Back to kitchen remodel contractors
Seths Crew
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to Jun 2026
- Last 24 months
- 2 permits filed
53 permits since 2000: 44 completed, 2 in progress, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 15 completed. Typically 0 days from filing to permit and 138 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 29, 2024 | Completed final sign-off Jun 2024 | 1650 Quesada Av | move dropped beam into ceiling. bring structure up to code. add shear wall in kitchen and garage. add new footing. no exterior workDetails
move dropped beam into ceiling. bring structure up to code. add shear wall in kitchen and garage. add new footing. no exterior work | $10,000 |
| Feb 16, 2024 | Completed final sign-off Jun 2024 | 1650 Quesada Av | repair dryrot in kitchen. replace siding 80 sq ft. replace in kind.Details
repair dryrot in kitchen. replace siding 80 sq ft. replace in kind. | $4,000 |
| Feb 13, 2024 | Completed final sign-off Jun 2024 | 1650 Quesada Av | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $35,000 |
| Jul 18, 2023 | Completed final sign-off Sep 2023 | 1163 Harrison St | to comply with nov 202309845 to return building into 2 units. re-install kitchen in lower unit. build 1 hr fire rated wall between units. bring upper kitchen into complianceDetails
to comply with nov 202309845 to return building into 2 units. re-install kitchen in lower unit. build 1 hr fire rated wall between units. bring upper kitchen into compliance | $36,250 |
| Dec 1, 2022 | Completed final sign-off Sep 2023 | 2901 Gough St | unit #301: replace fixtures and finishes in bathroom. replace fixtures and finishes in kitchen. no walls removalDetails
unit #301: replace fixtures and finishes in bathroom. replace fixtures and finishes in kitchen. no walls removal | $65,000 |
| Feb 25, 2022 | Completed final sign-off Aug 2022 | 710 Congo St | revision to pa#202201045353. kitchen & bathroom remodel. new windows in kitchen and master bathroom. new siding in rear exterior wall. structural reinforcement.Details
revision to pa#202201045353. kitchen & bathroom remodel. new windows in kitchen and master bathroom. new siding in rear exterior wall. structural reinforcement. | $10,000 |
| Jan 4, 2022 | Completed final sign-off Aug 2022 | 710 Congo St | kitchen remodel replace fixtures & finishes 165 sqft. master bathroom remodel replace fixtures & finishes 81 sqft. guest bathroom remodel replace fixtures & finishes 54 sqft. no structural, no exterior.Details
kitchen remodel replace fixtures & finishes 165 sqft. master bathroom remodel replace fixtures & finishes 81 sqft. guest bathroom remodel replace fixtures & finishes 54 sqft. no structural, no exterior. | $65,000 |
| Jul 12, 2021 | Completed final sign-off Nov 2021 | 1545 Broadway | unit 204; replace fixtures and finishes in kitchen and two bathrooms. no structural work.Details
unit 204; replace fixtures and finishes in kitchen and two bathrooms. no structural work. | $50,000 |
| Jan 15, 2021 | Completed final sign-off Jun 2021 | 214 Missouri St | kitchen remodel replace fixtures and finishes. relocate washer dryer to e closet. no structural work. no exterior workDetails
kitchen remodel replace fixtures and finishes. relocate washer dryer to e closet. no structural work. no exterior work | $30,000 |
| May 27, 2020 | Completed final sign-off Oct 2020 | 611 Gennessee St | replace fixtures and finishes. no structural work. no exterior work. this is a simple kitchen remodel on the first floor. kitchen remodel in-kind.Details
replace fixtures and finishes. no structural work. no exterior work. this is a simple kitchen remodel on the first floor. kitchen remodel in-kind. | $40,000 |
| Oct 6, 2016 | Completed final sign-off Aug 2017 | 52 Landers St | remodel kitchen replace fictures and finishes remove non load bearing wall to create closet for new w/d install new heating unit in attic. install new tankless w/h. remove entry way non load bearing wallsDetails
remodel kitchen replace fictures and finishes remove non load bearing wall to create closet for new w/d install new heating unit in attic. install new tankless w/h. remove entry way non load bearing walls | $12,000 |
| Aug 24, 2016 | Completed final sign-off Mar 2017 | 46 Pond St | kitchen and bathroom remodel on upper level. kitchen-rep fixtures and finishes, 50% min wattage lighting high efficacy. bathroom - rep fixtures and finishes, high efficacy lighting or controlled by manual on sensor with high efficacy main light. no change in wall and opening layout. no structural wkDetails
kitchen and bathroom remodel on upper level. kitchen-rep fixtures and finishes, 50% min wattage lighting high efficacy. bathroom - rep fixtures and finishes, high efficacy lighting or controlled by manual on sensor with high efficacy main light. no change in wall and opening layout. no structural wk | $40,000 |
| Jul 20, 2016 | Completed final sign-off Dec 2016 | 1350 32nd Av | interior kitchen remodel. new fixed skylight @ kitchen (flat roof area). reconfigure bath. partial wall removalDetails
interior kitchen remodel. new fixed skylight @ kitchen (flat roof area). reconfigure bath. partial wall removal | $20,000 |
| Feb 2, 2016 | Completed final sign-off May 2016 | 1 Daniel Burnham Ct | unit # 307: kitchen remodel - replace fixtures and finishes; n/a maher ord. # 155-13Details
unit # 307: kitchen remodel - replace fixtures and finishes; n/a maher ord. # 155-13 | $16,000 |
| Nov 1, 2004 | Completed final sign-off Aug 2005 | 3875 19th St | replace top floor deck in kind,replace (e)exterior wall @kitchen w/new due to severe rot.replace (e)Details
replace top floor deck in kind,replace (e)exterior wall @kitchen w/new due to severe rot.replace (e) | $30,000 |