Skuza Interiors

Contractor license
978306
State license record
Based in
San Carlos
On San Francisco permits
Sep 2016 to Jan 2020
Last 24 months
0 permits filed

4 permits since 2000: 3 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

AllKitchen remodel 2
FiledOutcomeAddressWork described on the permitDeclared cost
Jan 24, 2020Completed
final sign-off Oct 2020
779 Guerrero Stwater damage repair: install insulation, drywall. remodel kitchen. replace hardwood floor, one door. replace electrical upgrade for both units.no change to layout of walls & openings. maintain 1-hr separations between units
Details
Permit
202001242744
Permit issued
Jan 24, 2020
Final sign-off
Oct 22, 2020

water damage repair: install insulation, drywall. remodel kitchen. replace hardwood floor, one door. replace electrical upgrade for both units.no change to layout of walls & openings. maintain 1-hr separations between units

Open the permit page

$110,000
Apr 25, 2019Completed
final sign-off Jan 2020
197 Terra Vista Avwater damage. drywall repair, 800 sq ft, floor replace, baseboards install, kitchen cabinets replace, 7 lf, retile shower, retile tub, new electrical panel. new wiring, light fixtures, shower fixtures, repair in kind same location.
Details
Permit
201904259005
Permit issued
Apr 25, 2019
Final sign-off
Jan 13, 2020

water damage. drywall repair, 800 sq ft, floor replace, baseboards install, kitchen cabinets replace, 7 lf, retile shower, retile tub, new electrical panel. new wiring, light fixtures, shower fixtures, repair in kind same location.

Open the permit page

$30,000
Nov 15, 2017Completed
final sign-off Dec 2017
2115 Broadwaydrywall repair, baseboards, paint, install hardwood flooring around 600 sq. ft. no change of interior layout
Details
Permit
201711154028
Permit issued
Nov 15, 2017
Final sign-off
Dec 15, 2017

drywall repair, baseboards, paint, install hardwood flooring around 600 sq. ft. no change of interior layout

Open the permit page

$25,000
Sep 6, 2016Never finaled
issued Sep 2016, no final
2990 Clay Stwater damage repairs framing minimum drywall minimum retile shower walls wall and floor, new vanity install, baseboard install
Details
Permit
201609066823
Permit issued
Sep 6, 2016

water damage repairs framing minimum drywall minimum retile shower walls wall and floor, new vanity install, baseboard install

Open the permit page

$21,000