Back to bathroom remodel contractors
Simply Building Inc
- Based in
- Burlingame
- On San Francisco permits
- Mar 2010 to Nov 2025
- Last 24 months
- 7 permits filed
54 permits since 2000: 46 completed, 3 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 17 completed, 3 in progress, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 125 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 15, 2025 | In progress issued Jun 2026 | 450 Urbano Dr | new dwelling unit (adu unit 450a) per california government code section 65852.2 at rear yard constrcut a 1-story attached adu with bedrooms, baths, kitchen and deck, 991 sf.Details
new dwelling unit (adu unit 450a) per california government code section 65852.2 at rear yard constrcut a 1-story attached adu with bedrooms, baths, kitchen and deck, 991 sf. | $258,000 |
| Oct 21, 2025 | In progress issued Nov 2025 | 130 Meadowbrook Dr | 1st fl: remodel e 1st fl space to laundry/wetbar, family and remodel e master suite. 2nd fl remodel e kitchen, bath, int stair and new bath. replace all e windows, infill south lightwellDetails
1st fl: remodel e 1st fl space to laundry/wetbar, family and remodel e master suite. 2nd fl remodel e kitchen, bath, int stair and new bath. replace all e windows, infill south lightwell | $187,000 |
| Nov 6, 2024 | In progress issued Nov 2024 | 1204 Funston Av | unit #1206: remodel (1) existing bathroom (1) kitchen in kind on 3rd floor of duplex dwelling total 1,115 sqft. replace the sheetrock w/ 5/8" type x on all walls and ceiling on 3rd floor. install r-15 insulation along exterior walls and r-30 insulation on ceiling. replace existing roof w/ modified..Details
unit #1206: remodel (1) existing bathroom (1) kitchen in kind on 3rd floor of duplex dwelling total 1,115 sqft. replace the sheetrock w/ 5/8" type x on all walls and ceiling on 3rd floor. install r-15 insulation along exterior walls and r-30 insulation on ceiling. replace existing roof w/ modified.. | $100,000 |
| Nov 5, 2024 | Completed final sign-off Jul 2025 | 1204 Funston Av | remodeling (1) existing bathroom (1) kitchen in kind on 2nd floor of duplex dwelling total 1,115 sqft. replace the sheetrock with 5/8 typex on all walls and ceiling on 2nd floor. install r-15 insulation along exterior walls and r-30 insulation on ceiling.Details
remodeling (1) existing bathroom (1) kitchen in kind on 2nd floor of duplex dwelling total 1,115 sqft. replace the sheetrock with 5/8 typex on all walls and ceiling on 2nd floor. install r-15 insulation along exterior walls and r-30 insulation on ceiling. | $90,000 |
| Aug 1, 2024 | Completed final sign-off Mar 2025 | 401 Miguel St | unit#2: remodel (1) (e) bathroom and (1) kitchen in kind on 2/f of single family dwelling total 900 sq ft. replace the sheetrock with 5/8" type x on all walls and ceiling on 2/f. install r-15 insulation along exterior walls and r-30 insulation in roof ceiling.Details
unit#2: remodel (1) (e) bathroom and (1) kitchen in kind on 2/f of single family dwelling total 900 sq ft. replace the sheetrock with 5/8" type x on all walls and ceiling on 2/f. install r-15 insulation along exterior walls and r-30 insulation in roof ceiling. | $90,000 |
| May 24, 2024 | Completed final sign-off Sep 2024 | 450 Urbano Dr | remodel hallway bathroom. like for like. new shower pan, new toilet, new vanity, no structural wall changes. no new wall & no existing wall relocation. number of plumbing fixture counts remain same. new lighting shall comply with cec 150.0(k)5.Details
remodel hallway bathroom. like for like. new shower pan, new toilet, new vanity, no structural wall changes. no new wall & no existing wall relocation. number of plumbing fixture counts remain same. new lighting shall comply with cec 150.0(k)5. | $15,000 |
| Feb 22, 2024 | Completed final sign-off Apr 2024 | 2522 39th Av | bathroom remodel to hallway bathroom. no wall removal or structual work. like for like. 1 toilet, 1 vanity, 1 shower. 2nd flr.Details
bathroom remodel to hallway bathroom. no wall removal or structual work. like for like. 1 toilet, 1 vanity, 1 shower. 2nd flr. | $12,000 |
| Apr 15, 2021 | Completed final sign-off Dec 2022 | 1865 37th Av | 2nd fl: remodel (e) kitchen, remove wall at dining & open stair. 1st fl: remodel (e) space with new bathroom, walk-in, media, laundry & theater room.Details
2nd fl: remodel (e) kitchen, remove wall at dining & open stair. 1st fl: remodel (e) space with new bathroom, walk-in, media, laundry & theater room. | $86,000 |
| Dec 6, 2019 | Completed final sign-off Jan 2022 | 1363 28th Av | interior remodel of kitchen and reconfigure interior walls (less than 75% demolition) to provide 2 beds 2.5 baths upstair. convert portion of unfinished garage to additional 1 bed/ bath, family room, and laundry ( rooms down) replace existing windows with wood windows (e) opening/(e)operation @frontDetails
interior remodel of kitchen and reconfigure interior walls (less than 75% demolition) to provide 2 beds 2.5 baths upstair. convert portion of unfinished garage to additional 1 bed/ bath, family room, and laundry ( rooms down) replace existing windows with wood windows (e) opening/(e)operation @front | $400,000 |
| Dec 4, 2019 | Completed final sign-off Jun 2020 | 2033 Lawton St | renovate (e) kitchen & bathroom,like for like, no change to walls & opening layout. replace kitchen cabinets, appliances, cocuntertop, add 8x 4in led lghts, 8 ckts, flooring; replace bathroom shower, shower valve, toilet, fan & vanity.Details
renovate (e) kitchen & bathroom,like for like, no change to walls & opening layout. replace kitchen cabinets, appliances, cocuntertop, add 8x 4in led lghts, 8 ckts, flooring; replace bathroom shower, shower valve, toilet, fan & vanity. | $30,000 |
| Apr 19, 2019 | Completed final sign-off Oct 2019 | 514 Los Palmos Dr | remodel (e) bathroom at top floor, remodel (e) kitchen, add shower to (e) toilet room at 2nd floorDetails
remodel (e) bathroom at top floor, remodel (e) kitchen, add shower to (e) toilet room at 2nd floor | $30,000 |
| May 1, 2018 | Completed final sign-off Oct 2018 | 1790 40th Av | 1st floor enlarge (e) entry/lobby; at 2nd floor remodel (e) kitchen, remove wall and install beam, bathroom renovation (like for like).Details
1st floor enlarge (e) entry/lobby; at 2nd floor remodel (e) kitchen, remove wall and install beam, bathroom renovation (like for like). | $20,000 |
| Jan 9, 2018 | Completed final sign-off Mar 2018 | 2574 44th Av | at 1st fl, additonal new family room and bathroom at e garage spaceDetails
at 1st fl, additonal new family room and bathroom at e garage space | $30,000 |
| Jun 12, 2017 | Completed final sign-off Sep 2017 | 2574 44th Av | renovate kitchen & bathroom, like for like. no structural work. update electrical panel & lighting.Details
renovate kitchen & bathroom, like for like. no structural work. update electrical panel & lighting. | $25,000 |
| Feb 28, 2017 | Completed final sign-off Jun 2017 | 778 Great Hy | bathroom renovation: renovate shower, replace floor tile, vanity and toiletDetails
bathroom renovation: renovate shower, replace floor tile, vanity and toilet | $10,000 |
| Dec 21, 2016 | Completed final sign-off Apr 2017 | 1593 42nd Av | renovate appt new kitchen & bath. n/a for maher.Details
renovate appt new kitchen & bath. n/a for maher. | $25,000 |
| Dec 21, 2016 | Completed final sign-off Apr 2017 | 1599 42nd Av | renovate appt. new kitchen & bath. n/a for maher.Details
renovate appt. new kitchen & bath. n/a for maher. | $25,000 |
| Mar 12, 2015 | Completed final sign-off Aug 2015 | 1001 Pine St | kitchen and bath renovation. like for like. no wall changes. cosmetic cabinets, sinks, faucet, tile counter top. no wall modification. non structural onlyDetails
kitchen and bath renovation. like for like. no wall changes. cosmetic cabinets, sinks, faucet, tile counter top. no wall modification. non structural only | $30,000 |
| Oct 14, 2014 | Never finaled issued Oct 2014, no final | 992 Portola Dr | interior remodel single family dwelling, remove non-bearing wall between kitchen and dining. remodel one bathroom, provide new lighting per plan.Details
interior remodel single family dwelling, remove non-bearing wall between kitchen and dining. remodel one bathroom, provide new lighting per plan. | $15,000 |
| Mar 17, 2014 | Expired or cancelled expired Nov 2017 | 785 Treat Av | change of occupancy r3 to r2. at 2/fl, divide 2/fl space to 2 separate units with new kitchen, bathroom and bedroom & study.Details
change of occupancy r3 to r2. at 2/fl, divide 2/fl space to 2 separate units with new kitchen, bathroom and bedroom & study. | $30,000 |
| Feb 25, 2013 | Completed final sign-off Oct 2013 | 4237 Balboa St | renovation of single family dwelling- replacement of 4 windows at west side & 4 windows @ rear. add family room, bedroom, 1 bathroom on first floor (around 401 sq ft). remodel (e) kitchen & bathroom on 2nd floor. add 2 half-baths on 2nd floor.Details
renovation of single family dwelling- replacement of 4 windows at west side & 4 windows @ rear. add family room, bedroom, 1 bathroom on first floor (around 401 sq ft). remodel (e) kitchen & bathroom on 2nd floor. add 2 half-baths on 2nd floor. | $42,000 |
| Jan 11, 2013 | Never finaled issued Jan 2013, no final | 5036 Diamond Heights Bl | replace bath tob/shower valve and replace tile on walls and floor - like for like. no structural changes or layout changesDetails
replace bath tob/shower valve and replace tile on walls and floor - like for like. no structural changes or layout changes | $3,000 |
| Mar 11, 2010 | Completed final sign-off Jun 2010 | 2250 24th St | bathroom remodel (like for like). lighting high efficacy or occupancy sensor control. no change to exhaust system.Details
bathroom remodel (like for like). lighting high efficacy or occupancy sensor control. no change to exhaust system. | $5,000 |