with vanity location. | $15,000 |
| May 5, 2014 | Never finaled issued May 2014, no final | 2700 Noriega St | remodel downstair bathroom & replace shower , vanity, exhaust fan, and redo tiles.Details
remodel downstair bathroom & replace shower , vanity, exhaust fan, and redo tiles. | $10,000 |
| Nov 4, 2011 | Completed final sign-off Feb 2012 | 479 18th Av | work to be done at 481 18th ave.: remodel full and half bathroom and remove all fixture, drywall, tiles, and lights. replace with new fixture, drywall, tiles and lights. replace one window in half bath not visible from street. install new sub panel. all (n) lighting must comply with cec 150 (k) 10.Details
work to be done at 481 18th ave.: remodel full and half bathroom and remove all fixture, drywall, tiles, and lights. replace with new fixture, drywall, tiles and lights. replace one window in half bath not visible from street. install new sub panel. all (n) lighting must comply with cec 150 (k) 10. | $10,500 |
| Apr 18, 2011 | Completed final sign-off Aug 2011 | 1785 09th Av | construct 2 bedrooms, laundy room, full bathroom. all work on ground floorDetails
construct 2 bedrooms, laundy room, full bathroom. all work on ground floor | $32,000 |
| Mar 31, 2011 | Completed final sign-off May 2011 | 1785 09th Av | install one new electrical subpanel. replace 18 windows (max u value=o.4) not visable from the street (2nd and 3rd floors). kitchen: remove and install new cabinets and tiles. bathroom: remove and install new sink, faucets, toilet and tiles.Details
install one new electrical subpanel. replace 18 windows (max u value=o.4) not visable from the street (2nd and 3rd floors). kitchen: remove and install new cabinets and tiles. bathroom: remove and install new sink, faucets, toilet and tiles. | $25,000 |
| May 17, 2010 | Completed final sign-off Feb 2011 | 46 Baltimore Wy | add 2 bedrooms,1 full bath and laundry and storage rm at 1st fl. change configuration of (e) bathrm: replace (e) 4 windows in kind- 2 facing rr yd, 2 facing so.side yd.replace some wd posts n beams w/bearing walls &(n)footing.change forced air heating system to radiant fl heating on 2nd n 1st fl bdrDetails
add 2 bedrooms,1 full bath and laundry and storage rm at 1st fl. change configuration of (e) bathrm: replace (e) 4 windows in kind- 2 facing rr yd, 2 facing so.side yd.replace some wd posts n beams w/bearing walls &(n)footing.change forced air heating system to radiant fl heating on 2nd n 1st fl bdr | $43,000 |
| May 10, 2010 | Completed final sign-off Oct 2010 | 1300 39th Av | add 1 bedroom, 1 full bath, family room at gr floor & replace existing 3 windows in kind. (1 facing the street and 2 windows at the rear)Details
add 1 bedroom, 1 full bath, family room at gr floor & replace existing 3 windows in kind. (1 facing the street and 2 windows at the rear) | $36,000 |
| Feb 9, 2010 | Completed final sign-off May 2010 | 2030 31st Av | add 1 office, 1 bath & 1 family room at existing ground floor; replace exisitng 2 windows at the rear in kind.Details
add 1 office, 1 bath & 1 family room at existing ground floor; replace exisitng 2 windows at the rear in kind. | $19,000 |