Snyder Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Jan 2026
- Last 24 months
- 1 permit filed
18 permits since 2000: 17 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 145 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 14, 2015 | Completed final sign-off Oct 2016 | 262 15th Av | renovate existing 1st fl habitable space including existing playroom, bath, bedroom, inteior stair, new bar area. new exterior door and window at 1st fl rear facade. new recessed exterior patio and steps to grade at rear yard. no wet bar.Details
renovate existing 1st fl habitable space including existing playroom, bath, bedroom, inteior stair, new bar area. new exterior door and window at 1st fl rear facade. new recessed exterior patio and steps to grade at rear yard. no wet bar. | $50,000 |
| Dec 22, 2014 | Completed final sign-off Dec 2015 | 2757 Green St | exterior stair and landing renovation; new stair structure and new stair treads and risers. new landing finish material, structure to remain. new treads and risers and landing finish material to be precast concrete tiles in lieu of painted wood.Details
exterior stair and landing renovation; new stair structure and new stair treads and risers. new landing finish material, structure to remain. new treads and risers and landing finish material to be precast concrete tiles in lieu of painted wood. | $8,000 |
| Nov 19, 2014 | Completed final sign-off Dec 2017 | 1426 46th Av | 725 sq ft 2-story rear yard addition. remodel kitchen & bathroom on upper level, (2)(n) bedrooms & (1) bathroom on lower level. (n) interior staircase.Details
725 sq ft 2-story rear yard addition. remodel kitchen & bathroom on upper level, (2)(n) bedrooms & (1) bathroom on lower level. (n) interior staircase. | $145,000 |
| Aug 23, 2002 | Completed final sign-off Sep 2002 | 242 Edna St | rev to 200106181809;re-oriented stair, & lower to grnd,delete trellisDetails
rev to 200106181809;re-oriented stair, & lower to grnd,delete trellis |