Sky Trust Builder
- Based in
- Hercules
- On San Francisco permits
- Dec 2019 to Apr 2026
- Last 24 months
- 4 permits filed
18 permits since 2000: 10 completed, 7 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 261 days from filing to permit and 393 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 29, 2024 | Completed final sign-off Aug 2026 | 304 Gold Mine Dr | new cantilevered upper deck to replace (e) upper deck replace door that connects to upper deck. (n) windows in (e) location on front facade. (n) hardie plank siding on front, rear & side facades of resdience. (n) exterior stairs from (e) lower deck to rear yard (n) quardril and (e) lower deck.Details
new cantilevered upper deck to replace (e) upper deck replace door that connects to upper deck. (n) windows in (e) location on front facade. (n) hardie plank siding on front, rear & side facades of resdience. (n) exterior stairs from (e) lower deck to rear yard (n) quardril and (e) lower deck. | $35,000 |