Sky Trust Builder
- Based in
- Hercules
- On San Francisco permits
- Dec 2019 to Apr 2026
- Last 24 months
- 4 permits filed
18 permits since 2000: 10 completed, 7 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 2 completed, 3 in progress. Typically 193 days from filing to permit and 454 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 14, 2025 | In progress issued Jun 2025 | 154 Pixley St | interior remodel for unit #1 on 1st floor: remodel kitchen, add a interior stair connect to new living space in basement. on basement floor: add a study room, a media room, a family room, and a bathroom.Details
interior remodel for unit #1 on 1st floor: remodel kitchen, add a interior stair connect to new living space in basement. on basement floor: add a study room, a media room, a family room, and a bathroom. | $85,000 |
| Oct 29, 2024 | Completed final sign-off Aug 2026 | 304 Gold Mine Dr | new cantilevered upper deck to replace (e) upper deck replace door that connects to upper deck. (n) windows in (e) location on front facade. (n) hardie plank siding on front, rear & side facades of resdience. (n) exterior stairs from (e) lower deck to rear yard (n) quardril and (e) lower deck.Details
new cantilevered upper deck to replace (e) upper deck replace door that connects to upper deck. (n) windows in (e) location on front facade. (n) hardie plank siding on front, rear & side facades of resdience. (n) exterior stairs from (e) lower deck to rear yard (n) quardril and (e) lower deck. | $35,000 |
| Jun 4, 2024 | In progress issued Mar 2025 | 223 Richland Av | street facing window replacement and side yard stair improvement.Details
street facing window replacement and side yard stair improvement. | $25,000 |
| Jan 12, 2024 | In progress issued Jul 2024 | 223 Richland Av | structural improvements, new interior stair, interior alterationsDetails
structural improvements, new interior stair, interior alterations | $70,000 |
| Jul 28, 2021 | Completed final sign-off Mar 2023 | 334 22nd Av | renovate e kitchen and dining room, new stairs to garage/basement, renovate e bath, new skylight, modify 1 window not visible from street, new on demand hot water heaterDetails
renovate e kitchen and dining room, new stairs to garage/basement, renovate e bath, new skylight, modify 1 window not visible from street, new on demand hot water heater | $50,000 |