Back to kitchen remodel contractors
Siteline Construction
- Based in
- San Pablo
- On San Francisco permits
- Apr 2020 to Nov 2020
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 77 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 18, 2020 | Never finaled issued Apr 2021, no final | 2542 15th Av | addition under existing main floor. remodel lower level to include 2 bedrooms, 1 bathroom, and 1 laundry. remove wall between kitchen and dining room and remodel kitchen. remodel main floor bathroom & add a bathroom in the rear main floor room. widen the existing internal stairDetails
addition under existing main floor. remodel lower level to include 2 bedrooms, 1 bathroom, and 1 laundry. remove wall between kitchen and dining room and remodel kitchen. remodel main floor bathroom & add a bathroom in the rear main floor room. widen the existing internal stair | $150,000 |
| Apr 22, 2020 | Completed final sign-off Jul 2020 | 1200 Gough St | unit 5a: kitchen remodel:demo of extg kitchen cabinets and removal of appliances. install new kitchen cabinets in same location. install new appliances in same location. update kitchen circuits subpanel. circuits will be two 20-ampere small appliance to serve counter top and each appliance listedDetails
unit 5a: kitchen remodel:demo of extg kitchen cabinets and removal of appliances. install new kitchen cabinets in same location. install new appliances in same location. update kitchen circuits subpanel. circuits will be two 20-ampere small appliance to serve counter top and each appliance listed | $9,450 |