Back to kitchen remodel contractors
Shawn Brown
- Based in
- Novato
- On San Francisco permits
- Jun 2007 to Apr 2012
- Last 24 months
- 0 permits filed
19 permits since 2000: 15 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 4 days from filing to permit and 287 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2009 | Completed final sign-off May 2010 | 632 Cole St | interior remodel on 3rd floor. instal new cabinets and appliances in kitchen. install new tub,toilet, tile and vanity in bathroom. install new closets. non structural wall removal.Details
interior remodel on 3rd floor. instal new cabinets and appliances in kitchen. install new tub,toilet, tile and vanity in bathroom. install new closets. non structural wall removal. | $25,000 |
| Jun 25, 2007 | Never finaled issued Jun 2007, no final | 2158 Pine St | (6) windows match (e) replacements, (6) kitchen sink, & (6) bathroom sinks replacement. 5 door replacemtns interior in kind stuuco patch around window insulation, hardwood floor installation, paint all interior, repair wall plaster in unit#13 @ windiw area, unit#21 ceiling in front entry hall andDetails
(6) windows match (e) replacements, (6) kitchen sink, & (6) bathroom sinks replacement. 5 door replacemtns interior in kind stuuco patch around window insulation, hardwood floor installation, paint all interior, repair wall plaster in unit#13 @ windiw area, unit#21 ceiling in front entry hall and | $65,000 |