Sf Craftsman
- Based in
- San Francisco
- On San Francisco permits
- May 2016 to Apr 2026
- Last 24 months
- 8 permits filed
52 permits since 2000: 51 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2026 | Completed final sign-off Jun 2026 | 35 Otsego Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $45,000 |
| Oct 17, 2025 | Completed final sign-off Nov 2025 | 2 Museum Wy | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $25,000 |
| Aug 19, 2025 | Completed final sign-off Sep 2025 | 505 Sargent St | siding replacement- remove stucco approx 750 sqft. install new insulation, plywood and housewrap. install new hardie siding planks. like for like some materials. at rear elevation.Details
siding replacement- remove stucco approx 750 sqft. install new insulation, plywood and housewrap. install new hardie siding planks. like for like some materials. at rear elevation. | $30,000 |
| Aug 12, 2025 | Completed final sign-off Oct 2025 | 416 Colon Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). alteration of service equipment.Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). alteration of service equipment. | $45,000 |
| Apr 24, 2025 | Completed final sign-off May 2025 | 449 Carl St | bathroom remodel in kind. new vanity replacement, new shower tile replacement. replace window in kind, in same opening, to tempered glass. remove built in for vanityDetails
bathroom remodel in kind. new vanity replacement, new shower tile replacement. replace window in kind, in same opening, to tempered glass. remove built in for vanity | $40,000 |
| Apr 24, 2025 | Completed final sign-off Jun 2025 | 1024 Oak St | partial bathroom remodel vanity, flooring replacement. change door opening to pocker doorDetails
partial bathroom remodel vanity, flooring replacement. change door opening to pocker door | $16,000 |
| Mar 4, 2025 | Completed final sign-off May 2025 | 739 Grafton Av | in-kind remodeling of 2 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 2nd fl with 0 shower pan(s). | $50,000 |
| Oct 25, 2024 | Completed final sign-off Dec 2024 | 3000 Alemany Bl | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $28,000 |
| Sep 27, 2024 | Completed final sign-off Dec 2024 | 219 Thrift St | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $45,000 |
| Sep 23, 2024 | Completed final sign-off Dec 2024 | 1980 08th Av | bonus room with attached bathroom remodel. replace in-kind 1 toilet, vanyt sink, shower pan in bathroom. update plaster w/ drywall in bonus room w/ insulation.replce windows in (e) openings of bonus room/ bath. update receptacles and o/h lighting, new flooring with floor heat.Details
bonus room with attached bathroom remodel. replace in-kind 1 toilet, vanyt sink, shower pan in bathroom. update plaster w/ drywall in bonus room w/ insulation.replce windows in (e) openings of bonus room/ bath. update receptacles and o/h lighting, new flooring with floor heat. | $80,000 |
| Aug 20, 2024 | Completed final sign-off Sep 2024 | 260 Ordway St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $25,000 |
| Aug 20, 2024 | Completed final sign-off Sep 2024 | 260 Ordway St | exterior deck repairs less than 50% located at rear of property. to include rainlings and framing replacment to bring up to code on top and mid level at rear of property. all work in kind, less than 50%.Details
exterior deck repairs less than 50% located at rear of property. to include rainlings and framing replacment to bring up to code on top and mid level at rear of property. all work in kind, less than 50%. | $17,000 |
| Aug 8, 2024 | Completed final sign-off Mar 2026 | 61 Majestic Av | to comply with nov 202376545 for dpw encorachment to adjust and meet code requierments at (e) non conforming property line fence at front property line adjust height from 6ft to 3ftDetails
to comply with nov 202376545 for dpw encorachment to adjust and meet code requierments at (e) non conforming property line fence at front property line adjust height from 6ft to 3ft | $3,000 |
| Jun 14, 2024 | Completed final sign-off Jan 2025 | 2106 Jackson St | apt #4: full bathroom remodel, completed demo down to studs replace all mep's within framing & remodel. no wall removal. in kind remodelDetails
apt #4: full bathroom remodel, completed demo down to studs replace all mep's within framing & remodel. no wall removal. in kind remodel | $35,000 |
| Jun 12, 2024 | Completed final sign-off Jul 2024 | 775 38th Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $10,561 |
| Apr 26, 2024 | Completed final sign-off Aug 2024 | 35 Otsego Av | in-kind remodeling of 1 bathroom(s) in basement with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in basement with 1 shower pan(s). | $30,000 |
| Mar 14, 2024 | Completed final sign-off May 2024 | 256 Presidio Av | siding leak repair. remove /dispose of sidng @ unit 1 on south side lightwell 1 segment: replace with new. inspect siding at higher units in same segment and replace as need for leaks. replacement included waterproofing. in kind repair non street facing.Details
siding leak repair. remove /dispose of sidng @ unit 1 on south side lightwell 1 segment: replace with new. inspect siding at higher units in same segment and replace as need for leaks. replacement included waterproofing. in kind repair non street facing. | $10,000 |
| Nov 20, 2023 | Completed final sign-off Jan 2024 | 1058 Haight St | remove & replace bathroom remodel. all (n) fixtures, finishes & tile. (n) tub/shower where old was removed.Details
remove & replace bathroom remodel. all (n) fixtures, finishes & tile. (n) tub/shower where old was removed. | $25,000 |
| Aug 28, 2023 | Completed final sign-off Oct 2023 | 219 Thrift St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). alteration of service equipment.Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). alteration of service equipment. | $40,000 |
| Aug 21, 2023 | Completed final sign-off Nov 2023 | 1724 Moraga St | in-kind remodeling of 1 kitchen(s) in 2nd fl alteration of service equipment.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl alteration of service equipment. | $45,000 |
| Jul 6, 2023 | Completed final sign-off Nov 2023 | 1 Cranleigh Dr | in-kind remodeling of 1 kitchen(s) in 1st fl alteration of service equipment.Details
in-kind remodeling of 1 kitchen(s) in 1st fl alteration of service equipment. | $60,000 |
| Jun 9, 2023 | Completed final sign-off Aug 2023 | 23 Lansdale Av | in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s). alteration of service equipment.Details
in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s). alteration of service equipment. | $35,000 |
| May 23, 2023 | Completed final sign-off Jul 2023 | 256 Presidio Av | unit 2: remove & rpelace bathroom remodel. like for like. new dedicated circuits for gfci. new fixtures and finishes where old were removed.Details
unit 2: remove & rpelace bathroom remodel. like for like. new dedicated circuits for gfci. new fixtures and finishes where old were removed. | $28,000 |
| May 1, 2023 | Completed final sign-off Jun 2023 | 256 Presidio Av | water damage repair- remove all siding on south side lightwell of bldg -install new waterproofing & ext siding in kind approx. 300 sqft. detach plumbing and electrical as necess. restrap existing plumbing & elec. components (in-kind). unit 2 bath-replace damaged wall framing in kind (2-3 studs).Details
water damage repair- remove all siding on south side lightwell of bldg -install new waterproofing & ext siding in kind approx. 300 sqft. detach plumbing and electrical as necess. restrap existing plumbing & elec. components (in-kind). unit 2 bath-replace damaged wall framing in kind (2-3 studs). | $65,000 |
| Apr 20, 2023 | Completed final sign-off Aug 2023 | 47 Milton St | kitchen remodel w/ existing cabinets and new appliances. induction range, remove and replace. add new sub panel for new appliances in the kitchen. replace sink, faucet, hood w/ vent and countertop. new refridgerator where old was removed, new dishwasher where old was removed. no structural workDetails
kitchen remodel w/ existing cabinets and new appliances. induction range, remove and replace. add new sub panel for new appliances in the kitchen. replace sink, faucet, hood w/ vent and countertop. new refridgerator where old was removed, new dishwasher where old was removed. no structural work | $20,000 |
| Feb 1, 2023 | Completed final sign-off Apr 2023 | 311 29th Av | remove and replace bathroom remodel. all new fixtures and finishes. new shower pan and window insert.Details
remove and replace bathroom remodel. all new fixtures and finishes. new shower pan and window insert. | $30,000 |
| Sep 22, 2022 | Completed final sign-off Dec 2022 | 564 Shotwell St | remove/replace in-kind (2) separate bathrooms in same unit. all new fixtures/finishes, (1) w/shower pan, (1) w/shower/tub combo. replace (2) bathroom windows (inserts) in (e) opening for tempered.Details
remove/replace in-kind (2) separate bathrooms in same unit. all new fixtures/finishes, (1) w/shower pan, (1) w/shower/tub combo. replace (2) bathroom windows (inserts) in (e) opening for tempered. | $45,000 |
| Sep 22, 2022 | Completed final sign-off Nov 2022 | 3000 Alemany Bl | remove/replace bathroom in-kind, new fixtures, finishes, new shower pan, in (e) locations.Details
remove/replace bathroom in-kind, new fixtures, finishes, new shower pan, in (e) locations. | $20,000 |
| Jun 30, 2022 | Completed final sign-off Oct 2022 | 530 Grafton Av | remove and replace kitchen remodel with same layout changes; no structural changes. all new fixtures and finishes. remove and replace bathroom remodel with same layout, no structural changes. all new fixtures and finishes.Details
remove and replace kitchen remodel with same layout changes; no structural changes. all new fixtures and finishes. remove and replace bathroom remodel with same layout, no structural changes. all new fixtures and finishes. | $60,000 |
| Jun 30, 2022 | Completed final sign-off Sep 2022 | 2401 Jackson St | unit 7: remove and replace bathroom remodel. all new fixtures and finishes. new shower pan where old was removed.Details
unit 7: remove and replace bathroom remodel. all new fixtures and finishes. new shower pan where old was removed. | $35,000 |
| May 31, 2022 | Completed final sign-off Sep 2022 | 1810 Ulloa St | bathroom remodel. extend bathroom into existing closet space. all new fixtures and finishes. some layout changes. one non-load bearing wall move.Details
bathroom remodel. extend bathroom into existing closet space. all new fixtures and finishes. some layout changes. one non-load bearing wall move. | $40,000 |
| Mar 30, 2022 | Completed final sign-off Jul 2022 | 2401 Jackson St | unit #7: powder room to full bath conversion extending space within (e) unit foyer. new tub / shower combo, new replace (e) finishes + fixtures; toilet + vanity sink.Details
unit #7: powder room to full bath conversion extending space within (e) unit foyer. new tub / shower combo, new replace (e) finishes + fixtures; toilet + vanity sink. | $40,000 |
| Mar 30, 2022 | Completed final sign-off Nov 2022 | 33 Benton Av | revision to no-plan pa# 202109218816. remove 1 door opening & frame / drywall to close. remove 2nd door opening & partial no load bearing wall to open.Details
revision to no-plan pa# 202109218816. remove 1 door opening & frame / drywall to close. remove 2nd door opening & partial no load bearing wall to open. | $2,000 |
| Jan 18, 2022 | Completed final sign-off Jun 2022 | 2641 Greenwich St | kitchen remodel. remove and replace in kind. all new fixtures and finishes. layout to remain the same.Details
kitchen remodel. remove and replace in kind. all new fixtures and finishes. layout to remain the same. | $45,000 |
| Dec 8, 2021 | Completed final sign-off Jun 2022 | 1698 24th Av | add 1 wall within extg foot print of bathroom to form powder kroom with sink and 1 toilet. add pocket door. kitchen upgrade electrical. reinstall extg cabinets and change countertops. upgrade electrical panel.Details
add 1 wall within extg foot print of bathroom to form powder kroom with sink and 1 toilet. add pocket door. kitchen upgrade electrical. reinstall extg cabinets and change countertops. upgrade electrical panel. | $8,000 |
| Oct 19, 2021 | Completed final sign-off Jan 2022 | 850 Head St | remove and replace plywood and stucco finish on rear exterior wall due to discovery during door change from existing building permit# 2021-0810-6124. replace in kind. sheathing replacement is 364 sf of exterior rear yard wallDetails
remove and replace plywood and stucco finish on rear exterior wall due to discovery during door change from existing building permit# 2021-0810-6124. replace in kind. sheathing replacement is 364 sf of exterior rear yard wall | $8,000 |
| Sep 21, 2021 | Completed final sign-off Jun 2022 | 1698 24th Av | remove and replace bathroom. all new fixtures and finishes with same layout changes. new tub, shower, toilet, and double vaniety. new tile to be installed. light per cebc 150.0 (k)Details
remove and replace bathroom. all new fixtures and finishes with same layout changes. new tub, shower, toilet, and double vaniety. new tile to be installed. light per cebc 150.0 (k) | $25,000 |
| Sep 21, 2021 | Completed final sign-off Nov 2022 | 33 Benton Av | remove and replace kitchen. all new fixtures and finishes, new wood flooring. replace range, refrigerator, sink, dishwasher, garbage disposal, all new cabinets, countertops, and backsplash. no stru. work. lights per cebc 150.0(k)Details
remove and replace kitchen. all new fixtures and finishes, new wood flooring. replace range, refrigerator, sink, dishwasher, garbage disposal, all new cabinets, countertops, and backsplash. no stru. work. lights per cebc 150.0(k) | $45,000 |
| Aug 10, 2021 | Completed final sign-off Feb 2022 | 2401 Jackson St | apt 1: bathroom remodel: replace finishes and fixtures fromold to new. new floor & wall tile. new double vanity, new shower over tub, new toilet. new gfci outlet and sconc lights relocation. lights per cec 150.0 (k)Details
apt 1: bathroom remodel: replace finishes and fixtures fromold to new. new floor & wall tile. new double vanity, new shower over tub, new toilet. new gfci outlet and sconc lights relocation. lights per cec 150.0 (k) | $30,000 |
| Aug 10, 2021 | Completed final sign-off Jan 2022 | 850 Head St | remove/replace/remodel 1 (e) kitchen. replace rang with hood, cabinets, countertops, sink, faucet. new tile flooring and backsplash.replace kitchen windows (2) w/in (e) opening. non-street visiable. repalce 2 sets french doors w/in (e) opening. lights per cec 150.0 (k)Details
remove/replace/remodel 1 (e) kitchen. replace rang with hood, cabinets, countertops, sink, faucet. new tile flooring and backsplash.replace kitchen windows (2) w/in (e) opening. non-street visiable. repalce 2 sets french doors w/in (e) opening. lights per cec 150.0 (k) | $50,000 |
| May 14, 2021 | Completed final sign-off Sep 2021 | 1115 Guerrero St | convert e) laundry room to 3/4 bathroom. 91 sqft. (n) curbed shower, toilet, single vanity, floor & wall tiles. all new fixtures & finishes.Details
convert e) laundry room to 3/4 bathroom. 91 sqft. (n) curbed shower, toilet, single vanity, floor & wall tiles. all new fixtures & finishes. | $38,000 |
| Jan 26, 2021 | Completed final sign-off Mar 2021 | 844 Dartmouth St | upper level bath remodling. rip and replace bathroom, remodel with no layout changes. remove and replace finish fixtures, elec and plumbing fixtures; keeping (e) tub. no additional elec will be added, only fixtures replaced in kind.Details
upper level bath remodling. rip and replace bathroom, remodel with no layout changes. remove and replace finish fixtures, elec and plumbing fixtures; keeping (e) tub. no additional elec will be added, only fixtures replaced in kind. | $15,000 |
| Jan 26, 2021 | Completed final sign-off Feb 2021 | 844 Dartmouth St | lower level bath remodling. rip and replace bathroom, remodel with no layout changes. remove and replace finish fixtures, elec and plumbing fixtures; keeping (e) tub. no additional elec will be added, only fixtures replaced.Details
lower level bath remodling. rip and replace bathroom, remodel with no layout changes. remove and replace finish fixtures, elec and plumbing fixtures; keeping (e) tub. no additional elec will be added, only fixtures replaced. | $15,000 |
| Aug 19, 2020 | Never finaled issued Aug 2020, no final | 1115 Guerrero St | remodel bathroom in kind. new tub / shower. new vanity, new toilet. new fixtures. all new fixtures located at same location. no structural changes. new lighting shall comply with ces 150.0 (k) s. no new wall & no (e) wall relocation.Details
remodel bathroom in kind. new tub / shower. new vanity, new toilet. new fixtures. all new fixtures located at same location. no structural changes. new lighting shall comply with ces 150.0 (k) s. no new wall & no (e) wall relocation. | $10,000 |
| Jul 14, 2020 | Completed final sign-off Jan 2021 | 1266 Naples St | addition of 2 full bathrooms with new plumbing & electrical within the existing interior footfrint of the home. project requires no modifications to exterior walls, windows or doors.Details
addition of 2 full bathrooms with new plumbing & electrical within the existing interior footfrint of the home. project requires no modifications to exterior walls, windows or doors. | $45,000 |
| May 27, 2020 | Completed final sign-off Jun 2020 | 4030 Cesar Chavez St | bathroom remodel. rip and replace in kind in existing locations. minor electrical and plumbing changes.Details
bathroom remodel. rip and replace in kind in existing locations. minor electrical and plumbing changes. | $25,000 |
| Jul 22, 2019 | Completed final sign-off Sep 2019 | 199 Margaret Av | repair existing decks as needed less than 50% rear decks, repair in-kind less than 50%Details
repair existing decks as needed less than 50% rear decks, repair in-kind less than 50% | $8,500 |
| May 3, 2018 | Completed final sign-off Nov 2018 | 474 Hearst Av | remodel kitchen. remove wall between kitchen and dining rmDetails
remodel kitchen. remove wall between kitchen and dining rm | $25,000 |
| Sep 25, 2017 | Completed final sign-off Jul 2018 | 836 North Point St | remodel (e) kitchen & (e) bathroom. new flooring and paint. layout remain unchanged. no walls altered or infilled.Details
remodel (e) kitchen & (e) bathroom. new flooring and paint. layout remain unchanged. no walls altered or infilled. | $40,000 |
| Dec 9, 2016 | Completed final sign-off May 2017 | 174 Brighton Av | the project consists of a renovation of a front entry stair.Details
the project consists of a renovation of a front entry stair. | $15,000 |
| May 25, 2016 | Completed final sign-off Aug 2016 | 1773 Oak St | repair deck & stringers stair and some floor joists less than 50% repair, all work in kind not visible fromthe streetDetails
repair deck & stringers stair and some floor joists less than 50% repair, all work in kind not visible fromthe street | $7,000 |
| May 2, 2016 | Completed final sign-off May 2016 | 59 Lee Av | no plans, repair rear(e) stairs, railing and deck, same location, same size - like for like. not to exceed 50%Details
no plans, repair rear(e) stairs, railing and deck, same location, same size - like for like. not to exceed 50% | $5,000 |