Shao Fat Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Oct 2026
- Last 24 months
- 20 permits filed
72 permits since 2000: 56 completed, 10 in progress, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 in progress. Typically 10 days from filing to permit and 279 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 3405 Anza St | rev 202602176043. full stair replacement, as-built, per bid request.Details
rev 202602176043. full stair replacement, as-built, per bid request. | $500 |
| Aug 15, 2024 | Completed final sign-off Feb 2026 | 85 Beachmont Dr | 1. relocate the stair to the rear 2. use the stair well to become bath room for master bed room at 2nd fl. at ground fl. becomes a foyer. 3.sub-divided one bedroom to two w/ closet to make total of 3 bedroom on 2nd floor. 4.voluntary seismic strengthening on ground fl. 5. 2nd fl horizontal expandDetails
1. relocate the stair to the rear 2. use the stair well to become bath room for master bed room at 2nd fl. at ground fl. becomes a foyer. 3.sub-divided one bedroom to two w/ closet to make total of 3 bedroom on 2nd floor. 4.voluntary seismic strengthening on ground fl. 5. 2nd fl horizontal expand | $60,000 |
| Sep 25, 2015 | Completed final sign-off Oct 2015 | 1350 16th Av | comply with nov 201564511, repair (5) deteriorated wood egress stair in kindDetails
comply with nov 201564511, repair (5) deteriorated wood egress stair in kind | $3,800 |