Back to bathroom remodel contractors
Shawn Brown
- Based in
- Novato
- On San Francisco permits
- Jun 2007 to Apr 2012
- Last 24 months
- 0 permits filed
19 permits since 2000: 15 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 3 completed, 2 never finaled, 1 expired or cancelled. Typically 4 days from filing to permit and 342 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2010 | Expired or cancelled expired Mar 2014 | 108 Ellsworth St | remodel bathroom,window replacement in-kind at fron and rear, new front door w/transom wdw. install new 3 skylights, new hardy siding at rear. new int. doors. new rod and shelf. new cased opening. new w/d hook ups in garage. new mep per planDetails
remodel bathroom,window replacement in-kind at fron and rear, new front door w/transom wdw. install new 3 skylights, new hardy siding at rear. new int. doors. new rod and shelf. new cased opening. new w/d hook ups in garage. new mep per plan | $28,000 |
| Aug 3, 2010 | Completed final sign-off Jun 2012 | 573 Diamond St | revision to permit# 200810305513 create (n) media room & bathroom @ 1st. flr. relocate laundry & hall @ first flr.Details
revision to permit# 200810305513 create (n) media room & bathroom @ 1st. flr. relocate laundry & hall @ first flr. | $20,000 |
| Jul 28, 2009 | Completed final sign-off May 2010 | 632 Cole St | interior remodel on 3rd floor. instal new cabinets and appliances in kitchen. install new tub,toilet, tile and vanity in bathroom. install new closets. non structural wall removal.Details
interior remodel on 3rd floor. instal new cabinets and appliances in kitchen. install new tub,toilet, tile and vanity in bathroom. install new closets. non structural wall removal. | $25,000 |
| Oct 22, 2008 | Never finaled issued Oct 2008, no final | 37 Douglass St | install 1 new window & replace 4 windows & slider. install new cabinets, new lighting/outlets; install new sink & vanity, new tile in bathroom. install new solatube skylight & repalce old water heater w/new tankless water heater. demo closets in dingin & build out bar w/cased openigns above.Details
install 1 new window & replace 4 windows & slider. install new cabinets, new lighting/outlets; install new sink & vanity, new tile in bathroom. install new solatube skylight & repalce old water heater w/new tankless water heater. demo closets in dingin & build out bar w/cased openigns above. | $50,000 |
| Oct 7, 2008 | Completed final sign-off Sep 2009 | 6 Mountview Ct | legalize downstairs area. raise dropped ceiling to 7'6". build new partition wall (fire rated) with fire rated door. demo door to bedroom #1 and add exterior door. gfci plugs and flourescent lights in bathroom. add lights at exterior doors. demo wet bar. install new fau and feeder ductsDetails
legalize downstairs area. raise dropped ceiling to 7'6". build new partition wall (fire rated) with fire rated door. demo door to bedroom #1 and add exterior door. gfci plugs and flourescent lights in bathroom. add lights at exterior doors. demo wet bar. install new fau and feeder ducts | $12,000 |
| Jun 25, 2007 | Never finaled issued Jun 2007, no final | 2158 Pine St | (6) windows match (e) replacements, (6) kitchen sink, & (6) bathroom sinks replacement. 5 door replacemtns interior in kind stuuco patch around window insulation, hardwood floor installation, paint all interior, repair wall plaster in unit#13 @ windiw area, unit#21 ceiling in front entry hall andDetails
(6) windows match (e) replacements, (6) kitchen sink, & (6) bathroom sinks replacement. 5 door replacemtns interior in kind stuuco patch around window insulation, hardwood floor installation, paint all interior, repair wall plaster in unit#13 @ windiw area, unit#21 ceiling in front entry hall and | $65,000 |