Permit GraphShortlistSan Francisco building permits since 2000

Skuza Interiors

Contractor license
978306
State license record
Based in
San Carlos
On San Francisco permits
Sep 2016 to Jan 2020
Last 24 months
0 permits filed

4 permits since 2000: 3 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllKitchen remodel 2

2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 268 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jan 24, 2020Completed
final sign-off Oct 2020
779 Guerrero Stwater damage repair: install insulation, drywall. remodel kitchen. replace hardwood floor, one door. replace electrical upgrade for both units.no change to layout of walls & openings. maintain 1-hr separations between units
Details
Permit
202001242744
Status
complete
Filed
Jan 24, 2020
Permit issued
Jan 24, 2020
Final sign-off
Oct 22, 2020
Declared cost
$110,000
Address
779 Guerrero St

water damage repair: install insulation, drywall. remodel kitchen. replace hardwood floor, one door. replace electrical upgrade for both units.no change to layout of walls & openings. maintain 1-hr separations between units

Open the permit page

$110,000
Apr 25, 2019Completed
final sign-off Jan 2020
197 Terra Vista Avwater damage. drywall repair, 800 sq ft, floor replace, baseboards install, kitchen cabinets replace, 7 lf, retile shower, retile tub, new electrical panel. new wiring, light fixtures, shower fixtures, repair in kind same location.
Details
Permit
201904259005
Status
complete
Filed
Apr 25, 2019
Permit issued
Apr 25, 2019
Final sign-off
Jan 13, 2020
Declared cost
$30,000
Address
197 Terra Vista Av

water damage. drywall repair, 800 sq ft, floor replace, baseboards install, kitchen cabinets replace, 7 lf, retile shower, retile tub, new electrical panel. new wiring, light fixtures, shower fixtures, repair in kind same location.

Open the permit page

$30,000