Permit GraphShortlistSan Francisco building permits since 2000

Sh Painting And Construction Inc

Contractor license
1108785
State license record
Based in
San Francisco
On San Francisco permits
Oct 2023 to Aug 2026
Last 24 months
5 permits filed

14 permits since 2000: 13 completed, 1 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Deck permits

AllDeck 3Stairs 1Kitchen remodel 3Bathroom remodel 5

3 deck permits: 3 completed. Typically 0 days from filing to permit and 11 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Apr 14, 2025Completed
final sign-off Apr 2025
64 San Benito Wyreplace the four 9 ft deck boards on the front side of the balcony due to dry rot damage. repairs less than 50 % of structure.
Details
Permit
202504144310
Status
complete
Filed
Apr 14, 2025
Permit issued
Apr 14, 2025
Final sign-off
Apr 18, 2025
Declared cost
$1,000
Address
64 San Benito Wy

replace the four 9 ft deck boards on the front side of the balcony due to dry rot damage. repairs less than 50 % of structure.

Open the permit page

$1,000
Jun 27, 2024Completed
final sign-off Jul 2024
281 Addison Strepair the damage exterior wood flooring at the entrance to the house & wood fascia board at the rear side over the deck. according to nov complaint 202418391.
Details
Permit
202406275387
Status
complete
Filed
Jun 27, 2024
Permit issued
Jun 27, 2024
Final sign-off
Jul 8, 2024
Declared cost
$3,000
Address
281 Addison St

repair the damage exterior wood flooring at the entrance to the house & wood fascia board at the rear side over the deck. according to nov complaint 202418391.

Open the permit page

$3,000
Oct 13, 2023Completed
final sign-off Aug 2026
465 Parker Avinterior renovation of the upper unit. no work at basement (lower unit). kitchen & two bathrm renovation. (e) deck to be modified. convert (e) powder rm to full bath at g/f. new insulation. replace (1) furnace to electric heat pump system. no change of use, area of conditioned space & height.
Details
Permit
202310138629
Status
complete
Filed
Oct 13, 2023
Permit issued
Jul 14, 2025
Final sign-off
Aug 17, 2026
Declared cost
$140,500
Address
465 Parker Av

interior renovation of the upper unit. no work at basement (lower unit). kitchen & two bathrm renovation. (e) deck to be modified. convert (e) powder rm to full bath at g/f. new insulation. replace (1) furnace to electric heat pump system. no change of use, area of conditioned space & height.

Open the permit page

$140,500
Sh Painting And Construction Inc, contractor license 1108785 | Permit Graph