Siteline Construction
- Based in
- San Pablo
- On San Francisco permits
- Apr 2020 to Nov 2020
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 never finaled. Typically 152 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 18, 2020 | Never finaled issued Apr 2021, no final | 2542 15th Av | addition under existing main floor. remodel lower level to include 2 bedrooms, 1 bathroom, and 1 laundry. remove wall between kitchen and dining room and remodel kitchen. remodel main floor bathroom & add a bathroom in the rear main floor room. widen the existing internal stairDetails
addition under existing main floor. remodel lower level to include 2 bedrooms, 1 bathroom, and 1 laundry. remove wall between kitchen and dining room and remodel kitchen. remodel main floor bathroom & add a bathroom in the rear main floor room. widen the existing internal stair | $150,000 |