Back to kitchen remodel contractors
Shao Fat Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Oct 2026
- Last 24 months
- 20 permits filed
72 permits since 2000: 56 completed, 10 in progress, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
18 kitchen remodel permits: 15 completed, 2 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 87 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 19, 2026 | In progress issued May 2026 | 672 47th Av | top floor: remodel 2 bathrooms and kitchen in kind. upgrade electrical wires of the unit, and upgrade sub-panel.Details
top floor: remodel 2 bathrooms and kitchen in kind. upgrade electrical wires of the unit, and upgrade sub-panel. | $38,000 |
| Aug 4, 2025 | In progress issued Aug 2025 | 91 Inverness Dr | remodel two bathrooms and kitchen of (e) in-kind. install new hardie sidding at the back of the house. replace front window at the front insame size upgrade electrical panel to 200 amp.Details
remodel two bathrooms and kitchen of (e) in-kind. install new hardie sidding at the back of the house. replace front window at the front insame size upgrade electrical panel to 200 amp. | $40,000 |
| Apr 10, 2025 | Completed final sign-off Nov 2025 | 2414 42nd Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). need a "green tag" for electrical service equipment. | $18,000 |
| Jan 31, 2025 | Expired or cancelled cancelled Jun 2025 | 2414 42nd Av | in-kind remodeling of 1 kitchen(s) in 2nd fl alteration of service equipment. need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl alteration of service equipment. need a "green tag" for electrical service equipment. | $11,000 |
| Apr 19, 2024 | Completed final sign-off Jul 2024 | 946 Stockton St | remodel kitchen and bathroom.Details
remodel kitchen and bathroom. | $5,000 |
| Feb 28, 2023 | Completed final sign-off Jun 2023 | 77 Dorado Tr | one: remodel kitchen and 2 baths in kindDetails
one: remodel kitchen and 2 baths in kind | $20,000 |
| Jul 20, 2022 | Completed final sign-off Aug 2022 | 1268 12th Av | remodel existing kitchen in same layout to comply with #202292815Details
remodel existing kitchen in same layout to comply with #202292815 | $6,000 |
| May 19, 2022 | Completed final sign-off Oct 2023 | 500 41st Av | 1/f: convert (e) rooms space to one new dwelling unit (500a) within (e) bldg footprint. new unit include bedroom, bathroom, home office and kitchen.Details
1/f: convert (e) rooms space to one new dwelling unit (500a) within (e) bldg footprint. new unit include bedroom, bathroom, home office and kitchen. | $60,000 |
| Feb 17, 2022 | Completed final sign-off Feb 2024 | 939 Dartmouth St | at 1st floor, new home office with wet bar, new deck and remodel existing bedroom and bathroom. at 2nd floor remodel existing bathroom and kitchen, remove wall between kitchen and dining roomDetails
at 1st floor, new home office with wet bar, new deck and remodel existing bedroom and bathroom. at 2nd floor remodel existing bathroom and kitchen, remove wall between kitchen and dining room | $95,000 |
| Dec 27, 2021 | Completed final sign-off Dec 2022 | 1328 25th Av | remodel kitchen with new cabinets & update electrical panel. no structural work,no walls will be removed.Details
remodel kitchen with new cabinets & update electrical panel. no structural work,no walls will be removed. | $5,000 |
| Dec 23, 2021 | Completed final sign-off Sep 2023 | 1374 26th Av | 2nd fl: removel (e) bathroom & kitchen. replace rear & side windows. 1st fl: remodel (e) space for new bathroom, 2 (n) bedrooms, media rm, wetbar & laundry. front exterior work under separate permit.Details
2nd fl: removel (e) bathroom & kitchen. replace rear & side windows. 1st fl: remodel (e) space for new bathroom, 2 (n) bedrooms, media rm, wetbar & laundry. front exterior work under separate permit. | $85,000 |
| Sep 24, 2021 | Completed final sign-off Nov 2021 | 275 Talbert St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $12,000 |
| Apr 21, 2021 | Completed final sign-off Jun 2021 | 1266 12th Av | remodel kitchen in-kind: new cbinets, sink, counter top, faucet, flooring, new lights.Details
remodel kitchen in-kind: new cbinets, sink, counter top, faucet, flooring, new lights. | $8,000 |
| Nov 5, 2020 | Completed final sign-off Nov 2020 | 170 Topeka Av | remodel (e) kitchen in-kind about 100 sqft.Details
remodel (e) kitchen in-kind about 100 sqft. | $8,000 |
| Aug 27, 2020 | Completed final sign-off Dec 2020 | 851 Baker St | remodel kitchen and bathroom in-kindDetails
remodel kitchen and bathroom in-kind | $7,000 |
| Jul 30, 2020 | Completed final sign-off Sep 2020 | 2501 46th Av | remodel kitchen 8x10 and 1 bathroom 5x6, in-kindDetails
remodel kitchen 8x10 and 1 bathroom 5x6, in-kind | $15,000 |
| Sep 6, 2019 | Completed final sign-off Nov 2019 | 1907 28th Av | remodel kitchen & upper bathroom in-kind, lower bathroom replace shower only.Details
remodel kitchen & upper bathroom in-kind, lower bathroom replace shower only. | $18,000 |
| Jul 25, 2019 | Completed final sign-off Oct 2019 | 908 Junipero Serra Bl | remodel kitchen in kind and upgrade the main electrical panel to 100 amps. 230 sqfts for kitchen remodel.Details
remodel kitchen in kind and upgrade the main electrical panel to 100 amps. 230 sqfts for kitchen remodel. | $8,000 |