Back to bathroom remodel contractors
Snyder Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Jan 2026
- Last 24 months
- 1 permit filed
18 permits since 2000: 17 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 0 days from filing to permit and 260 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 13, 2026 | Completed final sign-off Aug 2026 | 15 Rossmoor Dr | bathroom remodel. relocate toilet.Details
bathroom remodel. relocate toilet. | $20,000 |
| Jan 5, 2023 | Completed final sign-off Jun 2023 | 262 15th Av | interior bathroom remodel. no plans.Details
interior bathroom remodel. no plans. | $30,000 |
| Feb 5, 2020 | Completed final sign-off Oct 2020 | 262 15th Av | bathroom remodel. new finishes, new fixtures in existing locations. no structural work. approx 5'x12'Details
bathroom remodel. new finishes, new fixtures in existing locations. no structural work. approx 5'x12' | $20,000 |
| Jan 28, 2020 | Completed final sign-off Aug 2021 | 850 35th Av | 1 bathroom remodel. fixtures to remain in place. no alteration to walls/window/doors.Details
1 bathroom remodel. fixtures to remain in place. no alteration to walls/window/doors. | $15,000 |
| Dec 14, 2015 | Completed final sign-off Oct 2016 | 262 15th Av | renovate existing 1st fl habitable space including existing playroom, bath, bedroom, inteior stair, new bar area. new exterior door and window at 1st fl rear facade. new recessed exterior patio and steps to grade at rear yard. no wet bar.Details
renovate existing 1st fl habitable space including existing playroom, bath, bedroom, inteior stair, new bar area. new exterior door and window at 1st fl rear facade. new recessed exterior patio and steps to grade at rear yard. no wet bar. | $50,000 |
| Nov 19, 2014 | Completed final sign-off Dec 2017 | 1426 46th Av | 725 sq ft 2-story rear yard addition. remodel kitchen & bathroom on upper level, (2)(n) bedrooms & (1) bathroom on lower level. (n) interior staircase.Details
725 sq ft 2-story rear yard addition. remodel kitchen & bathroom on upper level, (2)(n) bedrooms & (1) bathroom on lower level. (n) interior staircase. | $145,000 |
| Jun 18, 2001 | Completed final sign-off Sep 2002 | 242 Edna St | replace (e) sunroom, remodel kitchen & bath, add bedroom, bath, office downstairsDetails
replace (e) sunroom, remodel kitchen & bath, add bedroom, bath, office downstairs | $50,000 |