Smith Builders Group Inc
- Based in
- Tarzana
- On San Francisco permits
- Mar 2021 to Mar 2022
- Last 24 months
- 0 permits filed
17 permits since 2000: 12 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 15, 2022 | Expired or cancelled cancelled Jan 2026 | 116 Leroy Pl | revision to permit: 202107275172, removing a non-structual wallDetails
revision to permit: 202107275172, removing a non-structual wall | $2,500 |
| Jan 13, 2022 | Never finaled issued Jan 2022, no final | 270 Eureka St | bathroom remodel, like for like.Details
bathroom remodel, like for like. | $10,000 |
| Oct 27, 2021 | Never finaled issued Nov 2021, no final | 1274 24th Av | renovate an existing garage, driveway, planter, stairway to 2nd floor. relocate electrical meter.Details
renovate an existing garage, driveway, planter, stairway to 2nd floor. relocate electrical meter. | $17,000 |
| Oct 26, 2021 | Completed final sign-off Mar 2022 | 730 09th Av | bathroom remodel & powder room,partial renovation. close existing door opening to bathroom inside the bedroom,open a new door opening to bath in hallway.provide a sink into a water closet by taking 65 sqft of the mud room.Details
bathroom remodel & powder room,partial renovation. close existing door opening to bathroom inside the bedroom,open a new door opening to bath in hallway.provide a sink into a water closet by taking 65 sqft of the mud room. | $30,000 |
| Aug 19, 2021 | Completed final sign-off Oct 2021 | 1330 24th Av | bathroom remodel. like to like.Details
bathroom remodel. like to like. | $15,000 |
| Jul 29, 2021 | Completed final sign-off Oct 2021 | 1580 Treat Av | 1st floor bathroom remodel.Details
1st floor bathroom remodel. | $30,000 |
| Jul 27, 2021 | Never finaled issued Aug 2021, no final | 116 Leroy Pl | kitchen remodel in-kind, upgrade electrical/plumbing to code, remove non-supporting wall; bathroom remodel, add tiolet, upgrade electrical fixture & outside wall plumbing.Details
kitchen remodel in-kind, upgrade electrical/plumbing to code, remove non-supporting wall; bathroom remodel, add tiolet, upgrade electrical fixture & outside wall plumbing. | $35,000 |
| Jul 7, 2021 | Completed final sign-off Nov 2021 | 1433 Balboa St | one kitchen remodel like for like. upgrade outlets to gfci. upgrade plumbing by code.Details
one kitchen remodel like for like. upgrade outlets to gfci. upgrade plumbing by code. | $18,000 |
| Jun 25, 2021 | Completed final sign-off Oct 2021 | 419 Garfield St | replace corroded beam and stud. replace non-bearing beam 6x10 in kind. replace header beam in kind.Details
replace corroded beam and stud. replace non-bearing beam 6x10 in kind. replace header beam in kind. | $15,000 |
| Jun 17, 2021 | Completed final sign-off Aug 2022 | 2018 46th Av | 2nd fl: kitchen and bathroom remodel. removing a wall. relocateing washer/dryer. 1st fl: remodel (e) bath, add a closet to (e) bedroom.Details
2nd fl: kitchen and bathroom remodel. removing a wall. relocateing washer/dryer. 1st fl: remodel (e) bath, add a closet to (e) bedroom. | $45,000 |
| Apr 16, 2021 | Completed final sign-off Dec 2021 | 451 Kansas St | bathroom remodeling liek to like; one upgarde electrical, gfci by code; replace vanity & sink. new lighting hall comply w/ cec 150.0 (k)5. no new wall and no existing all relocation.Details
bathroom remodeling liek to like; one upgarde electrical, gfci by code; replace vanity & sink. new lighting hall comply w/ cec 150.0 (k)5. no new wall and no existing all relocation. | $15,000 |
| Apr 15, 2021 | Completed final sign-off Jun 2021 | 142 Clearfield Dr | bathroom remodeling like for like; upgrade electrical to gfci bu code; replace vanity and sink; no structural; alterations to layout/ wallsDetails
bathroom remodeling like for like; upgrade electrical to gfci bu code; replace vanity and sink; no structural; alterations to layout/ walls | $15,000 |
| Apr 9, 2021 | Completed final sign-off Jun 2021 | 74 Bradford St | 1 bathroom remodeling like to like. replace outlet gfci by code. replace plumbing by code. no relocation of plumbing fixtures. no new or existing wall relocation.lighting to comply with cec 150.0(k) 3,5 high efficacy.Details
1 bathroom remodeling like to like. replace outlet gfci by code. replace plumbing by code. no relocation of plumbing fixtures. no new or existing wall relocation.lighting to comply with cec 150.0(k) 3,5 high efficacy. | $12,000 |
| Apr 8, 2021 | Completed final sign-off Aug 2021 | 203 Paris St | bathroom remodeling like to like. replace outlet & 9 fci by code. replace plumbing by code.Details
bathroom remodeling like to like. replace outlet & 9 fci by code. replace plumbing by code. | $15,000 |
| Apr 8, 2021 | Expired or cancelled cancelled Dec 2021 | 338 Spear St | kithcen & 3 bathrooms remodeling to like to like. replace outlet & 9 fci by code. upgrade plumbing by code.Details
kithcen & 3 bathrooms remodeling to like to like. replace outlet & 9 fci by code. upgrade plumbing by code. | $75,000 |
| Mar 16, 2021 | Completed final sign-off Jun 2021 | 74 Bradford St | kitchen remodel like for like,replace outlet adn gfci by code, replace sink and cabinets.Details
kitchen remodel like for like,replace outlet adn gfci by code, replace sink and cabinets. | $20,000 |
| Mar 16, 2021 | Completed final sign-off Oct 2021 | 246 Foote Av | kitchen remodel lke for like, replace outlets and gfg by code, replace sink and cabinets in kind.Details
kitchen remodel lke for like, replace outlets and gfg by code, replace sink and cabinets in kind. | $20,000 |