Back to kitchen remodel contractors
Sh Painting And Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2023 to Aug 2026
- Last 24 months
- 5 permits filed
14 permits since 2000: 13 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 173 days from filing to permit and 294 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 8, 2025 | Completed final sign-off Jun 2026 | 413 Tehama St | 3/f: convert - (e) kitchen to new office, (e) laundry to bath, (e) powder room to laundry room. expand (e) dinning room and combine with new kitchen. expand (e) closet in (e) bedroom #3. expand entrance in (e) bedroom #2. expand (e) bath #2. remove (e) entry, (e) bath #1, (e) wetbar, (e) pantry,Details
3/f: convert - (e) kitchen to new office, (e) laundry to bath, (e) powder room to laundry room. expand (e) dinning room and combine with new kitchen. expand (e) closet in (e) bedroom #3. expand entrance in (e) bedroom #2. expand (e) bath #2. remove (e) entry, (e) bath #1, (e) wetbar, (e) pantry, | $150,000 |
| Jan 17, 2024 | Completed final sign-off Apr 2025 | 332 Teresita Bl | interior renovation to convert unconditioned space at ground floor to become 3 bedrooms & 2 bathrooms. new kitchen, hydronic heat system, interconnecting staircase. new street tree. no change to (e) use, number of dwelling & height.Details
interior renovation to convert unconditioned space at ground floor to become 3 bedrooms & 2 bathrooms. new kitchen, hydronic heat system, interconnecting staircase. new street tree. no change to (e) use, number of dwelling & height. | $317,200 |
| Oct 13, 2023 | Completed final sign-off Aug 2026 | 465 Parker Av | interior renovation of the upper unit. no work at basement (lower unit). kitchen & two bathrm renovation. (e) deck to be modified. convert (e) powder rm to full bath at g/f. new insulation. replace (1) furnace to electric heat pump system. no change of use, area of conditioned space & height.Details
interior renovation of the upper unit. no work at basement (lower unit). kitchen & two bathrm renovation. (e) deck to be modified. convert (e) powder rm to full bath at g/f. new insulation. replace (1) furnace to electric heat pump system. no change of use, area of conditioned space & height. | $140,500 |