Back to kitchen remodel contractors
Simply Building Inc
- Based in
- Burlingame
- On San Francisco permits
- Mar 2010 to Nov 2025
- Last 24 months
- 7 permits filed
54 permits since 2000: 46 completed, 3 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
22 kitchen remodel permits: 17 completed, 3 in progress, 1 never finaled, 1 expired or cancelled. Typically 3 days from filing to permit and 151 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 15, 2025 | In progress issued Jun 2026 | 450 Urbano Dr | new dwelling unit (adu unit 450a) per california government code section 65852.2 at rear yard constrcut a 1-story attached adu with bedrooms, baths, kitchen and deck, 991 sf.Details
new dwelling unit (adu unit 450a) per california government code section 65852.2 at rear yard constrcut a 1-story attached adu with bedrooms, baths, kitchen and deck, 991 sf. | $258,000 |
| Oct 21, 2025 | In progress issued Nov 2025 | 130 Meadowbrook Dr | 1st fl: remodel e 1st fl space to laundry/wetbar, family and remodel e master suite. 2nd fl remodel e kitchen, bath, int stair and new bath. replace all e windows, infill south lightwellDetails
1st fl: remodel e 1st fl space to laundry/wetbar, family and remodel e master suite. 2nd fl remodel e kitchen, bath, int stair and new bath. replace all e windows, infill south lightwell | $187,000 |
| Nov 6, 2024 | In progress issued Nov 2024 | 1204 Funston Av | unit #1206: remodel (1) existing bathroom (1) kitchen in kind on 3rd floor of duplex dwelling total 1,115 sqft. replace the sheetrock w/ 5/8" type x on all walls and ceiling on 3rd floor. install r-15 insulation along exterior walls and r-30 insulation on ceiling. replace existing roof w/ modified..Details
unit #1206: remodel (1) existing bathroom (1) kitchen in kind on 3rd floor of duplex dwelling total 1,115 sqft. replace the sheetrock w/ 5/8" type x on all walls and ceiling on 3rd floor. install r-15 insulation along exterior walls and r-30 insulation on ceiling. replace existing roof w/ modified.. | $100,000 |
| Nov 5, 2024 | Completed final sign-off Jul 2025 | 1204 Funston Av | remodeling (1) existing bathroom (1) kitchen in kind on 2nd floor of duplex dwelling total 1,115 sqft. replace the sheetrock with 5/8 typex on all walls and ceiling on 2nd floor. install r-15 insulation along exterior walls and r-30 insulation on ceiling.Details
remodeling (1) existing bathroom (1) kitchen in kind on 2nd floor of duplex dwelling total 1,115 sqft. replace the sheetrock with 5/8 typex on all walls and ceiling on 2nd floor. install r-15 insulation along exterior walls and r-30 insulation on ceiling. | $90,000 |
| Aug 1, 2024 | Completed final sign-off Mar 2025 | 401 Miguel St | unit#2: remodel (1) (e) bathroom and (1) kitchen in kind on 2/f of single family dwelling total 900 sq ft. replace the sheetrock with 5/8" type x on all walls and ceiling on 2/f. install r-15 insulation along exterior walls and r-30 insulation in roof ceiling.Details
unit#2: remodel (1) (e) bathroom and (1) kitchen in kind on 2/f of single family dwelling total 900 sq ft. replace the sheetrock with 5/8" type x on all walls and ceiling on 2/f. install r-15 insulation along exterior walls and r-30 insulation in roof ceiling. | $90,000 |
| Jul 6, 2021 | Completed final sign-off Dec 2022 | 1865 37th Av | revision to 2021 0415 8648. at 2nd fl remove wall b/w kitchen and living. new level wood deck at rear w/ stair and sliding door. no skylight in kitchen. 1st fl door and windows to be remain.Details
revision to 2021 0415 8648. at 2nd fl remove wall b/w kitchen and living. new level wood deck at rear w/ stair and sliding door. no skylight in kitchen. 1st fl door and windows to be remain. | $15,000 |
| Apr 15, 2021 | Completed final sign-off Dec 2022 | 1865 37th Av | 2nd fl: remodel (e) kitchen, remove wall at dining & open stair. 1st fl: remodel (e) space with new bathroom, walk-in, media, laundry & theater room.Details
2nd fl: remodel (e) kitchen, remove wall at dining & open stair. 1st fl: remodel (e) space with new bathroom, walk-in, media, laundry & theater room. | $86,000 |
| Dec 6, 2019 | Completed final sign-off Jan 2022 | 1363 28th Av | interior remodel of kitchen and reconfigure interior walls (less than 75% demolition) to provide 2 beds 2.5 baths upstair. convert portion of unfinished garage to additional 1 bed/ bath, family room, and laundry ( rooms down) replace existing windows with wood windows (e) opening/(e)operation @frontDetails
interior remodel of kitchen and reconfigure interior walls (less than 75% demolition) to provide 2 beds 2.5 baths upstair. convert portion of unfinished garage to additional 1 bed/ bath, family room, and laundry ( rooms down) replace existing windows with wood windows (e) opening/(e)operation @front | $400,000 |
| Dec 4, 2019 | Completed final sign-off Jun 2020 | 2033 Lawton St | renovate (e) kitchen & bathroom,like for like, no change to walls & opening layout. replace kitchen cabinets, appliances, cocuntertop, add 8x 4in led lghts, 8 ckts, flooring; replace bathroom shower, shower valve, toilet, fan & vanity.Details
renovate (e) kitchen & bathroom,like for like, no change to walls & opening layout. replace kitchen cabinets, appliances, cocuntertop, add 8x 4in led lghts, 8 ckts, flooring; replace bathroom shower, shower valve, toilet, fan & vanity. | $30,000 |
| Apr 19, 2019 | Completed final sign-off Oct 2019 | 514 Los Palmos Dr | remodel (e) bathroom at top floor, remodel (e) kitchen, add shower to (e) toilet room at 2nd floorDetails
remodel (e) bathroom at top floor, remodel (e) kitchen, add shower to (e) toilet room at 2nd floor | $30,000 |
| Jul 10, 2018 | Completed final sign-off Sep 2018 | 1319 43rd Av | kitchen renovation: replace cabinet, countertops, flooring, install and update elecrical circuits.Details
kitchen renovation: replace cabinet, countertops, flooring, install and update elecrical circuits. | $20,000 |
| May 1, 2018 | Completed final sign-off Oct 2018 | 1790 40th Av | 1st floor enlarge (e) entry/lobby; at 2nd floor remodel (e) kitchen, remove wall and install beam, bathroom renovation (like for like).Details
1st floor enlarge (e) entry/lobby; at 2nd floor remodel (e) kitchen, remove wall and install beam, bathroom renovation (like for like). | $20,000 |
| Jun 12, 2017 | Completed final sign-off Sep 2017 | 2574 44th Av | renovate kitchen & bathroom, like for like. no structural work. update electrical panel & lighting.Details
renovate kitchen & bathroom, like for like. no structural work. update electrical panel & lighting. | $25,000 |
| May 5, 2017 | Completed final sign-off Mar 2018 | 1581 Webster St | work on #175. convert existing video rental to a limited restaurant, add kitchen and service center.Details
work on #175. convert existing video rental to a limited restaurant, add kitchen and service center. | $7,500 |
| Mar 2, 2017 | Completed final sign-off Jun 2017 | 778 Great Hy | #1 -kitchen renovation: like for like, replacing cabinets, countertop, sink, appliances, lighting & outlets.Details
#1 -kitchen renovation: like for like, replacing cabinets, countertop, sink, appliances, lighting & outlets. | $15,000 |
| Dec 21, 2016 | Completed final sign-off Apr 2017 | 1593 42nd Av | renovate appt new kitchen & bath. n/a for maher.Details
renovate appt new kitchen & bath. n/a for maher. | $25,000 |
| Dec 21, 2016 | Completed final sign-off Apr 2017 | 1599 42nd Av | renovate appt. new kitchen & bath. n/a for maher.Details
renovate appt. new kitchen & bath. n/a for maher. | $25,000 |
| Mar 12, 2015 | Completed final sign-off Aug 2015 | 1001 Pine St | kitchen and bath renovation. like for like. no wall changes. cosmetic cabinets, sinks, faucet, tile counter top. no wall modification. non structural onlyDetails
kitchen and bath renovation. like for like. no wall changes. cosmetic cabinets, sinks, faucet, tile counter top. no wall modification. non structural only | $30,000 |
| Oct 14, 2014 | Never finaled issued Oct 2014, no final | 992 Portola Dr | interior remodel single family dwelling, remove non-bearing wall between kitchen and dining. remodel one bathroom, provide new lighting per plan.Details
interior remodel single family dwelling, remove non-bearing wall between kitchen and dining. remodel one bathroom, provide new lighting per plan. | $15,000 |
| Apr 16, 2014 | Completed final sign-off Jul 2014 | 1001 Pine St | kitchen renovation: replacing kitchen cabinets (like for like). installing outlets and intalling appliances. no lighting work under this permit cec 150(k). new hood connection to existing ductwork.Details
kitchen renovation: replacing kitchen cabinets (like for like). installing outlets and intalling appliances. no lighting work under this permit cec 150(k). new hood connection to existing ductwork. | $6,000 |
| Mar 17, 2014 | Expired or cancelled expired Nov 2017 | 785 Treat Av | change of occupancy r3 to r2. at 2/fl, divide 2/fl space to 2 separate units with new kitchen, bathroom and bedroom & study.Details
change of occupancy r3 to r2. at 2/fl, divide 2/fl space to 2 separate units with new kitchen, bathroom and bedroom & study. | $30,000 |
| Feb 25, 2013 | Completed final sign-off Oct 2013 | 4237 Balboa St | renovation of single family dwelling- replacement of 4 windows at west side & 4 windows @ rear. add family room, bedroom, 1 bathroom on first floor (around 401 sq ft). remodel (e) kitchen & bathroom on 2nd floor. add 2 half-baths on 2nd floor.Details
renovation of single family dwelling- replacement of 4 windows at west side & 4 windows @ rear. add family room, bedroom, 1 bathroom on first floor (around 401 sq ft). remodel (e) kitchen & bathroom on 2nd floor. add 2 half-baths on 2nd floor. | $42,000 |