Back to kitchen remodel contractors
Sf Craftsman
- Based in
- San Francisco
- On San Francisco permits
- May 2016 to Apr 2026
- Last 24 months
- 8 permits filed
52 permits since 2000: 51 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 10 completed. Typically 0 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2023 | Completed final sign-off Nov 2023 | 1724 Moraga St | in-kind remodeling of 1 kitchen(s) in 2nd fl alteration of service equipment.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl alteration of service equipment. | $45,000 |
| Jul 6, 2023 | Completed final sign-off Nov 2023 | 1 Cranleigh Dr | in-kind remodeling of 1 kitchen(s) in 1st fl alteration of service equipment.Details
in-kind remodeling of 1 kitchen(s) in 1st fl alteration of service equipment. | $60,000 |
| Apr 20, 2023 | Completed final sign-off Aug 2023 | 47 Milton St | kitchen remodel w/ existing cabinets and new appliances. induction range, remove and replace. add new sub panel for new appliances in the kitchen. replace sink, faucet, hood w/ vent and countertop. new refridgerator where old was removed, new dishwasher where old was removed. no structural workDetails
kitchen remodel w/ existing cabinets and new appliances. induction range, remove and replace. add new sub panel for new appliances in the kitchen. replace sink, faucet, hood w/ vent and countertop. new refridgerator where old was removed, new dishwasher where old was removed. no structural work | $20,000 |
| Jun 30, 2022 | Completed final sign-off Oct 2022 | 530 Grafton Av | remove and replace kitchen remodel with same layout changes; no structural changes. all new fixtures and finishes. remove and replace bathroom remodel with same layout, no structural changes. all new fixtures and finishes.Details
remove and replace kitchen remodel with same layout changes; no structural changes. all new fixtures and finishes. remove and replace bathroom remodel with same layout, no structural changes. all new fixtures and finishes. | $60,000 |
| Jan 18, 2022 | Completed final sign-off Jun 2022 | 2641 Greenwich St | kitchen remodel. remove and replace in kind. all new fixtures and finishes. layout to remain the same.Details
kitchen remodel. remove and replace in kind. all new fixtures and finishes. layout to remain the same. | $45,000 |
| Dec 8, 2021 | Completed final sign-off Jun 2022 | 1698 24th Av | add 1 wall within extg foot print of bathroom to form powder kroom with sink and 1 toilet. add pocket door. kitchen upgrade electrical. reinstall extg cabinets and change countertops. upgrade electrical panel.Details
add 1 wall within extg foot print of bathroom to form powder kroom with sink and 1 toilet. add pocket door. kitchen upgrade electrical. reinstall extg cabinets and change countertops. upgrade electrical panel. | $8,000 |
| Sep 21, 2021 | Completed final sign-off Nov 2022 | 33 Benton Av | remove and replace kitchen. all new fixtures and finishes, new wood flooring. replace range, refrigerator, sink, dishwasher, garbage disposal, all new cabinets, countertops, and backsplash. no stru. work. lights per cebc 150.0(k)Details
remove and replace kitchen. all new fixtures and finishes, new wood flooring. replace range, refrigerator, sink, dishwasher, garbage disposal, all new cabinets, countertops, and backsplash. no stru. work. lights per cebc 150.0(k) | $45,000 |
| Aug 10, 2021 | Completed final sign-off Jan 2022 | 850 Head St | remove/replace/remodel 1 (e) kitchen. replace rang with hood, cabinets, countertops, sink, faucet. new tile flooring and backsplash.replace kitchen windows (2) w/in (e) opening. non-street visiable. repalce 2 sets french doors w/in (e) opening. lights per cec 150.0 (k)Details
remove/replace/remodel 1 (e) kitchen. replace rang with hood, cabinets, countertops, sink, faucet. new tile flooring and backsplash.replace kitchen windows (2) w/in (e) opening. non-street visiable. repalce 2 sets french doors w/in (e) opening. lights per cec 150.0 (k) | $50,000 |
| May 3, 2018 | Completed final sign-off Nov 2018 | 474 Hearst Av | remodel kitchen. remove wall between kitchen and dining rmDetails
remodel kitchen. remove wall between kitchen and dining rm | $25,000 |
| Sep 25, 2017 | Completed final sign-off Jul 2018 | 836 North Point St | remodel (e) kitchen & (e) bathroom. new flooring and paint. layout remain unchanged. no walls altered or infilled.Details
remodel (e) kitchen & (e) bathroom. new flooring and paint. layout remain unchanged. no walls altered or infilled. | $40,000 |