Back to kitchen remodel contractors
Smith Builders Group Inc
- Based in
- Tarzana
- On San Francisco permits
- Mar 2021 to Mar 2022
- Last 24 months
- 0 permits filed
17 permits since 2000: 12 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 167 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2021 | Never finaled issued Aug 2021, no final | 116 Leroy Pl | kitchen remodel in-kind, upgrade electrical/plumbing to code, remove non-supporting wall; bathroom remodel, add tiolet, upgrade electrical fixture & outside wall plumbing.Details
kitchen remodel in-kind, upgrade electrical/plumbing to code, remove non-supporting wall; bathroom remodel, add tiolet, upgrade electrical fixture & outside wall plumbing. | $35,000 |
| Jul 7, 2021 | Completed final sign-off Nov 2021 | 1433 Balboa St | one kitchen remodel like for like. upgrade outlets to gfci. upgrade plumbing by code.Details
one kitchen remodel like for like. upgrade outlets to gfci. upgrade plumbing by code. | $18,000 |
| Jun 17, 2021 | Completed final sign-off Aug 2022 | 2018 46th Av | 2nd fl: kitchen and bathroom remodel. removing a wall. relocateing washer/dryer. 1st fl: remodel (e) bath, add a closet to (e) bedroom.Details
2nd fl: kitchen and bathroom remodel. removing a wall. relocateing washer/dryer. 1st fl: remodel (e) bath, add a closet to (e) bedroom. | $45,000 |
| Mar 16, 2021 | Completed final sign-off Oct 2021 | 246 Foote Av | kitchen remodel lke for like, replace outlets and gfg by code, replace sink and cabinets in kind.Details
kitchen remodel lke for like, replace outlets and gfg by code, replace sink and cabinets in kind. | $20,000 |
| Mar 16, 2021 | Completed final sign-off Jun 2021 | 74 Bradford St | kitchen remodel like for like,replace outlet adn gfci by code, replace sink and cabinets.Details
kitchen remodel like for like,replace outlet adn gfci by code, replace sink and cabinets. | $20,000 |