Back to bathroom remodel contractors
Skyland Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Sep 2023
- Last 24 months
- 0 permits filed
36 permits since 2000: 29 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 14 completed, 2 never finaled, 1 expired or cancelled. Typically 7 days from filing to permit and 218 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2021 | Never finaled issued Apr 2022, no final | 437 Gold Mine Dr | remodel extg s.f.d: interior work; reconfigure extg bathroom and closet on 1st floor, remodel extg kitchen and 1/2 bathroom on 2nd fl. and remodel extg bathroom and master bathroom on 3rd fl; exterior work; replace all extg windows & sliding patio. doors in kind.Details
remodel extg s.f.d: interior work; reconfigure extg bathroom and closet on 1st floor, remodel extg kitchen and 1/2 bathroom on 2nd fl. and remodel extg bathroom and master bathroom on 3rd fl; exterior work; replace all extg windows & sliding patio. doors in kind. | $115,000 |
| Sep 6, 2018 | Completed final sign-off Aug 2019 | 185 San Rafael Wy | convert portion of existingg garage to bedroom and convert extg storage to one bedroom and one full bath. add on full bathroom at extg garage. all work on ground floor.Details
convert portion of existingg garage to bedroom and convert extg storage to one bedroom and one full bath. add on full bathroom at extg garage. all work on ground floor. | $50,000 |
| Aug 21, 2018 | Completed final sign-off Jan 2020 | 131 Collins St | 1st fl: turn (e) entertainment room into (2) bedrooms & one full bath. relocte (e) bath & wet bar. add one media room. reconfigure interior layout. add one full bath & one guest bedroom.Details
1st fl: turn (e) entertainment room into (2) bedrooms & one full bath. relocte (e) bath & wet bar. add one media room. reconfigure interior layout. add one full bath & one guest bedroom. | $60,000 |
| Aug 21, 2017 | Completed final sign-off Aug 2019 | 1771 17th Av | remodel 2nd floor kitchen area & (e) bathroom area. add a sink in the (e) half bath, add ceiling recess light. infill (e) lightwell at ground floor & match lighwell with neighbor side @ 2nd floor. relocate one bathroom & install one bathroom @ ground floor. new two bedrms and media rmDetails
remodel 2nd floor kitchen area & (e) bathroom area. add a sink in the (e) half bath, add ceiling recess light. infill (e) lightwell at ground floor & match lighwell with neighbor side @ 2nd floor. relocate one bathroom & install one bathroom @ ground floor. new two bedrms and media rm | $85,000 |
| Aug 1, 2017 | Completed final sign-off Jan 2020 | 2701 Jackson St | unit 3 - kitchen remodel; unit 1 - bedroom, kitchen and bathroom remodelDetails
unit 3 - kitchen remodel; unit 1 - bedroom, kitchen and bathroom remodel | $15,000 |
| Jul 29, 2016 | Completed final sign-off Jul 2018 | 1530 Vallejo St | remodel (e) kitchen & removing non structural wall. convert (e) storage to a bathroom. merge (e) bathroom & (e) toilet to 1 bathroom. install new high efficancy led recessed lighting around the unitDetails
remodel (e) kitchen & removing non structural wall. convert (e) storage to a bathroom. merge (e) bathroom & (e) toilet to 1 bathroom. install new high efficancy led recessed lighting around the unit | $35,000 |
| Jun 24, 2016 | Expired or cancelled expired Nov 2018 | 185 San Rafael Wy | remodel (e) kitchen & two bathrooms. add closet to (e) bedroom #1 & 2. remove 1 window at bedroom #1 - not visible from street. install led high eff. 1 recess ceiling lighting to 2nd floorDetails
remodel (e) kitchen & two bathrooms. add closet to (e) bedroom #1 & 2. remove 1 window at bedroom #1 - not visible from street. install led high eff. 1 recess ceiling lighting to 2nd floor | $35,000 |
| May 28, 2015 | Completed final sign-off Oct 2019 | 1526 Vallejo St | front bld to comply w/ nov:201540211-remodel (e)2 bathroom, repair: plaster at interior & back stair : nov:201540081-repair:weather proofing at roof, dry rot at rear stairs <50% front stairs, roof access, elec outlet, damaged walls. add w/h strapping. replace floor coverings. repair refridgeratorDetails
front bld to comply w/ nov:201540211-remodel (e)2 bathroom, repair: plaster at interior & back stair : nov:201540081-repair:weather proofing at roof, dry rot at rear stairs <50% front stairs, roof access, elec outlet, damaged walls. add w/h strapping. replace floor coverings. repair refridgerator | $15,000 |
| May 28, 2015 | Completed final sign-off Jul 2015 | 400 Monterey Bl | unit #9 & #10 - repair water damage @ heater room, retile both bathrooms floor, reinstall toilet & sink. unit #10 - reinstall kitchen base, cabinet & kitchen floor tile. relocate both electrical panel form closet, replace dyrwall cut out from water damage in both units & water heater/laundry room.Details
unit #9 & #10 - repair water damage @ heater room, retile both bathrooms floor, reinstall toilet & sink. unit #10 - reinstall kitchen base, cabinet & kitchen floor tile. relocate both electrical panel form closet, replace dyrwall cut out from water damage in both units & water heater/laundry room. | $15,000 |
| Jun 23, 2014 | Completed final sign-off Mar 2015 | 2022 Judah St | add washer/dryer stacked room in kitchen area, remodel kitchen & bathroom, replace sheetrock, replace lighting.Details
add washer/dryer stacked room in kitchen area, remodel kitchen & bathroom, replace sheetrock, replace lighting. | $40,000 |
| Jun 27, 2013 | Completed final sign-off Aug 2013 | 2146 30th Av | legalize extg 1st floor to comply with complaint #201398451 for remodel bath room in extg ground floor; new deck on 2nd floor;remove kitchen at ground floor; per plans.Details
legalize extg 1st floor to comply with complaint #201398451 for remodel bath room in extg ground floor; new deck on 2nd floor;remove kitchen at ground floor; per plans. | $10,000 |
| Jul 3, 2012 | Completed final sign-off Mar 2013 | 27 Bonita St | (rear building) remodel kitchen & bathroom. remove interior plaster to install r-13 insulation.Details
(rear building) remodel kitchen & bathroom. remove interior plaster to install r-13 insulation. | $65,000 |
| Feb 11, 2011 | Completed final sign-off Sep 2011 | 1528 Vallejo St | 1)remodel kitchen and replace bathroom fixtures on 2nd floor.2) remove all interior wall plaster, install wall insullation at exterior walls. replace plaster with 5/8 gyp bd. 3)replace 10 windows not visible from the street.4) install new lightings.Details
1)remodel kitchen and replace bathroom fixtures on 2nd floor.2) remove all interior wall plaster, install wall insullation at exterior walls. replace plaster with 5/8 gyp bd. 3)replace 10 windows not visible from the street.4) install new lightings. | $38,000 |
| Sep 21, 2010 | Completed final sign-off Dec 2010 | 2167 32nd Av | add 2 bedrooms, 1 family room, 1 storage & 2 bathroom on 1st floor (garage). enclose area below sunroom on ground floorDetails
add 2 bedrooms, 1 family room, 1 storage & 2 bathroom on 1st floor (garage). enclose area below sunroom on ground floor | $50,000 |
| Apr 2, 2010 | Never finaled issued Apr 2010, no final | 1990 45th Av | (1)adding one bedroom, one bathroom, one family room & laundry room per plan, on ground floor. (2) add a new rear stairwayDetails
(1)adding one bedroom, one bathroom, one family room & laundry room per plan, on ground floor. (2) add a new rear stairway | $38,000 |
| Jul 7, 2008 | Completed final sign-off Dec 2008 | 1454 22nd Av | kitchen remodel. remove and replace cabinets and fixtures in same location. update electrical and plumbing to code. install recessed lights, one bath remodel same location. no structural work. 50% of wattage of kitchen lighting to be flourescent. bathroom lighting to be flourescent or onDetails
kitchen remodel. remove and replace cabinets and fixtures in same location. update electrical and plumbing to code. install recessed lights, one bath remodel same location. no structural work. 50% of wattage of kitchen lighting to be flourescent. bathroom lighting to be flourescent or on | $10,000 |
| Dec 27, 2007 | Completed final sign-off Jun 2008 | 1875 34th Av | interior renovation of 2nd floor. addition of one fam.room, 2 bedrooms, one full bath at ground floor. installation of new furnace, replacement of water heater and upgrade of all mech, piping, duct work and plumbing. upgrade of circuit panel, lighting, elec. wiring, switches and receptacles.Details
interior renovation of 2nd floor. addition of one fam.room, 2 bedrooms, one full bath at ground floor. installation of new furnace, replacement of water heater and upgrade of all mech, piping, duct work and plumbing. upgrade of circuit panel, lighting, elec. wiring, switches and receptacles. | $50,000 |