Skyland Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Sep 2023
- Last 24 months
- 0 permits filed
36 permits since 2000: 29 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 4 completed, 1 never finaled. Typically 6 days from filing to permit and 318 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 25, 2016 | Completed final sign-off Jul 2017 | 1526 Vallejo St | 3rd floor: to comply with nov 201540081: remodel (e) kitchen enlarge kitchen area by removing non structural wall. address back stair blistered dryrot, w/h improperly strapped, leaks in roof and windows. merge (e) bahtroom & toilet to 1 nathroom. install new high efficency led lights around houseDetails
3rd floor: to comply with nov 201540081: remodel (e) kitchen enlarge kitchen area by removing non structural wall. address back stair blistered dryrot, w/h improperly strapped, leaks in roof and windows. merge (e) bahtroom & toilet to 1 nathroom. install new high efficency led lights around house | $35,000 |
| Jun 25, 2015 | Completed final sign-off Oct 2015 | 930 Clement St | dry rot repair rear exit stair less than 50%.Details
dry rot repair rear exit stair less than 50%. | $10,000 |
| May 28, 2015 | Completed final sign-off Oct 2019 | 1526 Vallejo St | front bld to comply w/ nov:201540211-remodel (e)2 bathroom, repair: plaster at interior & back stair : nov:201540081-repair:weather proofing at roof, dry rot at rear stairs <50% front stairs, roof access, elec outlet, damaged walls. add w/h strapping. replace floor coverings. repair refridgeratorDetails
front bld to comply w/ nov:201540211-remodel (e)2 bathroom, repair: plaster at interior & back stair : nov:201540081-repair:weather proofing at roof, dry rot at rear stairs <50% front stairs, roof access, elec outlet, damaged walls. add w/h strapping. replace floor coverings. repair refridgerator | $15,000 |
| Apr 2, 2010 | Never finaled issued Apr 2010, no final | 1990 45th Av | (1)adding one bedroom, one bathroom, one family room & laundry room per plan, on ground floor. (2) add a new rear stairwayDetails
(1)adding one bedroom, one bathroom, one family room & laundry room per plan, on ground floor. (2) add a new rear stairway | $38,000 |
| Dec 11, 2008 | Completed final sign-off Jul 2009 | 1397 Vallejo St | extg exterior winder staircase to be replaced with new winder in-kind staircase. stairways located in lightwell not visible from the street.Details
extg exterior winder staircase to be replaced with new winder in-kind staircase. stairways located in lightwell not visible from the street. | $5,000 |